Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.3 LAccepted-AOC GOGLA PANDAVESWAR BARDHAMAN 713381 WEST BENGAL INDIA | PANDAVESWAR | BARDHAMAN | WEST BENGAL | 713381 | ₹4.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹4.7 LRejected-Finance SONABANDHI BURDWAN BARDHAMAN 713346 WEST BENGAL INDIA | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | ₹4.7 L | L2 | Rejected-Finance L2 |
| 3 | L3₹4.4 LRejected-Finance MADHAIPUR NUTADANGA BARDHAMAN 713381 WEST BENGAL INDIA | PASCHIM BARDHAMAN | WEST BENGAL | 713381 | ₹4.4 L | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | ANANDAMOY MONDAL L2 | BHATTACHARJEE ENTERPRISE L1 | SEKH KITABUL L3 |
|---|---|---|---|---|---|---|
| 1.00Construction of 5 nos. Ventilation stopping near stone drift in R-II/III seam of No. 6 pit at Manderboni colliery unit of Manderboni South Samla Amalgamated Colliery, Pandaveswar Area. (Inclusive of EPF/CMPF) | ||||||
| 1.01 | Dressing of gallery at the site | 5 | Manshift | 1,280.95 ₹6,404.75 | 1,280.95 ₹6,404.75 | 1,280.95 ₹6,404.75 |
| 1.02 | Cleaning of dberis mixed with Coal at the site | 25 | Cubic meter | 675 ₹16,875 | 655.35 ₹16,383.75 | 695 ₹17,375 |
| 1.03 | Foundation cutting in floor stone | 1.89 | Cubic meter | 4,595 ₹8,684.55 | 4,574.82 ₹8,646.41 | 4,650 ₹8,788.5 |
| 1.04 | Recess cutting in coal | 4.55 | Cubic meter | 1,650 ₹7,507.5 | 1,621.45 ₹7,377.6 | 1,680 ₹7,644 |
| 1.05 | Cement brick work(1:8) | 29.41 | Cubic meter | 6,950 ₹2,04,399.5 | 6,852.59 ₹2,01,534.67 | 7,500 ₹2,20,575 |
| 1.06 | Cement plaster(1:6) | 180.22 | Square Meter | 395 ₹71,186.9 | 378.23 ₹68,164.61 | 398 ₹71,727.56 |
| 1.07 | Loading and unloading materials from surface to underground | 63 | Tubs | 750 ₹47,250 | 723.69 ₹45,592.47 | 775 ₹48,825 |
| 1.08 | Lead for manual carrying of material avg lead(31-45m) | 63 | Tubs | 72 ₹4,536 | 67.84 ₹4,273.92 | 75 ₹4,725 |
| 1.09 | White washing (Double Coats) | 180.22 | Square Meter | 55 ₹9,912.1 | 54.61 ₹9,841.81 | 56 ₹10,092.32 |
Tender Value
₹4.3 L
EMD Value
₹5,500
Closing Date
3 Feb 2026, 9:00 amClosed
Area Survey Officer
Office of the General Manager Pandaveswar Area , P.O. Pandaveswar, Dist.-Paschim Bardhaman, West Bengal-713346
Construction of 5 nos. Ventilation stopping near stone drift in R-II/III seam of No. 6 pit at Manderboni colliery unit of Manderboni South Samla Amalgamated Colliery, Pandaveswar Area
2026_ECL_351797_1
GM/PND/Sur/Ten/25-26/174/370 Dated 21.01.2026
Open Tender
Civil Works - Others
30 days
MSAM Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,500
11 Mar 2026
24 Jan 2026
4 Feb 2026
24 Jan 2026
3 Feb 2026
24 Jan 2026
24 Jan 2026 - 27 Jan 2026
Construction of 5 nos. Ventilation stopping near stone drift in R-II/III seam of No. 6 pit at Manderboni colliery unit of Manderboni South Samla Amalgamated Colliery, Pandaveswar Area. (Inclusive of EPF/CMPF)
Dressing of gallery at the site
Cleaning of dberis mixed with Coal at the site
Foundation cutting in floor stone
Recess cutting in coal
Cement brick work(1:8)
Cement plaster(1:6)
Loading and unloading materials from surface to underground
Lead for manual carrying of material avg lead(31-45m)
White washing (Double Coats)
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.62 MB
BOQ_364570.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid