Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAccepted-AOC M S YADAV CONSTRUCTION SCF NO 459 1ST FLOOR MOTOR MARKET MANIMAJRA CHANDIGARH | CHANDIGARH | CHANDIGARH | 160001 | ₹1.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹2.0 LRejected-Finance 86 MOULI JAGRAN COMPLEX CHANDIGARH | CHANDIGARH | CHANDIGARH | CHANDIGARH | ₹2.0 L | L2 | Rejected-Finance L2 |
Tender Value
₹2.0 L
EMD Value
₹3,915
Closing Date
30 Jun 2026, 1:15 pmClosed
Executive Engineer SWM MC Chd
Room No. 612 6th floor MC Building Sector 17 Chandigarh.
Processing of matured wet waste at 120 TPD wet waste plant at solid waste processing plant sector 25W Chandigarh- Deployment of Grab Tractor.
2026_MCC_93552_1
MCC/EE/SWM/2026/60
Open Tender
Miscellaneous Works
Percentage
30 days
Chandigarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3,915
1 Jul 2026
25 Jun 2026
30 Jun 2026
25 Jun 2026
30 Jun 2026
25 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Processing of matured wet waste received from 300 TPD Wet Waste Plant with 01 no. Grab Loader including Driver, POL and all allied charges at 120 TPD Wet Waste Processing Plant as per entire satisfaction of EIC (NSI) | - | Per Day | 6,750 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 10.06 MB
BOQ_114589.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].