| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹46.2 CrAccepted-AOC 11C BHARATHI COLONY MADUKKARAI MARKET COIMBATORE TAMIL NADU 641105 UDYAM TN 03 0003766 | COIMBATORE | TAMIL NADU | 641105 | ₹46.2 Cr Quoted ₹48.6 Cr | L1 | Accepted-AOC Lowest rate quoted bidder is accepted |
| 2 | L2₹59.1 CrRejected-AOC 155 A KAIKATTIPUDUR TIRUPPUR ROAD AVINASHI 641654 | AVINASHI | TIRUPPUR | TAMIL NADU | 641654 | ₹59.1 Cr | L2 | Rejected-AOC Due to highest rate quoted bidder is rejected |
| Sl No | Description | Qty | Unit | VR WATER INFRA COMPANY L2 | raja&co L1 |
|---|---|---|---|---|---|
| 1.00Name of the Components | |||||
| 1.01 | Out Souring of Operation and Maintenance of Hogenakkal Water supply and Fluorosis Mitigation Project for Dharmapuri and Krishnagiri Districts for the period of 12 months (From 01.04.2026 to 31.03.2027) - Package IV - FIRST YEAR | 1 | No | 8,67,83,279.72 ₹8.7 Cr | 7,08,45,449.83 ₹7.1 Cr |
| 1.02 | Out Souring of Operation and Maintenance of Hogenakkal Water supply and Fluorosis Mitigation Project for Dharmapuri and Krishnagiri Districts for the period of 12 months (From 01.04.2027 to 31.03.2028) - Package IV - SECOND YEAR | 1 | No | 8,89,20,497.6 ₹8.9 Cr | 7,31,62,901.68 ₹7.3 Cr |
| 1.03 | Out Souring of Operation and Maintenance of Hogenakkal Water supply and Fluorosis Mitigation Project for Dharmapuri and Krishnagiri Districts for the period of 12 months (From 01.04.2028 to 31.03.2029) - Package IV - THIRD YEAR | 1 | No | 9,11,55,572.16 ₹9.1 Cr | 7,49,30,710.84 ₹7.5 Cr |
| 1.04 | Out Souring of Operation and Maintenance of Hogenakkal Water supply and Fluorosis Mitigation Project for Dharmapuri and Krishnagiri Districts for the period of 12 months (From 01.04.2026 to 31.03.2027) - Package V - FIRST YEAR | 1 | No | 7,59,04,923.76 ₹7.6 Cr | 6,27,58,196.42 ₹6.3 Cr |
| 1.05 | Out Souring of Operation and Maintenance of Hogenakkal Water supply and Fluorosis Mitigation Project for Dharmapuri and Krishnagiri Districts for the period of 12 months (From 01.04.2027 to 31.03.2028) - Package V - SECOND YEAR | 1 | No | 7,78,92,359.51 ₹7.8 Cr | 6,42,88,809.28 ₹6.4 Cr |
| 1.06 | Out Souring of Operation and Maintenance of Hogenakkal Water supply and Fluorosis Mitigation Project for Dharmapuri and Krishnagiri Districts for the period of 12 months (From 01.04.2028 to 31.03.2029) - Package V - THIRD YEAR | 1 | No | 7,99,75,894.07 ₹8.0 Cr | 6,59,71,327.24 ₹6.6 Cr |
| 1.07Sub Total | |||||
| 1.08 | Add GST at 18% | 1 | No | 9,01,13,854.83 ₹9.0 Cr | 7,41,52,331.15 ₹7.4 Cr |
Updated dates
Tender Value
₹47.3 Cr
EMD Value
₹36 L
Closing Date
19 Jan 2026, 3:00 pmClosed
Chief Engineer, Vellore
No.8 First East Main Road Gandhi Nagar Vellore -06
O and M of HWS and FMP Pkg-IV to V In Dharmapuri and Krishnagiri District
2025_TWAD_637403_1
IFB No.23 OandM HWS pag-IV and V
Open Tender
Civil Works
1095 days
Dharmapuri
Refer Bid Document
4 documents required · 4 mandatory
₹0
₹36 L
Vellore
11 Mar 2026
30 Dec 2025
20 Jan 2026
30 Dec 2025
19 Jan 2026
3 Jan 2026
8 Jan 2026
Name of the Components
Out Souring of Operation and Maintenance of Hogenakkal Water supply and Fluorosis Mitigation Project for Dharmapuri and Krishnagiri Districts for the period of 12 months (From 01.04.2026 to 31.03.2027) - Package IV - FIRST YEAR
Out Souring of Operation and Maintenance of Hogenakkal Water supply and Fluorosis Mitigation Project for Dharmapuri and Krishnagiri Districts for the period of 12 months (From 01.04.2027 to 31.03.2028) - Package IV - SECOND YEAR
Out Souring of Operation and Maintenance of Hogenakkal Water supply and Fluorosis Mitigation Project for Dharmapuri and Krishnagiri Districts for the period of 12 months (From 01.04.2028 to 31.03.2029) - Package IV - THIRD YEAR
Out Souring of Operation and Maintenance of Hogenakkal Water supply and Fluorosis Mitigation Project for Dharmapuri and Krishnagiri Districts for the period of 12 months (From 01.04.2026 to 31.03.2027) - Package V - FIRST YEAR
Out Souring of Operation and Maintenance of Hogenakkal Water supply and Fluorosis Mitigation Project for Dharmapuri and Krishnagiri Districts for the period of 12 months (From 01.04.2027 to 31.03.2028) - Package V - SECOND YEAR
Out Souring of Operation and Maintenance of Hogenakkal Water supply and Fluorosis Mitigation Project for Dharmapuri and Krishnagiri Districts for the period of 12 months (From 01.04.2028 to 31.03.2029) - Package V - THIRD YEAR
Sub Total
Add GST at 18%
Item Rate BoQ
BoQ_Ver4.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE-A1 (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only)
NUMBER #
Outsourcing of Operation and Maintenance of HWS & FMP-Package IV
Outsourcing of Operation and Maintenance of HWS & FMP- Package-IV Supplying designed quantity of water to Package-IV beneficiaries from Master Balancing Reservoir (MBR) at Moongilpatty ( Beneficiaries list in Volume 2/5) including the following I) Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines, water meters, Valves, Pumpsets, Mechanical ,Electrical and ICA Equipments, Panel Boards, Air Conditioner and appurtenances, water retaining structures including protection of all scheme components etc. II) Preventive maintenance. III) Disinfection and delivery of water as per quality standards
IV) Periodical cleaning of water retaining structures once in two months or whenever necessary v) Service Charges etc. Excluding the following i) Cost attending pipeline leaks and bursts. ii) Cost of repair and replacement works to Electro Mechanical, ICA installations. iii) Consumables for disinfection of water and iv) Electricity charges.
For the Period from 01.04.2026 to 31.03.2027 - 12 Months. ( 365 Days X 42.80 ML/Day = 15622 MLD)
Supply and delivery of Liquid Chlorine
Supply and delivery of required Liquid Chlorine (in 100 kg cylinder) as per IS specification and as amended from time to time. The contractor shall supply to the contractor's storage yard / site. The cost includes labour charges for loading, transit insurance, conveyance charges, unloading, processing and handling etc., complete and as directed by TWAD Board officers.
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
Repair and Renewal of Pumpsets
Labour charges for rewinding the following pumpsets with first class insulation wire (with minimum one year Guarantee) including removal of burnt coil, servicing the motor, replacing of bush, bearings, shaft etc., replacing of worn out parts, reconditioning of rotor etc., including removal and re erection of pumpsets, testing, commissioning, conveyance charges etc., complete and as directed by TWAD Board officers.
Open well submersible pump sets
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
Upto 3.00 HP
5.00 HP And Upto 7.50 HP
10.00 HP And Upto 12.50 HP
15.00 HP And Upto 20.00 HP
25.00 HP And Upto 35.00 HP
Labour Charges for stripping out the old windings, rewinding the stator of the above motor using of copper conductor to suit class 'F' style of insulation and using flexible fibre glass cable, inserting the windings, Completely full taping the entire overhang portion of winding on either side, preheating, varnishing with Dr. Beck's Isonel 31J mixed with thinner 31J, baking in oven, applying finishing varnish to the overhang portions. etc…complete (With pre and post work photo documents)
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
HT Motors
3.75 Tonne, CUT 400, 400 KW
3.3 Tonne, CUT 400, 300 KW
2 Tonne ,CUT 355 Type Mounting 150 KW
LT Motors
CUT F 315 Type Mounting 132 KW
CUT F 280 Type Mounting 90 KW
CUT F 260 Type Mounting 55 KW
Leak and Burst rectification works in HDPE and DI pipes
Attending leaks and bursts in HDPE pipes of various sizes including earth work excavation in all type of strata, cost of de-watering from the trenches, removal of leak/burst pipe, lowering the new pipe of respective class, jointing with SS Clamps / butt fusion welding wherever necessary and refilling the trench after attending the leaks/bursts etc., complete excluding cost of pipes within the time frame as specified in the Special conditions of Contract and as directed by TWAD Board officers.
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
63 mm HDPE Pipe
75 mm HDPE Pipe
90 mm HDPE Pipe
110 mm HDPE Pipe
125 mm HDPE Pipe
140 mm HDPE Pipe
160 mm HDPE Pipe
200 mm HDPE Pipe
225 mm HDPE Pipe
250 mm HDPE Pipe
280 mm HDPE Pipe
Attending leaks and bursts in DI pipes of various sizes including earth work excavation in all type of strata, cost of de-watering from the trenches, removal of leak/burst pipe, lowering the new pipe of respective class, jointing with rubber gaskets/Mechanical Joints/SS Clamp wherever necessary and refilling the trench after attending the leaks/bursts etc., complete excluding cost of pipes and specials within the time frame as specified in the Special conditions of Contract and as directed by TWAD Board officers.
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
100 mm DI pipe
150 mm DI pipe
200 mm DI Pipe
250 mm DI Pipe
300 mm DI Pipe
350 mm DI Pipe
400 mm DI Pipe
450 mm DI Pipe
500 mm DI Pipe
Attending leaks and bursts in MS pipes of various sizes including earth work excavation in all type of strata, cost of de-watering from the trenches, removal of leak/burst pipe, lowering the new pipe of respective class, jointing with rubber gaskets/Mechanical Joints/SS Clamp wherever necessary and refilling the trench after attending the leaks/bursts etc., complete excluding cost of pipes and specials within the time frame as specified in the Special conditions of Contract and as directed by TWAD Board officers.
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
850 mm MS pipe
750 mm MS pipe
700 mm MS pipe
600 mm MS pipe
Supply and Delivery of DI pipes and HDPE pipes
Supply and delivery of the following MS pipes as per Table -5 of IS 3589/2001 fabricated with Fe 410 grade steel and other allied codes, Spiral / Longitudinal welding including Pipes shall be internally lined with plant applied cement mortar lining 1:2, The Lining thickness as per Table -8 of IS 3589:2001and Pipes shall be externally coated double coating & double wrapping minimum 4mm thick per metre with plant applied coal Tar as per clause 6.1 of IS 10221:2008 (QAP to be approved by the Engineer suitable for the existing quality of pipe). The cost including labour charges for loading, transit insurance, conveyance charges, unloading, charges etc., complete as directed by TWAD Board officers.
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
850 x 8mm tk MS Pipe
850 x 7mm tk MS Pipe
750 x 8mm tk MS Pipe
750 x 7mm tk MS Pipe
700 x 7mm tk MS Pipe
700 x 6mm tk MS Pipe
600 x 6mm tk MS Pipe
Supply and delivery of the following Ductile iron S/S pipes conforming to IS 8329/2000 and as amended from time to time with ISI marking (QAP to be approved by the engineer suitable for the existing quality of pipe)suitable for water supply main.The contractor shall supply the pipes to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading, etc., complete and as directed by TWAD Board officers for attending leaks and bursts in the pipeline
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
500mm DI K7 pipe
450mm DI K7 pipe
400mm DI K7 pipe
350mm DI K7 pipe
300mm DI K7 pipe
250mm DI K7 pipe
200mm DI K7 pipe
150mm DI K7 pipe
100mm DI K7 pipe
400mm DI K9 pipe
350mm DI K7 pipe
300mm DI K9 pipe
250mm DI K9 pipe
200mm DI K9 pipe
150mm DI K9 pipe
100mm DI K9 pipe
Supply and delivery of the following sizes and class of HDPE pipes - PE 100 conforming to IS 4984/2016 and as amended from time to time(QAP to be approved by the engineer suitable for the existing quality of pipe) in standard lengths The contractor shall supply the pipes to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading, etc., complete and as directed by TWAD Board officers for attending leaks and bursts in the pipeline.
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
315 mm HDPE PN 6 pipe
280 mm HDPE PN 6 pipe
250 mm HDPE PN 6 pipe
200 mm HDPE PN 6 pipe
160 mm HDPE PN 6 pipe
140 mm HDPE PN 6 pipe
110 mm HDPE PN 6 pipe
90mm HDPE PN 6 pipe
75 mm HDPE PN 6 pipe
63 mm HDPE PN 6 pipe
225mm HDPE PN 8 pipe
160mm HDPE PN 8 pipe
140mm HDPE PN 8 pipe
110mm HDPE PN 8 pipe
90mm HDPE PN 8 pipe
75mm HDPE PN 8 pipe
63 mm HDPE PN 8 pipe
200 mm HDPE PN 10 pipe
160mm HDPE PN 10 pipe
110mm HDPE PN 10 pipe
90mm HDPE PN 10 pipe
75 mm HDPE PN 10 pipe
63 mm HDPE PN 10 pipe
63 mm HDPE PN 12.5 pipe
75 mm HDPE PN 12.5 pipe
Supply and delivery of MJ collar with necessary rubber insertions, bolts & nuts including loading & unloading, transporting charges etc., complete at site as per standard specification and as directed by TWAD Board officers.
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
Supply, delivery and fixing of Mechanical Spares
Supply and delivery of Mechanical Spares for all mechanical equipments/installations etc., complete in Operation and Maintenance period of the works. The contractor shall supply the spares to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading and fixing charges etc., complete and as directed by TWAD Board officers
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
Supply delivery and fixing of Electrical Spares
Supply and delivery of Electrical Spares for all electrical equipments/installations etc., complete in Operation and Maintenance period of the works. The contractor shall supply the spares to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading and fixing charges etc., complete and as directed by TWAD Board officers
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
Supply delivery and fixing of ICA Spares
Supply and delivery of ICA Spares for all ICAequipments/installations etc complete in Operation and Maintenance period of the works. The contractor shall supply the spares to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading and fixing charges etc., complete and as directed by TWAD Board officers
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
Supply, delivery and fixing of Miscellaneous Spares for all Building and pumping stations/rechlorination buiding/SCADA room
Supply and delivery of Miscellaneous Spares for all Building and pumping stations / rechlorination buiding / SCADA room etc complete in Operation and Maintenance period of the works. The contractor shall supply the spares to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading and fixing charges etc, complete and as directed by TWAD Board officers
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
Item Rate BoQ
BoQ_Ver4.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE-A2 (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only)
NUMBER #
Outsourcing of Operation and Maintenance of HWS & FMP-Package IV
Outsourcing of Operation and Maintenance of HWS & FMP- Package-IV Supplying designed quantity of water to Package-IV beneficiaries from Master Balancing Reservoir (MBR) at Moongilpatty ( Beneficiaries list in Volume 2/5) including the following I) Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines, water meters, Valves, Pumpsets, Mechanical ,Electrical and ICA Equipments, Panel Boards, Air Conditioner and appurtenances, water retaining structures including protection of all scheme components etc. II) Preventive maintenance. III) Disinfection and delivery of water as per quality standards
IV) Periodical cleaning of water retaining structures once in two months or whenever necessary v) Service Charges etc. Excluding the following i) Cost attending pipeline leaks and bursts. ii) Cost of repair and replacement works to Electro Mechanical, ICA installations. iii) Consumables for disinfection of water and iv) Electricity charges.
For the Period from 01.04.2026 to 31.03.2027 - 12 Months. ( 365 Days X 42.80 ML/Day = 15622 MLD)
Supply and delivery of Liquid Chlorine
Supply and delivery of required Liquid Chlorine (in 100 kg cylinder) as per IS specification and as amended from time to time. The contractor shall supply to the contractor's storage yard / site. The cost includes labour charges for loading, transit insurance, conveyance charges, unloading, processing and handling etc., complete and as directed by TWAD Board officers.
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
Repair and Renewal of Pumpsets
Labour charges for rewinding the following pumpsets with first class insulation wire (with minimum one year Guarantee) including removal of burnt coil, servicing the motor, replacing of bush, bearings, shaft etc., replacing of worn out parts, reconditioning of rotor etc., including removal and re erection of pumpsets, testing, commissioning, conveyance charges etc., complete and as directed by TWAD Board officers.
Open well submersible pump sets
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
Upto 3.00 HP
5.00 HP And Upto 7.50 HP
10.00 HP And Upto 12.50 HP
15.00 HP And Upto 20.00 HP
25.00 HP And Upto 35.00 HP
Labour Charges for stripping out the old windings, rewinding the stator of the above motor using of copper conductor to suit class 'F' style of insulation and using flexible fibre glass cable, inserting the windings, Completely full taping the entire overhang portion of winding on either side, preheating, varnishing with Dr. Beck's Isonel 31J mixed with thinner 31J, baking in oven, applying finishing varnish to the overhang portions. etc…complete (With pre and post work photo documents)
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
HT Motors
3.75 Tonne, CUT 400, 400 KW
3.3 Tonne, CUT 400, 300 KW
2 Tonne ,CUT 355 Type Mounting 150 KW
LT Motors
CUT F 315 Type Mounting 132 KW
CUT F 280 Type Mounting 90 KW
CUT F 260 Type Mounting 55 KW
Leak and Burst rectification works in HDPE and DI pipes
Attending leaks and bursts in HDPE pipes of various sizes including earth work excavation in all type of strata, cost of de-watering from the trenches, removal of leak/burst pipe, lowering the new pipe of respective class, jointing with SS Clamps / butt fusion welding wherever necessary and refilling the trench after attending the leaks/bursts etc., complete excluding cost of pipes within the time frame as specified in the Special conditions of Contract and as directed by TWAD Board officers.
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
63 mm HDPE Pipe
75 mm HDPE Pipe
90 mm HDPE Pipe
110 mm HDPE Pipe
125 mm HDPE Pipe
140 mm HDPE Pipe
160 mm HDPE Pipe
200 mm HDPE Pipe
225 mm HDPE Pipe
250 mm HDPE Pipe
280 mm HDPE Pipe
Attending leaks and bursts in DI pipes of various sizes including earth work excavation in all type of strata, cost of de-watering from the trenches, removal of leak/burst pipe, lowering the new pipe of respective class, jointing with rubber gaskets/Mechanical Joints/SS Clamp wherever necessary and refilling the trench after attending the leaks/bursts etc., complete excluding cost of pipes and specials within the time frame as specified in the Special conditions of Contract and as directed by TWAD Board officers.
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
100 mm DI pipe
150 mm DI pipe
200 mm DI Pipe
250 mm DI Pipe
300 mm DI Pipe
350 mm DI Pipe
400 mm DI Pipe
450 mm DI Pipe
500 mm DI Pipe
Attending leaks and bursts in MS pipes of various sizes including earth work excavation in all type of strata, cost of de-watering from the trenches, removal of leak/burst pipe, lowering the new pipe of respective class, jointing with rubber gaskets/Mechanical Joints/SS Clamp wherever necessary and refilling the trench after attending the leaks/bursts etc., complete excluding cost of pipes and specials within the time frame as specified in the Special conditions of Contract and as directed by TWAD Board officers.
