Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.8 LAdmitted-Finance | ₹47.8 L | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SCAN CONSTRUCTION L1 |
|---|---|---|---|---|
| 1.00 | Route alignment map using remote sensing method along with field works GPS for both terminal points and along the route including cost of all materials, hire charges for GPS and other T & P including transportation, labour charges, lead, lift etc. complete as per standard specification and as directed by the department engineer at site. | 80 | Kms. | 2,500 ₹2,00,000 Lowest |
| 2.00 | Preparing route alignment map using remote sensing method along with field works with GTS map using 1:50,000 scale including procurement, processing GTS map GEO referanceing, route in the layout with identification of reserved forest developed area, etc., including cost of all materials, labour, all lead, lift etc., complete as per standard specification and as directed by the department engineer at site. | 80 | Kms. | 2,500 ₹2,00,000 Lowest |
| 3.00 | Preparation and submission of route map in colour printout in 1:50,000 scale for route alignment using remote sensing method including cost of all labour, lead, lift etc., complete as directed by the department engineer at site. | 15 | Sets. | 4,000 ₹60,000 Lowest |
| 4.00 | Conducting preliminary survey and detialed survey with GPS, total station and DGPS, plotting profile and tower spotting and submission of report, tower schedule, justification of angle points (10 copies) and profile in duplicate including cost of all materials, transporting, labour, lead, lift, etc. and incorporating the details of exisitng structures viz., coal pipe conveyors, transmission lines, etc., complete and as directed by the Department Engineer at site. | 80 | Kms. | 28,915 ₹23,13,200 Lowest |
| 5.00 | Preparation of crossing drawing in Auto Cad and submission of P & T, EHT, Roads, Railway crossing etc., including cost of all materials, leads, lifts etc., complete. | 10 | Sets. | 1,000 ₹10,000 Lowest |
| 6.00 | Clearing the juliflora jungle for surveying including cost of labour, lead lift etc., complete as directed by department engineer at site. | 54,000 | M2 | 2 ₹1,08,000 Lowest |
| 7.00 | Surveying and taking spot levels by making blocks of 5m intervels and taking levels etc., for preparation of civil layout including Auto CAD charges all labour, lead, lift, T&P charges etc., complete as per standard specification and as directed by the department engineer at site. | 80 | Acre | 8,000 ₹6,40,000 Lowest |
| 8.00 | Labour charges for preparation and supply of ammonia prints and tracing sheet for civil and electrical layout etc., complete. | 80 | M2 | 200 ₹16,000 Lowest |
| 9.00 | Soil investigation by auger up to the depth of 10 M or up to refusal strate where N - value is obtained 50/100 whichever met earlier. Conducting Penetration Test at the change of layer and at specified interval of 1 M to 1.5 M, carrying out las tests as per IS standards, providing report with recommendation for foundation including mobilisation and demobilisation, shifting from location to location, water charges for drilling, etc complete. | 8 | Nos. | 30,000 ₹2,40,000 Lowest |
| 10.00 | Conducting detailed survey with GPS, Total station & DGPS, Plotting profile & tower spotting and submission of report, tower schedule, justification of angle points (10 copies) and profile in duplicate for strengthening of existing EHT lines including cost of all materials lead lift etc complete as directed by the department engineer at site. | 25 | Kms. | 10,399 ₹2,59,975 Lowest |
Tender Value
₹47.8 L
EMD Value
₹47,800
Closing Date
6 Aug 2026, 2:00 pmClosed
SE/GCC-I/CNI
230 KV GIS SS COMPLEX, A-10, THIRU-VI-KA INDUSTRIAL ESTATE, GUINDY, CHENNAI-32.
as per NIT
2026_EB_688129_1
OT-013/26-27 of SE/GCC-I/CNI
Open Tender
Civil Works
Works
365 days
Guindy
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹47,800
Yes
20 Aug 2026
23 Jul 2026
7 Aug 2026
23 Jul 2026
6 Aug 2026
23 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Route alignment map using remote sensing method along with field works GPS for both terminal points and along the route including cost of all materials, hire charges for GPS and other T & P including transportation, labour charges, lead, lift etc. complete as per standard specification and as directed by the department engineer at site. | 80 | Kms. | - | - |
| 2 | Preparing route alignment map using remote sensing method along with field works with GTS map using 1:50,000 scale including procurement, processing GTS map GEO referanceing, route in the layout with identification of reserved forest developed area, etc., including cost of all materials, labour, all lead, lift etc., complete as per standard specification and as directed by the department engineer at site. | 80 | Kms. | - | - |
| 3 | Preparation and submission of route map in colour printout in 1:50,000 scale for route alignment using remote sensing method including cost of all labour, lead, lift etc., complete as directed by the department engineer at site. | 15 | Sets. | - | - |
| 4 | Conducting preliminary survey and detialed survey with GPS, total station and DGPS, plotting profile and tower spotting and submission of report, tower schedule, justification of angle points (10 copies) and profile in duplicate including cost of all materials, transporting, labour, lead, lift, etc. and incorporating the details of exisitng structures viz., coal pipe conveyors, transmission lines, etc., complete and as directed by the Department Engineer at site. | 80 | Kms. | - | - |
| 5 | Preparation of crossing drawing in Auto Cad and submission of P & T, EHT, Roads, Railway crossing etc., including cost of all materials, leads, lifts etc., complete. | 10 | Sets. | - | - |
| 6 | Clearing the juliflora jungle for surveying including cost of labour, lead lift etc., complete as directed by department engineer at site. | 54,000 | M2 | - | - |
| 7 | Surveying and taking spot levels by making blocks of 5m intervels and taking levels etc., for preparation of civil layout including Auto CAD charges all labour, lead, lift, T&P charges etc., complete as per standard specification and as directed by the department engineer at site. | 80 | Acre | - | - |
| 8 | Labour charges for preparation and supply of ammonia prints and tracing sheet for civil and electrical layout etc., complete. | 80 | M2 | - | - |
| 9 | Soil investigation by auger up to the depth of 10 M or up to refusal strate where N - value is obtained 50/100 whichever met earlier. Conducting Penetration Test at the change of layer and at specified interval of 1 M to 1.5 M, carrying out las tests as per IS standards, providing report with recommendation for foundation including mobilisation and demobilisation, shifting from location to location, water charges for drilling, etc complete. | 8 | Nos. | - | - |
| 10 | Conducting detailed survey with GPS, Total station & DGPS, Plotting profile & tower spotting and submission of report, tower schedule, justification of angle points (10 copies) and profile in duplicate for strengthening of existing EHT lines including cost of all materials lead lift etc complete as directed by the department engineer at site. | 25 | Kms. | - | - |
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.48 MB
OT013.pdf
Tender Documents • 0.93 MB
BOQ_827120.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].