Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.5 LAccepted-AOC NO 3 727 MAIN ROAD ADHICHAPURAM VILLAGE MANNARGUDI THIRUVARUR DT PINCODE 614717 | MANNARGUDI | THIRUVARUR | TAMIL NADU | 614717 | ₹35.5 L | L1 | Accepted-AOC L1 Bidder |
| 2 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | BBA ASSOCIATES L1 |
|---|---|---|---|---|
| 1.00Strengthening of Soamasi to Sabapathipuram Road km 0/0 - 1/115 | ||||
| 2.00 | Clearing the Scrub jungle including all labour charges for burrying and burning etc., | 549 | Sqm | 6.36 ₹3,491.64 Lowest |
| 3.00 | Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m | 1,115 | Sqm | 23.36 ₹26,046.4 Lowest |
| 4.00 | Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting side drain etc, complete. as per SS20 A | 164.7 | Cum | 140.46 ₹23,133.76 Lowest |
| 5.00Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction | ||||
| 6.00 | Km 0/0-1/0 | 60 | Cum | 1,050 ₹63,000 Lowest |
| 7.00 | Km1/0-1/115 | 6.9 | Cum | 1,000 ₹6,900 Lowest |
| 8.00Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | ||||
| 9.00 | Km 0/0-1/0 | 375.75 | Cum | 3,000 ₹11,27,250 Lowest |
| 10.00 | Km1/0-1/115 | 43.13 | Cum | 3,000 ₹1,29,390 Lowest |
Tender Value
Refer Docs
EMD Value
₹44,400
Closing Date
20 Feb 2026, 3:00 pmClosed
Additional Collector(Dev)/Project Officer
1st floor, DRDA, Collectorate campus,Tiruvarur
Strengthening Soamasi to Sabapathipuram Road 1115m
2026_RDTN_657903_12
DIPR/1085/Tender/2026 dt 14.02.2026
Open Tender
Civil Works - Roads
Item Rate
180 days
Kottur
Please refer Tender documents.
10 documents required · 10 mandatory
₹0
₹44,400
1st floor, DRDA, Collectorate campus,Tiruvarur
3 Jul 2026
14 Feb 2026
20 Feb 2026
14 Feb 2026
20 Feb 2026
14 Feb 2026
17 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Strengthening of Soamasi to Sabapathipuram Road km 0/0 - 1/115 | - | - | - | - |
| 2 | Clearing the Scrub jungle including all labour charges for burrying and burning etc., | - | Sqm | - | - |
| 3 | Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m | - | Sqm | - | - |
| 4 | Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting side drain etc, complete. as per SS20 A | 1 | Cum | - | - |
| 5 | Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction | - | - | - | - |
| 6 | Km 0/0-1/0 | - | Cum | - | - |
| 7 | Km1/0-1/115 | - | Cum | - | - |
| 8 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | - | - | - | - |
| 9 | Km 0/0-1/0 | - | Cum | - | - |
| 10 | Km1/0-1/115 | - | Cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
Pack12_Technical_Bid_Doc.pdf
Tender Documents • 0.38 MB
Pack12_Price_Bid_Doc.pdf
Additional Documents • 0.27 MB
BOQ_789393.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].