Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.4 LAdmitted-Finance | -26.11% | ₹3.4 L | L1 | Admitted-Finance |
| 2 | L2₹3.7 LAdmitted-Finance | -19.99% | ₹3.7 L | L2 | Admitted-Finance |
| 3 | L3₹4.1 LAdmitted-Finance | -10.00% | ₹4.1 L | L3 | Admitted-Finance |
Tender Value
₹4.6 L
EMD Value
₹9,160
Closing Date
6 Jul 2026, 6:00 pmClosed
EXECUTIVE OFFICER
LAXMANGARH SIKAR
Construction of cc road sitaram ji chejara se Sudheer chawachhariya k plot tak ward 29
2026_DLB_570219_1
ETENDER/1071-72
Open Tender
Civil Works - Roads
120 days
LAXMANGARH SIKAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
EXECUTIVE OFFICER
₹9,160
Yes
9 Jul 2026
25 Jun 2026
7 Jul 2026
25 Jun 2026
6 Jul 2026
25 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of embankment with approved material obtained from
borrow pit with all lifts and leads, transporting to site, spreading,
grading to required slope and compacting by vibratory roller 8-10
tonne to meet requirement of table 300-2 including cost of
compensation for earth taken from private land complete as per
MoRT&H specification clause 305. (Lead taken upto 5 km) | 225.6 | cum | 178.5 | ₹40,269.6 |
| 2 | Providing and laying lean cement concrete 1:4:8 in Sub- base over aprepared sub-grade with coarse and fine aggregate conforming toIS: 383, the size of coarse aggregate not exceeding 25 mm,aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to beless than 150 kg/ cum, optimum moisture content to be determinedduring trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in concrete mixer, laid manually,compacted with surface vibrator, finishing and curing complete as per clause 601, 112 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion | 47 | cum | 2,955 | ₹1,38,885 |
| 3 | Providing and laying un-reinforced, plain cement concrete mix withConcrete Mixer & vibrator pavement over a prepared sub base with 43 grade cement , coarse and fine aggregate conforming to IS: 383,maximum size of coarse aggregate not exceeding 25 mm, mixed asper approved mix design, laid, spread, compacted and finished in a
continuous operation including provision of contraction, expansion,construction and longitudinal joints etc including all material, labour,machinery, lighting, guarding and maintenance of diversion.M-20 | 47 | cum | 5,650 | ₹2,65,550 |
| 4 | Supplying & fixing 560mm dia opening SFRC manhole frame & cover as per IS : 12592-2002 in existing manholes including grouting the frame in PCC M-15 complete in all respect as directed by the Engineer HD-20 | 5 | no | 2,675 | ₹13,375 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.14 MB
BOQ_1014656.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid