| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.6 LAccepted-AOC 11 17A 4 MADILINE OPPOSITE SALEM CAMP PO METTUR DAM 636 456 | METTUR DAM | SALEM | TAMIL NADU | 636456 | 1 | Accepted-AOC L1 | |
| 2 | 2₹9.5 L+₹1.3 L (16.3%)Rejected-AOC 2 222 B 10 PONMAGAR METTUR DAM 636 401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | 2 | Rejected-AOC L2 | |
| 3 | 3₹10.0 L+₹1.9 L (22.8%)Rejected-AOC 3 140 H 1 PERIYAR STREET AMMAN NAGAR METTUR DAM 636 401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | 3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | PREETHI ENTERPRISES L2 | SS ENGINEERING CONTRACTOR L3 | LENIN ENGINEERING WORKS L1 |
|---|---|---|---|---|---|---|
| 1.00 | Charges for cutting and removal of existing eroded / corroded sun shield monitor roofing structural materials and placing the scrap materials out side the hot water basin. | 2,354 | kg | 9 ₹21,186 | 10 ₹23,540 | 6.5 ₹15,301 Lowest |
| 2.00 | Charges for loading of required materials from Central Stores and transporting to Cooling Tower. Unloading, leading, lifting and placing at Cooling Tower floor (11 m height), Leading and lowering the scrap from Cooling Tower floor to ground level. Loading, transporting and devolution of scrap materials at Central stores. | 2,354 | kg | 7 ₹16,478 | 8 ₹18,832 | 5.1 ₹12,005.4 Lowest |
| 3.00 | Charges for bending 1 No. MS channel to required radius, drilling 4 Nos. of holes and fabrication of truss. | 61 | Nos | 590 ₹35,990 | 610 ₹37,210 | 480 ₹29,280 Lowest |
| 4.00 | Charges for cutting of rectangular box (Purlin) to required size, edge preparation and drilling 2 Nos. of holes. | 47 | Nos | 360 ₹16,920 | 370 ₹17,390 | 294 ₹13,818 Lowest |
| 5.00 | Charges for fabrication of door (2 halfs) & its supports by cutting the channel, angle & flat to required size, cutting of 2 Nos. cleats, welding and assembling with the sun shield monitor roofing sheets by screwing. | 10 | Nos | 3,550 ₹35,500 | 3,700 ₹37,000 | 2,920 ₹29,200 Lowest |
| 6.00 | Charges for assembling the fabricated truss materials along with purlin and cleat by tightening with required size of bolts & nuts, screwing the sun shield monitor roofing with truss and purlin. (Required bolt will be supplied by TNPGCL). (Screws required for fixing roofing sheets are under contractor scope). | 140 | mtr | 2,350 ₹3,29,000 | 2,450 ₹3,43,000 | 1,920 ₹2,68,800 Lowest |
| 7.00 | Cost of Powder Coated Roof curved sheet of length 1.5 m length x 1 m width at 3.5 m radius (0.45 mm thickness) for Sl.No.6. | 163 | Nos | 1,550 ₹2,52,650 | 1,650 ₹2,68,950 | 1,400 ₹2,28,200 Lowest |
| 8.00 | MS Channel 75 x 40 x 4.8 mm as per: IS 2062 for Sl.No.3. | 536 | kg | 75 ₹40,200 | 80 ₹42,880 | 70 ₹37,520 Lowest |
| 9.00 | MS Rectangular pipe 100 x 50 mm x 3 mm as per: IS 2062 for Sl.No.4. | 1,992 | kg | 75 ₹1,49,400 | 80 ₹1,59,360 | 70 ₹1,39,440 Lowest |
| 10.00 | MS Flat of size 50 x 50x 6mm as per: IS 2062 for Sl.No.5 | 136 | kg | 75 ₹10,200 | 80 ₹10,880 | 70 ₹9,520 Lowest |
Tender Value
Refer Docs
EMD Value
₹9,700
Closing Date
6 May 2025, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I M I CA CWS II Unit III Fabrication and erection of sun shield monitor roofing structure with roofing sheets for replacing the damaged Corroded roofing structure with sheets etc
2025_EB_549543_1
CE / MTPS-I / SE / M-I / CA /OT.11 / 2025-26
Open Tender
Power/Energy Projects/Products
Works
20 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specification
4 documents required · 4 mandatory
₹0
₹9,700
Yes
25 May 2026
22 Apr 2025
7 May 2025
22 Apr 2025
6 May 2025
22 Apr 2025
Amount
Charges for cutting and removal of existing eroded / corroded sun shield monitor roofing structural materials and placing the scrap materials out side the hot water basin.
Charges for loading of required materials from Central Stores and transporting to Cooling Tower. Unloading, leading, lifting and placing at Cooling Tower floor (11 m height), Leading and lowering the scrap from Cooling Tower floor to ground level. Loading, transporting and devolution of scrap materials at Central stores.
Charges for bending 1 No. MS channel to required radius, drilling 4 Nos. of holes and fabrication of truss.
Charges for cutting of rectangular box (Purlin) to required size, edge preparation and drilling 2 Nos. of holes.
Charges for fabrication of door (2 halfs) & its supports by cutting the channel, angle & flat to required size, cutting of 2 Nos. cleats, welding and assembling with the sun shield monitor roofing sheets by screwing.
Charges for assembling the fabricated truss materials along with purlin and cleat by tightening with required size of bolts & nuts, screwing the sun shield monitor roofing with truss and purlin. (Required bolt will be supplied by TNPGCL). (Screws required for fixing roofing sheets are under contractor scope).
Cost of Powder Coated Roof curved sheet of length 1.5 m length x 1 m width at 3.5 m radius (0.45 mm thickness) for Sl.No.6.
MS Channel 75 x 40 x 4.8 mm as per: IS 2062 for Sl.No.3.
MS Rectangular pipe 100 x 50 mm x 3 mm as per: IS 2062 for Sl.No.4.
MS Flat of size 50 x 50x 6mm as per: IS 2062 for Sl.No.5
Cost of 200mm MS Handles (Heavy Duty) for sun shield door for Sl.No.5.
Cost of cutting Gas for Sl.No.4 & 5.
Cost of welding electrodes Sl.No. 5.
Hire charges of bending machine for Sl.No.3.
Cost of Consumable and T & P for Sl.No.1 to 6.
PREETHI ENTERPRISES (BID ID -1328790)
SS ENGINEERING CONTRACTOR (BID ID -1328830)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .