| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 CrAccepted-AOC 95 PAVALI ROAD VIRUDHUNAGAR 626 001 | VIRUDHUNAGAR | TAMIL NADU | 626001 | ₹2.8 Cr | L1 | Accepted-AOC LER |
| 2 | L2₹2.8 Cr+₹4.7 L (1.69%)Rejected-Finance | ₹2.8 Cr+₹4.7 L (1.69%) | L2 | Rejected-Finance AER |
| Sl No | Description | Qty | Unit | SREE BALAJI CONSTRUCTIONS L2 | GMARIAPPANANDCO L1 |
|---|---|---|---|---|---|
| 1.00Part-1:- Strengthening of Sirukulam Mamsapuram road to Appaneri road (KM 0/0 - 1/8) | |||||
| 1.01 | Clearing Scrub Jungle without alignment for the widening of the formation of the road cutting of trace up to 30mm girth products the cleaning are to be stocked in such a place as ordered by the departmental officer and the ground shall be left in a perfectly clean condition. All holes of hollows whether original, existing (or) produced by digging of roots shall than be carefully filled up the earth well rammed and leveled of and the entire work completed in all respect as per SI 17 (2). | 1,890 | Sq.m. | 6 ₹11,340 Lowest | 6 ₹11,340 Lowest |
| 1.02 | Picking Existing old Bt surface upto 50 to 100cm thick include all cost and conveyance of amterials etc., complete | 2,257.08 | Sq.m. | 23 ₹51,912.84 Lowest | 23 ₹51,912.84 Lowest |
| 1.03 | Earth work excavation and depositing on back with an intial of 10m and lift 2m in hard stiff clay, stiff black cotton, hard red earth and earth mixed with small size boulders, hard gravelly soil etc., as per SS 20A including laying and spreading in layer etc.complete. | 1,890 | Cu.m. | 150 ₹2,83,500 | 140 ₹2,64,600 Lowest |
| 1.04Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp | |||||
| 1.05 | KM 0/0-1/0 | 480 | Cu.m. | 611 ₹2,93,280 Lowest | 611 ₹2,93,280 Lowest |
| 1.06 | KM 1/0-1/8 | 384 | Cu.m. | 621 ₹2,38,464 Lowest | 621 ₹2,38,464 Lowest |
| 1.07 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 1,018.96 | Cu.m. | 2,500 ₹25,47,400 | 2,380 ₹24,25,124.8 Lowest |
| 1.08 | Providing and laying of Prime coat using 7 Kg of Bituminous Emulsion-SS-1 for 10 sqm over the WMM surface preparatory to another bituminous construction over it including, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | 6,793 | Sq.m. | 86 ₹5,84,198 Lowest | 86 ₹5,84,198 Lowest |
| 1.09 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | 6,793 | Sq.m. | 20 ₹1,35,860 Lowest | 20 ₹1,35,860 Lowest |
Tender Value
Refer Docs
EMD Value
₹2.9 L
Closing Date
20 Feb 2026, 3:00 pmClosed
Project Director, DRDA, Virudhunagar
DRDA, Collectorate Virudhunagar
Strengthening of Sirukulam Mamsapuram road to Appaneri road KM 0/0 - 1/8 at Sattur Block of Virudhunagar District under MGSMT-2025-26-Additional in Package no.1
2026_RDTN_658296_1
DIPR.1097/Tender/2026
Open Tender
Civil Works - Roads
Item Rate
180 days
Sattur Block
Two cover system. Refer tender document.
5 documents required · 5 mandatory
₹0
₹2.9 L
12 Mar 2026
15 Feb 2026
20 Feb 2026
15 Feb 2026
20 Feb 2026
18 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Part-1:- Strengthening of Sirukulam Mamsapuram road to Appaneri road (KM 0/0 - 1/8) | - | - | - | - |
| - | Clearing Scrub Jungle without alignment for the widening of the formation of the road cutting of trace up to 30mm girth products the cleaning are to be stocked in such a place as ordered by the departmental officer and the ground shall be left in a perfectly clean condition. All holes of hollows whether original, existing (or) produced by digging of roots shall than be carefully filled up the earth well rammed and leveled of and the entire work completed in all respect as per SI 17 (2). | 1,890 | Sq.m. | - | - |
| - | Picking Existing old Bt surface upto 50 to 100cm thick include all cost and conveyance of amterials etc., complete | 2,257.08 | Sq.m. | - | - |
| - | Earth work excavation and depositing on back with an intial of 10m and lift 2m in hard stiff clay, stiff black cotton, hard red earth and earth mixed with small size boulders, hard gravelly soil etc., as per SS 20A including laying and spreading in layer etc.complete. | 1,890 | Cu.m. | - | - |
| - | Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp | - | - | - | - |
| - | KM 0/0-1/0 | 480 | Cu.m. | - | - |
| - | KM 1/0-1/8 | 384 | Cu.m. | - | - |
| - | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 1,018.96 | Cu.m. | - | - |
| - | Providing and laying of Prime coat using 7 Kg of Bituminous Emulsion-SS-1 for 10 sqm over the WMM surface preparatory to another bituminous construction over it including, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | 6,793 | Sq.m. | - | - |
| - | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | 6,793 | Sq.m. | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.17 MB
01_SAT.pdf
Tender Documents • 0.72 MB
BOQ_789732.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .