| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.4 LAccepted-Finance | L1 | Accepted-Finance Financial bid opened and found the bidder as L1 | |
| 2 | L2₹6.6 L+₹16,172.87 (2.52%)Accepted-Finance | L2 | Accepted-Finance Financial bid opened and found the bidder as L2 | |
| 3 | L3₹6.6 L+₹22,905.66 (3.57%)Accepted-Finance | L3 | Accepted-Finance Financial bid opened and found the bidder as L3 | |
| 4 | L4₹6.7 L+₹30,624.41 (4.78%)Accepted-Finance | L4 | Accepted-Finance Financial bid opened and found the bidder as L4 | |
| 5 | L5₹6.9 L+₹51,329.88 (8.01%)Accepted-Finance | L5 | Accepted-Finance Financial bid opened and found the bidder as L5 |
Tender Value
₹6.4 L
EMD Value
₹12,760
Closing Date
25 Sept 2020, 3:00 pmClosed
EE PRIs DP
O/o EE PRIs DP
Construction of CC Road from main road to Babul Das House at Subashgram ward No. 03 under Gram Panchayat Subashgram
2020_RDPRI_975_1
NIT 04/EE/PRIs/DP/2020-21
Open Tender
Civil Works - Roads
Item Rate
90 days
Subashgram
Please refer Tender documents.
5 documents required · 5 mandatory
₹500
The Executive Engineer PRIs, NandMAD-II Diglipur
₹12,760
20 Oct 2020
15 Sept 2020
25 Sept 2020
15 Sept 2020
25 Sept 2020
18 Sept 2020
15 Sept 2020 - 17 Sept 2020
Amount
Earth work in excavation by mechanical means (Hydraulic Excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sum on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the execavated soil and disposal of surplus excavated soil as directed within a lead of 50 m.
All kinds of soil.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work upto plinth level :
1:4:8 (1 cement : 4 Pulverized sand : 8 graded stone aggregate 40 mm nominal size).
1:3:6 (1 cement : 3 Pulverized sand : 6 graded stone aggregate 20 mm nominal size).
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:2:4 (1 cement : 2 Pulverized sand (zone-III) : 4 graded stone aggregate 20 mm nominal size
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
1:1.5:3 (1 cement : 1.5 pulverized sand (zone-III): 3 graded stone aggregate 20 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form work for :
Foundations, footings, bases for columns.ect for mass concrete.
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete.
Thermo-Mechanically Treated bars of grade Fe-500D or more.
12 mm cement plaster of mix :
1:4 (1 cement : 4 River sand)
Extra for making patterns of approved design on cement concrete floors, steps, landing, pavements etc.
Cement concrete flooring 1:2:4 (1 cement : 2 pulverized sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete.
40 mm thick with 20 mm nominal size stone aggregate
Earth work in rough excavation, banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with ½ tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m :
All kinds of soil
VISHAL GORAI
DEBLAL DAS
SHRI. BINOY SARKAR
SHRI. MADHAI MURSHID
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .