Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.2 LAccepted-AOC | ₹14.2 L | L1 | Accepted-AOC Accept |
| 2 | L2₹14.8 LRejected-AOC 2 84 VEPPAMARATHUPATTI MORASAPATTI POST IDAPPADI TK SALEM DISTRICT 637101 | SALEM | TAMIL NADU | 637101 | ₹14.8 L | L2 | Rejected-AOC Reject |
| Sl No | Description | Qty | Unit | M/S. R Ilamurugu L1 | SREE RAGU CONTTRACTS L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation and Depositing on bank initial lead of 10 Meters and initial lift of 2 Metres in narrow trenches for laying of pipes for watersupply and sewarage works in Hard stiff clay,stiff black cotton,hard red earth,shales,murram gravel,stoney earth,earth mixed with small size boulders and hard gravelly soil to the full depth as may be directed by departmental officers etc. complete complying with standard specification.For Pipe Laying works(As per TWAD SOR 2024-25 P-192.) | 2,023 | Rm | 2,54,898 ₹2.5 L | 2,91,312 ₹2.9 L |
| 2.00 | Labour for Cutting open road for laying water mains or sewer including all Labour Charges and claring the site as directed by the Departmental Officers etc. complete complying with standard specification(As per TWAD SOR 2024-25 P-195.) | 61 | M3 | 55,083 ₹55,083 | 62,708 ₹62,708 |
| 3.00 | Supply and delivery of 90mm Dia HDPE PE100 PN6 Pipes of confirming to IS 4984/2016 including cost and conveyance to site and all labour charges etc complete as per standard specification(As per TWAD SOR 2024-25 P-14.) | 2,023 | Rm | 6,09,327.6 ₹6.1 L | 5,60,371 ₹5.6 L |
| 4.00 | Lowering HDPE PE100 PN6 pipes and specials to trench and laying to in proper gradient and alignment in the pipe line trench including all labour charges etc complete as per standard specification (As per TWAD SOR 2024-25 P-171.) | 2,023 | Rm | 38,437 ₹38,437 | 42,483 ₹42,483 |
| 5.00 | Jointing HDPE Pipes and Specials by butt fusion welding / electro fusion welding joints using fusion equipment as per ISO 21307-2011 and as per IS 7634 (part-2) : 2012 including cost of hire charges for butt fusion equipment power supply arrangements etc., complete as per standard specification (As per TWAD SOR 2024-25 P-184.) | 169 | No | 29,913 ₹29,913 | 34,138 ₹34,138 |
| 6.00 | Cutting the HDPE pipes true to axis and finishing the ends complete including all labour charges etc complete as per standard specification (As per TWAD SOR 2024-25 P-175.) | 101 | No | 1,212 ₹1,212 | 1,313 ₹1,313 |
| 7.00 | Supply and delivery of HDPE specials of conforming to IS specifications at site of work including Cost of materials, loading, transportation, unloading and insurance etc.,Complete as per standard specification (As per TWAD SOR 2024-25 P-17.)- 90 mm Dia HDPE Bend | 10 | No | 2,360 ₹2,360 | 2,690 ₹2,690 |
| 8.00 | 90 mm Dia HDPE Tee | 18 | No | 5,868 ₹5,868 | 6,696 ₹6,696 |
| 9.00 | 90 mm Dia HDPE End Cap | 25 | No | 750 ₹750 | 850 ₹850 |
| 10.00 | Refilling the excavated earth into pipe line trench after laying and Testing of Pipes in all aspects, Cost including all labour charges etc complete as per standard specification (As per TWAD SOR 2024-25 P-308.) | 2,023 | Rm | 52,598 ₹52,598 | 60,690 ₹60,690 |
Tender Value
Refer Docs
EMD Value
₹16,000
Closing Date
30 Jul 2025, 3:00 pmClosed
Executive Officer
Sithayankottai Town Panchayat
Providing Distribution Main 90mm Dia HDPE PE100PN6 Pipe at 3rd Ward Alagarnaickenpatti Main Road and 6 8 11 16th Ward in SithayankottaiTown Panchayat
2025_DTP_586896_1
335/2025
Open Tender
Civil Works - Water Works
90 days
Sithayankottai Town Panchayat
Class 1
2 documents required · 2 mandatory
₹10,310
₹16,000
30 Jan 2026
29 Jul 2025
30 Jul 2025
29 Jul 2025
30 Jul 2025
29 Jul 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid