S.E. E D C- MVVNL,Unnao
Superintending Engineer Electricity Distribution Circle-Unnao
Quantum of works involved in Increasing capacity of different rating Distribution Transformer installation/ new and Construction of PCC/ST pole as per requried on site,EDSD-II Magarwara under Divison-II, Unnao. against Business Plan Year 2024-25 p
2024_MVVNL_925297_1
371/E.D.C./Unnao/2023-24
Open Tender
Electrical Works
Fixed-rate
180 days
Unnao
AS PER TENDER DOCUEMNT
2 documents required · 2 mandatory
₹3,540
A/C-No.3355002101008374,IFSC-Code-PUNB0335500
₹18,200
20 Jun 2024
22 May 2024
15 Jun 2024
22 May 2024
14 Jun 2024
22 May 2024
Amount
Carriage of Following material from elec. Store centre unnao to different work dump site along with loading , unloading and proper stocking distance as per indent.
PCC Pole 8.5 mtr long
ACSR Weasal Conductor
L.T. Cable 3-Ph ABC(3X50+1X35+1X16)sqmm
LT XLPE Cable 3.5x70 SQ.MM
AL 1X400 SQMM
Loose line material store to dump site with loading unloding and proper stocking.
Carriage of T/F from ESC Unnao to work site/ site to site with loading, unloading and proper stocking.
Transformer 25 KVA 11/0.4 KV
Transformer 63 KVA 11/0.4 KV
Transformer 100 KVA 11/0.4 KV
Transformer 250 KVA 11/0.4 KV
Supply and Fixing of Following materials
Stone Pad 300x300x75mm
LT Shackle Insulator
LT Clamp with Nut & Bolts
Holding Clamp for PCC Pole 8.5 mtr. Long with Nut & Bolt
Stay clamp with Nut & Bolt
F-Clamp for Top Insulator with N&B
Long Barel Alluminium Lugs 95/120 sqmm.(for 25/63/100 KVA TF)
L ong Barel Alluminium Lugs 400 sqmm(for 250/400 KVA TF)
Flat Copper L pieces set 35x4 mm for LT bushing rod 25/63/100 KVA Distribution Transformer.
Flat Copper L pieces set 50X6 mm for LT bushing rod 250/400 KVA Distribution Transformer.
Stay Insulator
Erection of PCC Single Pole (HT/LT Line) including digging of pits, fitting of all accessories along with cartage & dragging from dump site to pit site.
Erection of PCC Double Pole (11 KV Line) including digging of pits, fitting of all accessories along with cartage & dragging from dump site to pit site.
Fabrication/ Modifications of MS Items as per requirement of site conditions.
Making T-off arrangement including fabrication & fitting of accessories.
Earthing of PCC/STP poles as per RESPO norms
Grouting of Pole as per RESPO Norms with grouting materials.
Digging of pits, fixing nuzzling and grouting of stay rods as per RESPO Norms with grouting materials.
New Earthing for Distribution transformers one neutral and one for body of transformer 40 ft.deep GI pipe of size 40 mm. making all arrangements for its recharging funnel with openable cover of steel chequered plate with hinges and making connections to transformer neutral/body by GI strip of size 35x5 mm after complete running welding and connecting with pipes by clamps/nut bolts and welding.
Construction of T/F plinth, suitable for mounting of distribution transformer Size of the plinth will be 1.5 x 1.5 x1.2 meter (Size may varied as per site conditions) solid with brick work. 75 mm thick C.C. in ratio 1:4:8 with cement, coarse sand and brick ballast laid on the base and 75 mm thick done on all the exposed sides to the plinth.
Fabrication and erection of Distribution Transformer fencing of frame size 2.5x2 Mtr. Including cost of M.S. Angle size 35x35x5 mm and M.S. Flat size 35x5 mm, fixing of welded steel wire fabric on steel frames by welding of 10SWG wire fabric, including Painting of two coats of paint in iron based surfaces with ready mixed paint to give bus green shade including cleaning of oil & dust.
Laying stringing and sagging of O/H Three Phase 11 KV Line by ACSR Weasal Conductor including all associated work with joint/jumpers and binding of insulator with complete all work as required.
Laying stringing and sagging of O/H Three Phase LT Line by ABC (3X50+1X35+1X16)sqmm including all associated work with joint/jumpers and binding of insulator with complete all work as required.
Installation cable termination & commissioning O/H LT XLPE Cable 3.5x70 sqmm including all complete all work as required.
Installation cable termination & commissioning O/H AL Cable 1X400 sqmm including all complete all work as required.
Placement of following 11/0.433 KV Distribution Transformer from dump site to newly constructed T/F on Duble Pole and Installation cable termenation and commissioning of 25/63/100 KVA Transformer including drassing damaged cable, lugs ,Jumpering & connecting Earthing of body & neutral as per required. ( required mattrial as lugs, flat copper L plate, nuts & bolts etc for above job shall be provided by contractor)
Placement of following 11/0.433 KV Distribution Transformer from dump site to newly constructed T/F plinth and Installation cable termenation and commissioning of 250/400 KVA Transformer including drassing damaged cable, lugs ,Jumpering & connecting Earthing of body & neutral as per required. ( required mattrial as lugs, flat copper L plate, nuts & bolts etc for above job shall be provided by contractor)
Dismentling of following different Distribution Transformer on single pole/duble pole/ plinth with safe carrage from pit site to dump site loding and unloding proper stocking.
Transformer 10 KVA 11/0.4 KV
Transformer 16 KVA 11/0.4 KV
Transformer 25 KVA 11/0.4 KV
Transformer 63 KVA 11/0.4 KV
Dismentalling,Carriage,Loading & Unloading of following receive back materials from site to store centre with in 0-20 km :-
Transformer 10 KVA 11/0.4 KV
Transformer 16 KVA 11/0.4 KV
Transformer 25 KVA 11/0.4 KV
Transformer 63 KVA 11/0.4 KV
MAHI ENTERPRISES
S S Enterprises
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .