| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC | ₹1.3 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.3 Cr+₹77,514 (0.59%)Rejected-AOC | ₹1.3 Cr+₹77,514 (0.59%) | L2 | Rejected-AOC L2 |
Tender Value
₹1.4 Cr
EMD Value
₹3.1 L
Closing Date
2 Dec 2020, 3:00 pmClosed
Additional Collector
Drda,Cuddalore
Upgrading of road fromMRL16-KOZHAI VILLAGE TO ANTHONIYAPURAM ROAD VIA KALLUMEDU km-3.5 in Kattumannarkoil block Under PMGSY III Batch-1 2020-21 Package No.TN-03-129
2020_RDTN_101774_1
TN03129
Open Tender
Civil - Roads and Bridges
Item Rate
270 days
Cuddalore
As per tender
5 documents required · 5 mandatory
₹0
₹3.1 L
Yes
Drda,Cuddalore
19 Feb 2021
23 Oct 2020
2 Dec 2020
23 Oct 2020
2 Dec 2020
23 Oct 2020
11 Nov 2020
Amount
Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. Km 0/0-2/750
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 km 0/0-1/0
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Filling with Cut Earth) km 0/0-1/0
Construction of embankment with approved material obtained from borrow pits with all lifts upto 1.5m, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.1 and 300.2 with lead upto 1000 m as per Technical Specification Clause 301.5 ( Carted Earth) Km 0/0-1/0
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Gravel shoulder) km 0/0-1/0
Construction of subgrade for 300mm depth by using picked material obtained from the existing surface by mechanical means and then adding 50% of defict materials by using fly ash obtained from industries with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.( subgrade using fly ash to improve CBR 7 to 9)) Km 0/0-1/0
Construction of Granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402 Grading C Km 0/0-1/0
Providing, laying, spreading and compacting graded stone aggregate to Wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub base/base course on a well prepared surface and compacting with vibratory roller to achieve the desired density Km 0/0-1/0
Providing and applying Primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 Km 0/0-1/0
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surface treated with Primer cleaned with Hydraulic broom as per Technical Specification Clause 503.Km 0/0-1/0
Providing, laying and rolling of Open-Graded Premix Carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508.Km 0/200-1/0
Providing and laying Seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510 Km 0/0-1/0
Provision of Rumble Strips with premix Bituminous carpet Provision of 15 nos. rumble strips covered with premix bituminous carpet, 15-20mm high at centre, 250mm wide placed at 1m centre-to-centre approved locations to control speed, marked with while strips of road marking paint. Rumble Strips = 3 X 3.75 X 0.25 = 2.81 Km 0/0-1/0
Road Marking With Hot Applied Thermoplastic Compound With reflectorising Glass Beads on Bituminous Surface:- Providing and laying of hot applied thermoplastic compound 2.50mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35, The finished surface to be level uniform and free from streaks and holes etc complete as per MORTH&H specification No.803 Km 0/0-1/0
1.5M Span culvert Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.Construction of culvert @ 0/200
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.Construction of Culvert @ 0/200
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.Construction of Culvert @ 0/200
Below sill level - Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.Construction of Culvert @ 0/200
Above sill level - Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.Construction of Culvert @ 0/200
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.Construction of Culvert@0/200
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft Paper Construction of Culvert@ 0/200
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor. Construction of Culvert @ 0/200
Providing Fixing 20mm thick Compressible Fiber Board in expansion joint complete as per drawing and MORD technical Specification.Construction of Culvert@ 0/200
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab Construction of Culvert @ 0/200
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification COnstruction of culvert @ 0/200
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officerConstruction of Culvert @ 0/200
3.0M Span culvert Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.Construction of culvert @ 0/080
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.Construction of Culvert @ 0/080
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.Construction of Culvert @ 0/080
Below sill level - Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.Construction of Culvert @ 0/080
Above sill level - Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.Construction of Culvert @ 0/080
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.Construction of Culvert@0/080
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft Paper Construction of Culvert@ 0/080
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor. Construction of Culvert @ 0/080
Providing Fixing 20mm thick Compressible Fiber Board in expansion joint complete as per drawing and MORD technical Specification.Construction of Culvert@ 0/080
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab Construction of Culvert @ 0/080
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification COnstruction of culvert @ 0/080
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officerConstruction of Culvert @ 0/080
Protective works Km 0/080- 0/130 RHS Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Protective works Km 0/080- 0/130 RHS Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Protective works Km 0/080- 0/130 RHS Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Protective works Km 0/080- 0/130 RHS Cement concrete 1 : 2 : 4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Below Ground level Footing
Protective works Km 0/080- 0/130 RHS Cement concrete 1 : 2 : 4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Above Ground level Body wall
Protective works Km 0/080- 0/130 RHS Providing Weepholes in brick masonary, Plain/Reinforced Concrete abutment, wing wall, return wall with 100mm dia AC Pipe extending through the full width of the structures with slope of 1(V) : 20(H) towards drawing face coplete as per drawing and technical specification Clauses 614, 709, 1204 3.7
Providing and Fixing 'Logo' of PMGSY project
Providing and Fixing Name Board project
Providing and Fixing 'Citizen information Board' of PMGSY project
Providing and fixing 'Maintanence information Board' of PMGSY Project
Providing and fixing of cautionary, mandatory and in formatory sign Board Providing and fixing of Retro Reflectorised Cautionary, Mandatory signs with definition plate made out of high intensity Grade prismatic sheeting coiformation to IRC-67:2010 & ASTM D, Type IVspecification and fixed over 1.5mm thick Aluminium sheet fixed on back support frame of 25mm x 25mm x3mm Mild steel angle and supported on a mild steel angle iron post 75mm x 75mm x 6mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45cm x 45cm x 60cm below ground level etc complete including 7years warrenty for the Retro Reflective Sheeting as per clause 6.9 of IRC 67-2010 specification(as per MORT & spec. No. 801) 90CM Equilateral Trainagle (Cautinary) Sign Board
60CM Circular (Mandatory) Sign Board
Chevron Signs 90Cm Octagon (Curves)
Reflector
Kilometre stone Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical specification Clause 1703 i) Ordanary Kilometer Stone (Precast)
ii) 200m Stone
iii) Guard Stone
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
G SATHEESH
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .