Macadamization Abdul Ahad Sofi Makhdoom Pora to Masjid Sheikh-Ul-Alam.
2026_HAUDD_321274_1
ENIT/47/CRD/SMC/DT.17-08-2026
Open Tender
Civil Works
Percentage
10 days
MAKHDOOM PORA
REFER TENDER DOCS
2 documents required · 2 mandatory
₹600
MUNICIPAL ACCOUNT
₹20,000
3 Sept 2026
19 Aug 2026
5 Sept 2026
19 Aug 2026
3 Sept 2026
19 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking out of GEOTAGGED photographs of size 150mm x 100mm at site before execution of work, during execution and after completion of work including submitting the same to the engineer incharge. | 15 | No. | 20 | ₹300 |
| 2 | Surface dressing of ground including removing vegetation and inequalities, not exceeding 15cm deep and disposal of the rubbish beyond SMC limits in all kinds of soils including all its leads, lifts, loading, unloading, head load (if any) costs & carriages etc., complete. | 308 | Sqm | 24.12 | ₹7,428.96 |
| 3 | Supply, stacking and laying of WBM grade 1st with specified graded stone aggregate 90mm - 45mm size broken query stone @1.21cum to 1.43cum/10sqm of road surface duly hand packed including screening, sorting, spreading to template, watering and consolidation to required gradient and camber with (80-100) KN road roller all inclusive leads, lifts, loading, unloading, head load if any and carriage of materials from nearest approved source to site of work complete (To be laid as per guide line of MOST specification). Finished work to be measured and paid. | 3.47 | Cum | 2,200 | ₹7,634 |
| 4 | Supply/ stacking and laying of WBM Grade 2 with specified graded stone aggregate 63mm to 45mm size broken quarry stone @ 0.91 cum to 1.07 cum per 10 sqm of road surface and using of screening 13.2mm size @ 0..12 cum to .15 cum per 10sqm and binding material @ 0.06cum to 0.09 cum per 10sqm of road surface incl sorting , spreading to template , watering and consolidation to required gradient and camber with 80 to 100 KN Road roller all inclusive leads ,lifts , loading , unloading , head load if any and carraige of materials from nearest approved source to site of work complete ( to be laid as per the guidelines of MOST Specifications). Finished work to be measured and paid. | 3.47 | Cum | 2,350 | ₹8,154.5 |
| 5 | Scarifying the existing bituminous road surface to a depth of 50mm and disposal of scarified material within all lifts and lead upto 1KM by mechanical means. | 212.03 | Sqm | 5.55 | ₹1,176.77 |
| 6 | Providing, Laying, Spreading & Compacting graded stone aggregate (size range 53mm to 0.075mm) to wet mix macadam (WMM) specifications including mixing the material with water at OMC mechanical mixer plant carriage of mixed material by Tipper at site with all leads and lifts laying in uniform layers in sub base/ base course on a well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density complete as per technical specification of clause 406.(75mm thick compacted). | 36.23 | Cum | 1,885.95 | ₹68,327.97 |
| 7Providing and applying tack coat using hot straight run bitumen of VG 10 grade including heating the bitumen and spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface to remove all dirt, dust, mud etc and finally brooming the surface as per required specification. (Including cost & carriage of all materials involved upto site of work complete). | |||||
| 7.1 | On WBM surface using tar @0.75kg/sqm. | 483.08 | Sqm | 74.35 | ₹35,917 |
| 7.2 | On BT surface using tar @0.5 kg/sqm. | 930.49 | Sqm | 55.2 | ₹51,363.05 |
| 8 | Providing/ laying 50mm thick compacted bituminousmacadam base course with stone aggregate of quality, size and grading as per specified in most specification and straight run bitumen of VG 10 @ 3.3% by weight of total mix including hot mixing of stone aggrt. and bitumen in hot mix plant transporting and laying mixed material with paver finisher to the required level and grade. rolling with road roller of 8 to 10 ton capacity to achieve the required compaction and density (including cost & carriage of all materials involved upto site of work complete). | 30.51 | Cum | 8,590.95 | ₹2,62,109.88 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.45 MB
BOQ_1072151.xls
BOQ • 0.29 MB
47NITEXTENSION1STEXTAFTER1STFRESH.pdf
PDF • 1.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].