| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAdmitted-Finance | ₹1.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.3 Cr+₹3.5 L (2.77%)Admitted-Finance | ₹1.3 Cr+₹3.5 L (2.77%) | L2 | Admitted-Finance |
| 3 | L3₹1.3 Cr+₹4.0 L (3.20%)Admitted-Finance 25 SELVA NAYAGIPURAM SAYALKUDI ROAD SAYALKUDI RAMANATHAPURAM | RAMANATHAPURAM | TAMIL NADU | 623115 | ₹1.3 Cr+₹4.0 L (3.20%) | L3 | Admitted-Finance |
| 4 | L4₹1.3 Cr+₹4.7 L (3.74%)Admitted-Finance | ₹1.3 Cr+₹4.7 L (3.74%) | L4 | Admitted-Finance |
| 5 | L5₹1.3 Cr+₹7.7 L (6.15%)Admitted-Finance 97 1 YADHAVA STREET VELIPATTINAM RAMANATHAPURAM 523504 | 523504 | ₹1.3 Cr+₹7.7 L (6.15%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | KARUMALAIYAN K L2 | JEEVANANTHAM CONSTRUCTION L6 | N ERSATHKHAN L4 | RGR&CO L3 | VENKATESWARA CONSTRUCITON L5 | N KATHOONBEEVI L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Part I: T.M.Kottai Habitation,Deepening of T.M.Kottai Chinnakovil Oorani Supply channel with Construction of Bathing Ghat. | |||||||||
| 2.00 | Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. (Annexure III - F1) | 360 | Cum | 50 ₹18,000 Lowest | 50 ₹18,000 Lowest | 90 ₹32,400 | 50 ₹18,000 Lowest | 50 ₹18,000 Lowest | 90 ₹32,400 |
| 3.00 | Providing and fixing of boundry stone | 10 | Nos | 220 ₹2,200 Lowest | 220 ₹2,200 Lowest | 220 ₹2,200 Lowest | 220 ₹2,200 Lowest | 220 ₹2,200 Lowest | 220 ₹2,200 Lowest |
| 4.00 | Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay stiff block cotton hard red earth shales murrams, gravel stoney earth , earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20 B SI 61 per specification | 23.33 | Cum | 193.2 ₹4,507.36 | 193.2 ₹4,507.36 | 50 ₹1,166.5 Lowest | 96 ₹2,239.68 | 193.2 ₹4,507.36 | 50 ₹1,166.5 Lowest |
| 5.00 | Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete. | 5.44 | Cum | 5,677.34 ₹30,884.73 | 5,677.34 ₹30,884.73 | 5,677 ₹30,882.88 Lowest | 5,677 ₹30,882.88 Lowest | 5,677.34 ₹30,884.73 | 5,677 ₹30,882.88 Lowest |
| 6.00 | Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc | 8.22 | Cum | 6,006.98 ₹49,377.38 | 6,006.98 ₹49,377.38 | 6,006 ₹49,369.32 Lowest | 6,006 ₹49,369.32 Lowest | 6,006.98 ₹49,377.38 | 6,006 ₹49,369.32 Lowest |
| 7.00 | Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete | 98.8 | Cum | 416 ₹41,100.8 | 416 ₹41,100.8 | 410 ₹40,508 | 416 ₹41,100.8 | 416 ₹41,100.8 | 300 ₹29,640 Lowest |
| 8.00 | Supplying and fabrication,placing in position ofmild steelTor steel grils for RCC worksinculding cost of steel and binding wire etc. | 263.5 | kg | 85.06 ₹22,413.31 | 100 ₹26,350 | 85 ₹22,397.5 | 85 ₹22,397.5 | 84 ₹22,134 | 75 ₹19,762.5 Lowest |
| 9.00 | ReinforcementCement concrete 1:1.5:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc | 2.81 | Cum | 9,072.95 ₹25,494.99 Lowest | 9,072.95 ₹25,494.99 Lowest | 9,072.95 ₹25,494.99 Lowest | 9,073 ₹25,495.13 | 9,072.95 ₹25,494.99 Lowest | 9,072.95 ₹25,494.99 Lowest |
| 10.00 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, aying and curing etc complete for bed blocks for 10 cum | 4.88 | Cum | 7,028.98 ₹34,301.42 Lowest | 7,028.98 ₹34,301.42 Lowest | 7,029 ₹34,301.52 | 7,029 ₹34,301.52 | 7,028.98 ₹34,301.42 Lowest | 7,029 ₹34,301.52 |
Tender Value
Refer Docs
EMD Value
₹1.4 L
Closing Date
8 Aug 2022, 3:00 pmClosed
Additional Collector(Dev),DRDA,Ramanathapuram
District Rural Development Agency,Ramanathapuram
Rejuvenation of Water Bodies in Package No.KDL-1/AGAMT 2021-22 of Kadaladi Block in Ramanathapuram District under AGAMT 2021-22
2022_RDTN_242175_1
R7/5593/2021/dated 05.07.2022 KDL-1
Open Tender
Civil Works - Buildings
Item Rate
180 days
District Rural Development Agency
Refer to Tender Document
6 documents required · 6 mandatory
₹0
₹1.4 L
District Rural Development Agency,Ramanathapuram
9 Sept 2022
19 Jul 2022
8 Aug 2022
19 Jul 2022
8 Aug 2022
20 Jul 2022
20 Jul 2022
Amount
Part I: T.M.Kottai Habitation,Deepening of T.M.Kottai Chinnakovil Oorani Supply channel with Construction of Bathing Ghat.
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. (Annexure III - F1)
Providing and fixing of boundry stone
Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay stiff block cotton hard red earth shales murrams, gravel stoney earth , earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20 B SI 61 per specification
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Supplying and fabrication,placing in position ofmild steelTor steel grils for RCC worksinculding cost of steel and binding wire etc.
ReinforcementCement concrete 1:1.5:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, aying and curing etc complete for bed blocks for 10 cum
Part II: T.M.Kottai Habitation,Deepening of Sakkana Oorani Supply channel with Construction of Bathing Ghat.
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. (Annexure III - F1)
Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay stiff block cotton hard red earth shales murrams, gravel stoney earth , earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20 B SI 61 per specification
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Supplying and fabrication,placing in position ofmild steelTor steel grils for RCC worksinculding cost of steel and binding wire etc.
ReinforcementCement concrete 1:1.5:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, aying and curing etc complete for bed blocks for 10 cum
Part III: T.M.Kottai Habitation Chinna Oorani Construction of Bathing Ghat.
Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay stiff block cotton hard red earth shales murrams, gravel stoney earth , earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20 B SI 61 per specification
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Supplying and fabrication,placing in position ofmild steelTor steel grils for RCC worksinculding cost of steel and binding wire etc.
ReinforcementCement concrete 1:1.5:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, aying and curing etc complete for bed blocks for 10 cum
Part IV: Siraikulam Habitation,Deepening of Vengalamadaiyan Oorani
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. (Annexure III - F1)
Sectioning during forming bunds when earth mooving machineries,loories, and rollers are used for consolidation. (Annexure III - D.50D)
Providing and fixing of boundry stone
Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay stiff block cotton hard red earth shales murrams, gravel stoney earth , earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20 B SI 61 per specification
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Supplying and fabrication,placing in position ofmild steelTor steel grils for RCC worksinculding cost of steel and binding wire etc.
ReinforcementCement concrete 1:1.5:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, aying and curing etc complete for bed blocks for 10 cum
Providing and laying reinforced cement concrete pipe NP3 900mm for culverts on first class bedding of Granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, back filling, concrete and masonry works in head walls and parapets clause 1106
Part V: Siraikulam Habitation,Deepening of Siraikulam Oorani
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. (Annexure III - F1)
Sectioning during forming bunds when earth mooving machineries,loories, and rollers are used for consolidation. (Annexure III - D.50D)
Providing and fixing of boundry stone
Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay stiff block cotton hard red earth shales murrams, gravel stoney earth , earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20 B SI 61 per specification
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Supplying and fabrication,placing in position ofmild steelTor steel grils for RCC worksinculding cost of steel and binding wire etc.
ReinforcementCement concrete 1:1.5:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, aying and curing etc complete for bed blocks for 10 cum
Providing and laying reinforced cement concrete pipe NP3 900mm for culverts on first class bedding of Granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, back filling, concrete and masonry works in head walls and parapets clause 1106
Part VI: Kokkarasankottai Habitation,Deepening of Kanal Oorani and Supply channel with Construction of Bathing Ghat.
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. (Annexure III - F1)
Sectioning during forming bunds when earth mooving machineries,loories, and rollers are used for consolidation. (Annexure III - D.50D)
Providing and fixing of boundry stone
Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay stiff block cotton hard red earth shales murrams, gravel stoney earth , earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20 B SI 61 per specification
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Supplying and fabrication,placing in position ofmild steelTor steel grils for RCC worksinculding cost of steel and binding wire etc.
ReinforcementCement concrete 1:1.5:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, aying and curing etc complete for bed blocks for 10 cum
Providing and laying reinforced cement concrete pipe NP3 900mm for culverts on first class bedding of Granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, back filling, concrete and masonry works in head walls and parapets clause 1106
Part VII: Manicka nagar Habitation,Deepening of Muniyasamy kovil Oorani supply channel with Construction of Bathing Ghat.
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. (Annexure III - F1)
Sectioning during forming bunds when earth mooving machineries,loories, and rollers are used for consolidation. (Annexure III - D.50D)
Providing and fixing of boundry stone
Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay stiff block cotton hard red earth shales murrams, gravel stoney earth , earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20 B SI 61 per specification
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Supplying and fabrication,placing in position ofmild steelTor steel grils for RCC worksinculding cost of steel and binding wire etc.
ReinforcementCement concrete 1:1.5:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, aying and curing etc complete for bed blocks for 10 cum
Providing and laying reinforced cement concrete pipe NP3 900mm for culverts on first class bedding of Granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, back filling, concrete and masonry works in head walls and parapets clause 1106
Part VIII: North Narippaiyur Habitation,Deepening of East Oorani with Construction of Bathing Ghat.
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. (Annexure III - F1)
Sectioning during forming bunds when earth mooving machineries,loories, and rollers are used for consolidation. (Annexure III - D.50D)
Providing and fixing of boundry stone
Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay stiff block cotton hard red earth shales murrams, gravel stoney earth , earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20 B SI 61 per specification
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Supplying and fabrication,placing in position ofmild steelTor steel grils for RCC worksinculding cost of steel and binding wire etc.
ReinforcementCement concrete 1:1.5:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, aying and curing etc complete for bed blocks for 10 cum
Providing and laying reinforced cement concrete pipe NP3 900mm for culverts on first class bedding of Granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, back filling, concrete and masonry works in head walls and parapets clause 1106
Part IX:Pannathai Habitation,Deepening of West Oorani with Construction of Bathing Ghat.
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. (Annexure III - F1)
Sectioning during forming bunds when earth mooving machineries,loories, and rollers are used for consolidation. (Annexure III - D.50D)
Providing and fixing of boundry stone
Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay stiff block cotton hard red earth shales murrams, gravel stoney earth , earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20 B SI 61 per specification
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Supplying and fabrication,placing in position ofmild steelTor steel grils for RCC worksinculding cost of steel and binding wire etc.
ReinforcementCement concrete 1:1.5:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, aying and curing etc complete for bed blocks for 10 cum
Providing and laying reinforced cement concrete pipe NP3 900mm for culverts on first class bedding of Granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, back filling, concrete and masonry works in head walls and parapets clause 1106
Part X: Kannirajapuram Habitation,Deepening of Pitchaiya nadar oorani with Construction of Bhathing Ghat
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. (Annexure III - F1)
Sectioning during forming bunds when earth mooving machineries,loories, and rollers are used for consolidation. (Annexure III - D.50D)
Providing and fixing of boundry stone
Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay stiff block cotton hard red earth shales murrams, gravel stoney earth , earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20 B SI 61 per specification
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Supplying and fabrication,placing in position ofmild steelTor steel grils for RCC worksinculding cost of steel and binding wire etc.
ReinforcementCement concrete 1:1.5:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, aying and curing etc complete for bed blocks for 10 cum
Providing and laying reinforced cement concrete pipe NP3 900mm for culverts on first class bedding of Granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, back filling, concrete and masonry works in head walls and parapets clause 1106
Part XI: Ariyanathapuram Habitation,Deepening of Servan oorani with Construction of Bhathing Ghat
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. (Annexure III - F1)
Sectioning during forming bunds when earth mooving machineries,loories, and rollers are used for consolidation. (Annexure III - D.50D)
Providing and fixing of boundry stone
Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay stiff block cotton hard red earth shales murrams, gravel stoney earth , earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20 B SI 61 per specification
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Supplying and fabrication,placing in position ofmild steelTor steel grils for RCC worksinculding cost of steel and binding wire etc.
ReinforcementCement concrete 1:1.5:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, aying and curing etc complete for bed blocks for 10 cum
Part XII: Samiyadi Kottagai Habitation,and Deepening of Sundarapandiyan Tank with Construction of Sulice.
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. (Annexure III - F1)
Sectioning during forming bunds when earth mooving machineries,loories, and rollers are used for consolidation. (Annexure III - D.50D)
Providing and fixing of boundry stone
Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay stiff block cotton hard red earth shales murrams, gravel stoney earth , earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20 B SI 61 per specification
Sand filling with river sand and well rammed , watered and consolidated complying with standard specification , including cost and conveyance of material and labour charges etc complete
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying Laying Jointing and Fixing in position of RCC Hum pipe of pipe NP3 900mmDia with suitable collars including labour charges works, back filling, concrete and masonry works in head walls and parapets clause
Providing cut stone roughly drssed and set in cement ortor 1:3 (one cement and three sand ) including in position etc complete as directed by the Engineer in charges of work complying
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, aying and curing etc complete for bed blocks for 10 cum
Refilling with ecxcaveted earth (Other sand ) With all leads and lift for filling the open cut where ever necessary in layers icluding breaking clods.
Watering and Consloidation by Power roller including hire cherges (D 71 B)
Part XIII: E.Nedunkulam Habitation,Deepening of E.Nedunkulam Oorani with Retaining wall 50m Inlet.
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. (Annexure III - F1)
Sectioning during forming bunds when earth mooving machineries,loories, and rollers are used for consolidation. (Annexure III - D.50D)
Providing and fixing of boundry stone
Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay stiff block cotton hard red earth shales murrams, gravel stoney earth , earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20 B SI 61 per specification
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Supplying and fabrication,placing in position ofmild steelTor steel grils for RCC worksinculding cost of steel and binding wire etc.
ReinforcementCement concrete 1:1.5:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, aying and curing etc complete for bed blocks for 10 cum
Providing and laying reinforced cement concrete pipe NP3 900mm for culverts on first class bedding of Granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, back filling, concrete and masonry works in head walls and parapets clause 1106
Part XIV: Melaselvanoor Habitation,Deepening of Puthu Oorani with Construction Bathing Ghat.
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. (Annexure III - F1)
Sectioning during forming bunds when earth mooving machineries,loories, and rollers are used for consolidation. (Annexure III - D.50D)
Providing and fixing of boundry stone
Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay stiff block cotton hard red earth shales murrams, gravel stoney earth , earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20 B SI 61 per specification
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Supplying and fabrication,placing in position ofmild steelTor steel grils for RCC worksinculding cost of steel and binding wire etc.
ReinforcementCement concrete 1:1.5:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, aying and curing etc complete for bed blocks for 10 cum
Providing and laying reinforced cement concrete pipe NP3 900mm for culverts on first class bedding of Granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, back filling, concrete and masonry works in head walls and parapets clause 1106
Part XV: Pappakulam Habitation,Deepening of Pappakulam Oorani with Construction Bathing Ghat.
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. (Annexure III - F1)
Sectioning during forming bunds when earth mooving machineries,loories, and rollers are used for consolidation. (Annexure III - D.50D)
Providing and fixing of boundry stone
Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay stiff block cotton hard red earth shales murrams, gravel stoney earth , earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20 B SI 61 per specification
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Supplying and fabrication,placing in position ofmild steelTor steel grils for RCC worksinculding cost of steel and binding wire etc.
ReinforcementCement concrete 1:1.5:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, aying and curing etc complete for bed blocks for 10 cum
Providing and laying reinforced cement concrete pipe NP3 900mm for culverts on first class bedding of Granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, back filling, concrete and masonry works in head walls and parapets clause 1106
Part XVI: M.Krishnapuram Habitation,Deepening of Muniyasamy Oorani.
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. (Annexure III - F1)
Sectioning during forming bunds when earth mooving machineries,loories, and rollers are used for consolidation. (Annexure III - D.50D)
Providing and fixing of boundry stone
Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay stiff block cotton hard red earth shales murrams, gravel stoney earth , earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20 B SI 61 per specification
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Supplying and fabrication,placing in position ofmild steelTor steel grils for RCC worksinculding cost of steel and binding wire etc.
ReinforcementCement concrete 1:1.5:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, aying and curing etc complete for bed blocks for 10 cum
Providing and laying reinforced cement concrete pipe NP3 900mm for culverts on first class bedding of Granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, back filling, concrete and masonry works in head walls and parapets clause 1106
Part XVII: Madathakulam Habitation,Deepening of Muniyasamy Oorani.
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. (Annexure III - F1)
Sectioning during forming bunds when earth mooving machineries,loories, and rollers are used for consolidation. (Annexure III - D.50D)
Providing and fixing of boundry stone
Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay stiff block cotton hard red earth shales murrams, gravel stoney earth , earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20 B SI 61 per specification
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Supplying and fabrication,placing in position ofmild steelTor steel grils for RCC worksinculding cost of steel and binding wire etc.
ReinforcementCement concrete 1:1.5:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, aying and curing etc complete for bed blocks for 10 cum
Providing and laying reinforced cement concrete pipe NP3 900mm for culverts on first class bedding of Granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, back filling, concrete and masonry works in head walls and parapets clause 1106
Part XVIII: M.Krishnapuram Habitation,Deepening of Chinnakanmai Oorani.
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. (Annexure III - F1)
Sectioning during forming bunds when earth mooving machineries,loories, and rollers are used for consolidation. (Annexure III - D.50D)
Providing and fixing of boundry stone
Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay stiff block cotton hard red earth shales murrams, gravel stoney earth , earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20 B SI 61 per specification
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Supplying and fabrication,placing in position ofmild steelTor steel grils for RCC worksinculding cost of steel and binding wire etc.
ReinforcementCement concrete 1:1.5:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, aying and curing etc complete for bed blocks for 10 cum
Providing and laying reinforced cement concrete pipe NP3 900mm for culverts on first class bedding of Granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, back filling, concrete and masonry works in head walls and parapets clause 1106
Part XIX:Erwadi Habitation,Deepening of Sangudi Oorani with Construction of Bhathing and Inlet.
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. (Annexure III - F1)
Sectioning during forming bunds when earth mooving machineries,loories, and rollers are used for consolidation. (Annexure III - D.50D)
Providing and fixing of boundry stone
Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay stiff block cotton hard red earth shales murrams, gravel stoney earth , earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20 B SI 61 per specification
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Supplying and fabrication,placing in position ofmild steelTor steel grils for RCC worksinculding cost of steel and binding wire etc.
ReinforcementCement concrete 1:1.5:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, aying and curing etc complete for bed blocks for 10 cum
Providing and laying reinforced cement concrete pipe NP3 900mm for culverts on first class bedding of Granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, back filling, concrete and masonry works in head walls and parapets clause 1106
Part XX: Erwadi Habitation,Deepening of Pallivasal Oorani with Construction of Bathing Ghat.
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. (Annexure III - F1)
Sectioning during forming bunds when earth mooving machineries,loories, and rollers are used for consolidation. (Annexure III - D.50D)
Providing and fixing of boundry stone
Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay stiff block cotton hard red earth shales murrams, gravel stoney earth , earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20 B SI 61 per specification
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Supplying and fabrication,placing in position ofmild steelTor steel grils for RCC worksinculding cost of steel and binding wire etc.
ReinforcementCement concrete 1:1.5:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, aying and curing etc complete for bed blocks for 10 cum
Providing and laying reinforced cement concrete pipe NP3 900mm for culverts on first class bedding of Granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, back filling, concrete and masonry works in head walls and parapets clause 1106
Part XXI:Erwadi Habitation,Deepening of Panaiyadi Oorani with Construction of Inlet.
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. (Annexure III - F1)
Sectioning during forming bunds when earth mooving machineries,loories, and rollers are used for consolidation. (Annexure III - D.50D)
Providing and fixing of boundry stone
Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay stiff block cotton hard red earth shales murrams, gravel stoney earth , earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20 B SI 61 per specification
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Supplying and fabrication,placing in position ofmild steelTor steel grils for RCC worksinculding cost of steel and binding wire etc.
ReinforcementCement concrete 1:1.5:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, aying and curing etc complete for bed blocks for 10 cum
Providing and laying reinforced cement concrete pipe NP3 900mm for culverts on first class bedding of Granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, back filling, concrete and masonry works in head walls and parapets clause 1106
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
KARUMALAIYAN K
RGR&CO
N ERSATHKHAN
VENKATESWARA CONSTRUCITON
JEEVANANTHAM CONSTRUCTION
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .