| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹65.2 LAccepted-AOC 20 RAJA STREET PALAYAMKOTTAI TIRUNELVELI 627002 | TIRUNELVELI | TAMIL NADU | 627002 | ₹65.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹66.8 LRejected-Finance KRISHNAGIRI | TAMIL NADU | 635001 | ₹66.8 L | L2 | Rejected-Finance L2 |
| 3 | L3₹73.5 LRejected-Finance | ₹73.5 L | L3 | Rejected-Finance L3 |
| 4 | L4₹74.2 LRejected-Finance AMBATTUR | AMBATTUR | TIRUVALLUR | TAMIL NADU | 600053 | ₹74.2 L | L4 | Rejected-Finance L4 |
| 5 | L5₹76.6 LRejected-Finance | ₹76.6 L | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | M CHINNA THAMBI L6 | S.Sethudurai L3 | S.Selvaraj L4 | MARIDURAI AND CO L1 | ANNAMALAI L5 | S MADASAMY L2 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Strengthening of Uchaipotthai – Karaikondarkulam Road km 0/0 - 2/106 in Alangulam Panchayat union under NABARD RIDF XXX | |||||||||
| 2.00 | Clearing Scrub Jungle without alignment for the widening of the formation of the road cutting of trace up to 30mm girth products the cleaning are to be stocked in such a place as ordered by the departmental officer and the ground shall be left in a perfectly clean condition. All holes of hollows whether original, existing (or) produced by digging of roots shall than be carefully filled up the earth well rammed and leveled of and the entire work completed in all respect as per SI 17 (2). | 1,516.32 | Sqm | 11.5 ₹17,437.68 | 5.64 ₹8,552.04 | 5.7 ₹8,643.02 | 4 ₹6,065.28 Lowest | 4 ₹6,065.28 Lowest | 5.94 ₹9,006.94 |
| 3.00 | Picking the existing surface to 50mm to 100mm thick including labour and hire charges for picking tools and plants and all other incidental charges etc complete as per standard specifications. | 2,632.5 | Sqm | 27 ₹71,077.5 | 20.75 ₹54,624.38 | 20.97 ₹55,203.53 | 16 ₹42,120 Lowest | 20.5 ₹53,966.25 | 21.84 ₹57,493.8 |
| 4.00 | Earth work excavation and depositing on bank with an intial of 10m and lift 2m in hard stiff clay, stiff black cotton, hard red earth and earth mixed with small size boulders, hard gravelly soil etc., as per SS 20A including laying and spreading in layer etc.complete. | 758.16 | Cum | 137 ₹1,03,867.92 | 124.73 ₹94,565.3 | 126.05 ₹95,566.07 | 110 ₹83,397.6 Lowest | 130 ₹98,560.8 | 131.29 ₹99,538.83 |
| 5.00Providing laying and compacting red gravel in accordance with requirements of the specification materials shall be in one or more layers as necessary including watering, consolidating by the power roller rolling and all labour charges for soiling including hire charges for consolidation etc. complete. | |||||||||
| 6.00 | km 0/0 - 1/0 | 200 | Cum | 398.5 ₹79,700 | 346.49 ₹69,298 | 350.18 ₹70,036 | 305 ₹61,000 Lowest | 362.5 ₹72,500 | 335 ₹67,000 |
| 7.00 | km 1/0 - 2/0 | 200 | Cum | 410.5 ₹82,100 | 359.49 ₹71,898 | 363.31 ₹72,662 | 315 ₹63,000 Lowest | 377.1 ₹75,420 | 365 ₹73,000 |
| 8.00 | km 2/0 - 2/106 | 21.2 | Cum | 425.5 ₹9,020.6 | 372.49 ₹7,896.79 | 376.45 ₹7,980.74 | 325 ₹6,890 Lowest | 390.5 ₹8,278.6 | 390 ₹8,268 |
| 9.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 125mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 987.19 | Cum | 2,186.5 ₹21,58,490.94 | 2,071.77 ₹20,45,230.63 | 2,093.8 ₹20,66,978.42 | 1,800 ₹17,76,942 Lowest | 2,179.5 ₹21,51,580.61 | 2,040 ₹20,13,867.6 |
| 10.00 | Providing and laying PRIME COAT over the WMM surface using 7.00 Kg of Bituminous Emulsion SS I for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying prime coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification. | 7,897.5 | Sqm | 87.5 ₹6,91,031.25 | 76.86 ₹6,07,001.85 | 77.67 ₹6,13,398.83 | 65 ₹5,13,337.5 | 79.5 ₹6,27,851.25 | 30 ₹2,36,925 Lowest |
Tender Value
₹78.4 L
EMD Value
₹79,000
Closing Date
24 Jan 2025, 3:00 pmClosed
Project Director
DRDA, Tenkasi
Strengthening of Uchaipotthai to Karaikondarkulam Road in alangulam panchayat Union under NABARD RIDF P.No 04
2024_RDTN_514360_4
DIPR/5603/TENDER/2024 -NABARD TSI
Open Tender
Civil Works - Roads
Item Wise
270 days
DRDA
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹79,000
DRDA, Tenkasi
5 Aug 2026
27 Dec 2024
24 Jan 2025
27 Dec 2024
24 Jan 2025
27 Dec 2024
3 Jan 2025
Amount
Strengthening of Uchaipotthai – Karaikondarkulam Road km 0/0 - 2/106 in Alangulam Panchayat union under NABARD RIDF XXX
Clearing Scrub Jungle without alignment for the widening of the formation of the road cutting of trace up to 30mm girth products the cleaning are to be stocked in such a place as ordered by the departmental officer and the ground shall be left in a perfectly clean condition. All holes of hollows whether original, existing (or) produced by digging of roots shall than be carefully filled up the earth well rammed and leveled of and the entire work completed in all respect as per SI 17 (2).
Picking the existing surface to 50mm to 100mm thick including labour and hire charges for picking tools and plants and all other incidental charges etc complete as per standard specifications.
Earth work excavation and depositing on bank with an intial of 10m and lift 2m in hard stiff clay, stiff black cotton, hard red earth and earth mixed with small size boulders, hard gravelly soil etc., as per SS 20A including laying and spreading in layer etc.complete.
Providing laying and compacting red gravel in accordance with requirements of the specification materials shall be in one or more layers as necessary including watering, consolidating by the power roller rolling and all labour charges for soiling including hire charges for consolidation etc. complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 125mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying PRIME COAT over the WMM surface using 7.00 Kg of Bituminous Emulsion SS I for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying prime coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying TACK COAT over the WMM surface (treated with primer) using 2.50 Kg of Bituminous Emulsion RS I for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Provision for rumble strip
Provision for Hectametre stone 0.75x0.23x0.1m
Provision for Kilometre stone 1.65x0.45x0.15m
60 cm Equilateral triangle cautionary signboard
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
Road Marker/ Road stud with lens Reflector
Maintenance Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
S MADASAMY (BID ID -1229954)
S.Sethudurai (BID ID -1230314)
S.Selvaraj (BID ID -1230959)
ANNAMALAI (BID ID -1229756)
M CHINNA THAMBI (BID ID -1229794)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].