Loading…
Loading…
Tender Value
₹9.8 L
EMD Value
₹19,520
Closing Date
16 Jul 2026, 11:00 am
Similar tender results from the same govt authority in the past 3 years.
EE PWD Dn. Jaitaran
EE PWD Dn. Jaitaran
Repairs to CD work on Balara Beawar Road at Km 38/0
2026_CEPWD_570280_6
Nit No 06 2026-27
Open Tender
Civil Works
60 days
Jaitaran
As Per Tender Document
2 documents required · 2 mandatory
₹500
EE PWD Dn. Jaitaran
₹19,520
Yes
25 Jun 2026
25 Jun 2026
16 Jul 2026
25 Jun 2026
16 Jul 2026
25 Jun 2026
25 Jun 2026 - 16 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation for structures as per drawing and MoRTH specifications Clause 304.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Ordinary Soil upto 3m Depth. | 1 | Cum | 137 | ₹136.86 |
| 2 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per MoRTH Specification Clause 202. Cement mortar | - | Cum | 155 | - |
| 3 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and MoRTH specifications Clause 1702, 1703, 2102 & 2104. P.C.C grade M 10 Nominal mix 1:3:6. | - | Cum | 2,584 | - |
| 4 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 2905. 300 mm dia | - | Mtr | 612 | - |
| 5 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 2905. 600 mm dia | - | Mtr | 1,727 | - |
| 6 | Stone masonry work in cement mortar in foundation complete as per drawing and MoRTH specifications Clauses 1402, 1405, 2102 & 2104. including weep holes ,Random rubble masonry In 1:3 cement mortar | - | Cum | 2,937 | - |
| 7 | Plastering with cement mortar (1:4), 20 mm thick on Stone work. | - | Sqm | 132 | - |
| 8 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRTH Specification Clause 401. For Grading III Material | - | Cum | 407 | - |
| 9 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per MoRTH Specification Clause 404. using Crusher borken aggregate By Mechanical Means | - | cum | 1,002 | - |
| 10 | Construction of un-reinforced , plain cement concrete pavement M30 (Grade), thickness as per design, over a prepared sub base, with 43/53 grade cement as per Clause 602.2.2 , coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a in fully automatic Batching Plant and transported to site in transit mixer for having continous agitated mixer, manufactured as per approved mix design including pumping of R.M.C. from transit mixer to site of laying , with all lead and lift including cost of admixtures in recommended portion as per IS 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer in charge laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using Fixed Form Paver and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days using water finishing to lines and grade as per drawing and MoRTH Specification Clause 602 including vaccum dewatering process with all required equipments (Dowel Bars will be paid seprately). | - | Cum | 5,160 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
Nit06.pdf
Tender Documents • 0.30 MB
TENDERALLDOCUMENTSADDGST.pdf
Tender Documents • 20.49 MB
BOQ_1015473.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid