Loading…
Loading…
Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3.0 L
EMD Value
₹5,930
Closing Date
23 Mar 2026, 6:55 pmClosed
Executive Engineer REW Pulwama
Executive Engineer REW Pulwama
CONSTRUCTION OF CULVERT FROM LAND OF MOHD AKBER AND OTHERS AT TRICHAL PAYER ROAD AT PAYER PULWAMA
2026_RDPR_306293_1
e- NIT No. 200/2025-26 Dated 16-03-2026
Open Tender
Civil Works
Percentage
10 days
Pulwama
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer REW Pulwama
₹5,930
24 Mar 2026
16 Mar 2026
24 Mar 2026
16 Mar 2026
23 Mar 2026
16 Mar 2026
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:
Providing and laying of dry solling (Nallah) hand packed complete job,including carriage
Providing and laying cement concrete CAST-IN-SITU in retaining walls, ret urn walls, walls (any thic kness) including attached, col umns, piers , abutments, pillars, etc. upto floor five level, exclud ing the cost of centring, shutte ring and finishing: Concre te of nominal mix M-7.5 1:4:8 (1 cement: 4 fine sand : 8 graded stone aggregate 40mm nominal size.
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. Mix 1 2 4
Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
Providing and laying of dry solling hand packed complete job,including carriage
Reinforcement for RCC works incl cutting bending, straightning, etc completeReinforcement for RCC works incl cutting bending, straightning, etc complete
Approach behind abutment by way of GSB/Nallah muck as per specification incl consolidation with PRR all complete
Centering and shuttering including strutting and removal of same Foundations, footings, bases of columns etc. for mass concrete
Centering and shuttering including strutting and removal of same Suspended floors, roofs, landings, balconies and access platforms.
Carriage of sand/agg avg lead 12 km by MT Vide consumption statement
Signboard and photographs and other unforeseen items
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.44 MB
BOQ_994518.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .