| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.9 LAccepted-AOC | ₹15.9 L | L1 | Accepted-AOC Lowest Bidder |
| 2 | L2₹16.6 L+₹71,545.97 (4.49%)Rejected-Finance | ₹16.6 L+₹71,545.97 (4.49%) | L2 | Rejected-Finance Rejected as the bidder is L2 |
| 3 | L3₹18.1 L+₹2.1 L (13.4%)Rejected-Finance | ₹18.1 L+₹2.1 L (13.4%) | L3 | Rejected-Finance Rejected as the bidder is L3 |
| 4 | L4₹18.1 L+₹2.1 L (13.5%)Rejected-Finance AUCKLAND ZIGZAG ROAD MERRY VILLA DARJEELING | DARJEELING | DARJEELING | WEST BENGAL | 734101 | ₹18.1 L+₹2.1 L (13.5%) | L4 | Rejected-Finance Rejected as the Bidder is L4 |
| 5 | Rejected-Technical | - | - | Rejected-Technical Technically rejected |
Tender Value
₹17.9 L
EMD Value
₹35,773
Closing Date
19 Aug 2026, 12:00 pmClosed
Executive Engineer
Executive Engineer, Kurseong Engineering Division, De Marie Lodge, GTA, Kurseong
Construction of Chain Link Fencing along the roadside at Cindey Golai across Rambi Khola under DCOMP.
2026_GTA_1036350_2
02 / EE/KED/GTA of 2026-2027
Open Tender
CIVIL WORKS
Percentage
90 days
De Marie Lodge, Kurseong
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹35,773
Yes
21 Sept 2026
5 Aug 2026
21 Aug 2026
5 Aug 2026
19 Aug 2026
5 Aug 2026
5 Aug 2026 - 19 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.
(a) Depth of excavation not exceeding 1,500 mm. | - | %Cum | 119.27 | - |
| 2 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work)
(a) With earth obtained from excavation of foundation. | - | %Cum | 77.54 | - |
| 3 | Fixing post of iron or precast concrete by digging hole in the ground (in all sorts of soil) and embedding the same by packing the hole with cement concrete (1:3:6) (with jhama khoa. For Purulia, Bankura and Darjeeling Hill by Pakur Variety, Local Black Hard Stone & Bazree respectively) and finishing the top surface to regular shape (as directed) with 15 cm cement plaster (1:6) complete, including the cost of concrete, plaster etc.but excluding the cost of the post :
(ii) Average dia. of the hole 300 mm. to 400 mm.
(a) Depth 450 mm. to 500 mm.
(Cement- 14..35 Kg/No.) | - | Each | 323 | - |
| 4 | Labour fo rlaying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics including rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth. | - | Sqm | 221.94 | - |
| 5 | (II) Cement concrete with 30 mm down graded shingles excludingshuttering.
N.B. Variety
In ground floor
(a) 1:3:6 proportion | - | Cum | 4,608 | - |
| 6 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes.
(b) River bazree | - | Cum | 5,309 | - |
| 7 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.
(a) For works in foundation and upto roof of ground floor/upto 4 m
(i) Tor steel/Mild Steel
I. SAIL/ TATA/RINL | 1 | Mtr | 66,519 | ₹66,452.48 |
| 8 | Plum concrete work with 40 % cement concrete with 30 mm down graded stone metal and 60 % stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any.
(i) (1:3:6) proportion | 1 | Cum | 3,304 | ₹3,300.7 |
| 9 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out aftercompletion of works (upto roof of ground floor)
(f) 25 mm to 30 mm shuttering without staging in foundation | - | Sqm | 209 | - |
| 10 | M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer incharge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1969 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc.
Payment to be made on the basis of calculated weight of structural members only in finished work as per IS specified weight. Payment for gusset, bracket, cleat, rivets, bolts and nuts may be make by adding the actual weight of such items with the weight of finished structural members or 7% of weight for finished structural members weighing not less than 22.5 Kg. / m. or 15 % of weight for finished structal members weighing less than 22.5 Kg. / m. may be increased allow for bracket, cleat, rivet, bolts and nuts etc. and no seperate payment being made for these items, as per direction of Engineer In Charge. The rates are considered for a height of erection 8m. / 2nd floor level from the ground. Add 1.5% extra over the rate for each additional floor or 4m. beyond initiial 8m. or part thereof.
I) For structural members of specified sections weighing less than 22.5 Kg./m | 1 | Mtr | 74,571 | ₹74,496.43 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.37 MB
OID.pdf
Additional Documents • 0.42 MB
GTAFORM.pdf
Tender Documents • 1.14 MB
BOQ_2545829.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .