| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.5 CrAccepted-AOC | ₹2.5 Cr | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹2.6 CrRejected-Finance | ₹2.6 Cr | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹2.6 CrRejected-Finance | ₹2.6 Cr | L-3 | Rejected-Finance L-3 |
| 4 | L-4₹2.7 CrRejected-Finance 99 SUSHILA BIHAR BHUD BULANDSHAHAR | ₹2.7 Cr | L-4 | Rejected-Finance L-4 |
| 5 | L-5₹2.7 CrRejected-Finance | ₹2.7 Cr | L-5 | Rejected-Finance L-5 |
| Sl No | Description | Qty | Unit | M/S Vinay Construction L1 | M/S CHAUDHARY ENTERPRISES L4 | SRI NATH INFRA CONSTRUCTIONS LLP L3 | VIVEK KUMAR SINGH THEKEDAR L2 | M/S KASON CONSTRUCTION L6 | M/S SURESH CHANDRA GUPTA L5 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Jungle clearance with cutting heavy under growth and Bushes up to 7.5 cm dia including all T&P etc all complete. | 34,953 | M2 | 1.5 ₹52,429.5 Lowest | 2 ₹69,906 | 2.05 ₹71,653.65 | 2 ₹69,906 | 2.5 ₹87,382.5 | 2.11 ₹73,750.83 |
| 2.00 | Earth work in Excavation of foundation for all type of soil with disposal within 30 m lead and 1.50 m lift etc. required proper completion of work. | 1,535.03 | M3 | 70 ₹1,07,452.1 Lowest | 90 ₹1,38,152.7 | 76.09 ₹1,16,800.43 | 90 ₹1,38,152.7 | 90 ₹1,38,152.7 | 78.55 ₹1,20,576.61 |
| 3.00 | Earthwork in Mar, Rankar and Kankar mixed soils in embankment for filling including lead and lift with dressing, making profile with proper compaction. all labour charges T&P etc. as per direction of Engineer -in-charge. | 18,147.53 | M3 | 200 ₹36,29,506 | 140 ₹25,40,654.2 Lowest | 245.45 ₹44,54,311.24 | 150 ₹27,22,129.5 | 158 ₹28,67,309.74 | 253.4 ₹45,98,584.1 |
| 4.00 | Supply and laying sand in foundation, including cost of all material, labour T&P etc all complete. | 1,229.58 | M3 | 1,500 ₹18,44,370 Lowest | 1,500 ₹18,44,370 Lowest | 1,851.31 ₹22,76,333.75 | 2,050 ₹25,20,639 | 2,068 ₹25,42,771.44 | 1,911.21 ₹23,49,985.59 |
| 5.00 | Supplying and laying of 11.20 to 19 mm size stone ballast under dry stone pitching including cost of all material, labour T&P etc. all complete. | 360 | M3 | 1,600 ₹5,76,000 Lowest | 1,800 ₹6,48,000 | 1,673.75 ₹6,02,550 | 1,900 ₹6,84,000 | 2,000 ₹7,20,000 | 1,727.91 ₹6,22,047.6 |
| 6.00 | Supplying and laying of 45 to 63 mm size stone ballast under dry stone pitching including cost of all material, labour T&P etc. all complete. | 2,233.6 | M3 | 1,200 ₹26,80,320 | 1,250 ₹27,92,000 | 1,185.3 ₹26,47,486.08 | 782 ₹17,46,675.2 Lowest | 1,400 ₹31,27,040 | 1,223.65 ₹27,33,144.64 |
| 7.00 | Laying Cement concrete 1:3:6 with cement, coarse sand and Stone grit including Mixing , laying ,ramming , curing and cost of all Material, Labour T&P etc all complete. | 307.9 | M3 | 4,000 ₹12,31,600 | 4,500 ₹13,85,550 | 3,767.52 ₹11,60,019.41 Lowest | 4,400 ₹13,54,760 | 4,300 ₹13,23,970 | 3,889.43 ₹11,97,555.5 |
| 8.00 | R.C.R. Stone Masonary in 1:4 Cement & Coarse Sand including cost of all Material, labour, T&P, Curing etc all complete. | 1,434.28 | M3 | 4,900 ₹70,27,972 | 5,695 ₹81,68,224.6 | 4,664.41 ₹66,90,069.97 Lowest | 5,510 ₹79,02,882.8 | 5,500 ₹78,88,540 | 4,815.33 ₹69,06,531.51 |
| 9.00 | Raised Struck cement pointing in 1:2 CM with cement and coarse sand including cost of all material, labor T&P etc. all complete. | 5,223.24 | M2 | 100 ₹5,22,324 Lowest | 130 ₹6,79,021.2 | 113.23 ₹5,91,427.47 | 138.25 ₹7,22,112.93 | 135 ₹7,05,137.4 | 116.89 ₹6,10,544.52 |
| 10.00 | Laying CC 1:1.5:3 with cement , coarse sand and Stone grit including Mixing with machine , laying , curing and cost of all Material, Labour T&P etc all complete . | 341.3 | M3 | 5,500 ₹18,77,150 | 5,800 ₹19,79,540 | 4,787.06 ₹16,33,823.58 Lowest | 5,630 ₹19,21,519 | 5,400 ₹18,43,020 | 4,941.95 ₹16,86,687.54 |
Tender Value
₹3.2 Cr
EMD Value
₹6.4 L
Closing Date
25 Jun 2026, 2:30 pmClosed
Supertending Engineer
Irrigation Work Circle Banda
Restrocation work of Ohan Dam in Block Manikpur of district Chitrakoot. (Lot-01)
2026_UPIDC_1148966_3
02/SE/2026-27
Open Tender
Civil Works
Item Wise
360 days
Chitrakoot
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,900
₹6.4 L
24 Aug 2026
19 Jun 2026
25 Jun 2026
19 Jun 2026
25 Jun 2026
19 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Jungle clearance with cutting heavy under growth and Bushes up to 7.5 cm dia including all T&P etc all complete. | 34,953 | M2 | 2.5 | ₹87,382.5 |
| 2 | Earth work in Excavation of foundation for all type of soil with disposal within 30 m lead and 1.50 m lift etc. required proper completion of work. | 1,535.03 | M3 | 92.9 | ₹1,42,604.29 |
| 3 | Earthwork in Mar, Rankar and Kankar mixed soils in embankment for filling including lead and lift with dressing, making profile with proper compaction. all labour charges T&P etc. as per direction of Engineer -in-charge. | 18,147.53 | M3 | 299.7 | ₹54,38,814.74 |
| - | Supply and laying sand in foundation, including cost of all material, labour T&P etc all complete. | 1,229.58 | M3 | 2,260.45 | ₹27,79,404.11 |
| - | Supplying and laying of 11.20 to 19 mm size stone ballast under dry stone pitching including cost of all material, labour T&P etc. all complete. | 360 | M3 | 2,043.65 | ₹7,35,714 |
| - | Supplying and laying of 45 to 63 mm size stone ballast under dry stone pitching including cost of all material, labour T&P etc. all complete. | 2,233.6 | M3 | 1,447.25 | ₹32,32,577.6 |
| - | Laying Cement concrete 1:3:6 with cement, coarse sand and Stone grit including Mixing , laying ,ramming , curing and cost of all Material, Labour T&P etc all complete. | 307.9 | M3 | 4,600.15 | ₹14,16,386.18 |
| - | R.C.R. Stone Masonary in 1:4 Cement & Coarse Sand including cost of all Material, labour, T&P, Curing etc all complete. | 1,434.28 | M3 | 5,695.25 | ₹81,68,583.17 |
| - | Raised Struck cement pointing in 1:2 CM with cement and coarse sand including cost of all material, labor T&P etc. all complete. | 5,223.24 | M2 | 138.25 | ₹7,22,112.93 |
| - | Laying CC 1:1.5:3 with cement , coarse sand and Stone grit including Mixing with machine , laying , curing and cost of all Material, Labour T&P etc all complete . | 341.3 | M3 | 5,845 | ₹19,94,898.5 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.48 MB
TDOhan.pdf
Tender Documents • 3.39 MB
AD.pdf
Additional Documents • 3.10 MB
BOQ_2178139.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].