Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 LAccepted-AOC | ₹3.2 L | L1 | Accepted-AOC Tender accepted as per lowest value |
| 2 | L2₹3.3 LRejected-Finance | ₹3.3 L | L2 | Rejected-Finance Quoted High Value |
| 3 | L3₹3.7 LRejected-Finance | ₹3.7 L | L3 | Rejected-Finance Quoted High Value |
| Sl No | Description | Qty | Unit | MURTHY E V L2 | Gees Epc Services Pvt. Ltd. L3 | GURUSAMY KARUPPABOYAN L1 |
|---|---|---|---|---|---|---|
| 1.00 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works basement | 97.5 | M3 | 671 ₹65,422.5 | 900 ₹87,750 | 663 ₹64,642.5 Lowest |
| 2.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification | 872.96 | Kg. | 87 ₹75,947.52 | 95 ₹82,931.2 | 86 ₹75,074.56 Lowest |
| 3.00 | Reinforced cement concrete 1:2:4 using 20mm size hard broken stone excluding cost of reinforcement and centering standard charges asper specification for plinth beam | 20.67 | M3 | 6,520 ₹1,34,768.4 | 7,000 ₹1,44,690 | 6,452 ₹1,33,362.84 Lowest |
| 4.00 | GST @ 18% | 1 | LS | 49,704.92 ₹49,704.92 | 59,766.8 ₹59,766.8 | 49,154.54 ₹49,154.54 Lowest |
Tender Value
₹3.5 L
EMD Value
₹3,500
Closing Date
10 Jul 2026, 3:00 pmClosed
Deputy Director
O/o Director Arignar Anna Zoological Park Vandalur
CONSTRUCTION OF U-DRAIN WALL AT ZOO PREMISES (NEAR MAIN CAR PARKING AREA)
2026_TNFD_682917_1
4001/2026/D
Open Tender
Civil Works
Works
Arignar Anna Zoological park
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹3,500
30 Jul 2026
26 Jun 2026
11 Jul 2026
26 Jun 2026
10 Jul 2026
26 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works basement | 97.5 | M3 | 710.9 | ₹69,312.75 |
| 2 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification | 872.96 | Kg. | 92.97 | ₹81,159.09 |
| 3 | Reinforced cement concrete 1:2:4 using 20mm size hard broken stone excluding cost of reinforcement and centering standard charges asper specification for plinth beam | 20.67 | M3 | 6,901.9 | ₹1,42,662.27 |
| 4 | GST @ 18% | 1 | LS | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.24 MB
40012026DUDrainwall.pdf
Tender Documents • 1.26 MB
BOQ_820956.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].