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
850 mm MS pipe
750 mm MS pipe
700 mm MS pipe
600 mm MS pipe
Supply and Delivery of DI pipes and HDPE pipes
Supply and delivery of the following MS pipes as per Table -5 of IS 3589/2001 fabricated with Fe 410 grade steel and other allied codes, Spiral / Longitudinal welding including Pipes shall be internally lined with plant applied cement mortar lining 1:2, The Lining thickness as per Table -8 of IS 3589:2001and Pipes shall be externally coated double coating & double wrapping minimum 4mm thick per metre with plant applied coal Tar as per clause 6.1 of IS 10221:2008 (QAP to be approved by the Engineer suitable for the existing quality of pipe). The cost including labour charges for loading, transit insurance, conveyance charges, unloading, charges etc., complete as directed by TWAD Board officers.
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
850 x 8mm tk MS Pipe
850 x 7mm tk MS Pipe
750 x 8mm tk MS Pipe
750 x 7mm tk MS Pipe
700 x 7mm tk MS Pipe
700 x 6mm tk MS Pipe
600 x 6mm tk MS Pipe
Supply and delivery of the following Ductile iron S/S pipes conforming to IS 8329/2000 and as amended from time to time with ISI marking (QAP to be approved by the engineer suitable for the existing quality of pipe)suitable for water supply main.The contractor shall supply the pipes to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading, etc., complete and as directed by TWAD Board officers for attending leaks and bursts in the pipeline
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
500mm DI K7 pipe
450mm DI K7 pipe
400mm DI K7 pipe
350mm DI K7 pipe
300mm DI K7 pipe
250mm DI K7 pipe
200mm DI K7 pipe
150mm DI K7 pipe
100mm DI K7 pipe
400mm DI K9 pipe
350mm DI K7 pipe
300mm DI K9 pipe
250mm DI K9 pipe
200mm DI K9 pipe
150mm DI K9 pipe
100mm DI K9 pipe
Supply and delivery of the following sizes and class of HDPE pipes - PE 100 conforming to IS 4984/2016 and as amended from time to time(QAP to be approved by the engineer suitable for the existing quality of pipe) in standard lengths The contractor shall supply the pipes to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading, etc., complete and as directed by TWAD Board officers for attending leaks and bursts in the pipeline.
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
315 mm HDPE PN 6 pipe
280 mm HDPE PN 6 pipe
250 mm HDPE PN 6 pipe
200 mm HDPE PN 6 pipe
160 mm HDPE PN 6 pipe
140 mm HDPE PN 6 pipe
110 mm HDPE PN 6 pipe
90mm HDPE PN 6 pipe
75 mm HDPE PN 6 pipe
63 mm HDPE PN 6 pipe
225mm HDPE PN 8 pipe
160mm HDPE PN 8 pipe
140mm HDPE PN 8 pipe
110mm HDPE PN 8 pipe
90mm HDPE PN 8 pipe
75mm HDPE PN 8 pipe
63 mm HDPE PN 8 pipe
200 mm HDPE PN 10 pipe
160mm HDPE PN 10 pipe
110mm HDPE PN 10 pipe
90mm HDPE PN 10 pipe
75 mm HDPE PN 10 pipe
63 mm HDPE PN 10 pipe
63 mm HDPE PN 12.5 pipe
75 mm HDPE PN 12.5 pipe
Supply and delivery of MJ collar with necessary rubber insertions, bolts & nuts including loading & unloading, transporting charges etc., complete at site as per standard specification and as directed by TWAD Board officers.
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
Supply, delivery and fixing of Mechanical Spares
Supply and delivery of Mechanical Spares for all mechanical equipments/installations etc., complete in Operation and Maintenance period of the works. The contractor shall supply the spares to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading and fixing charges etc., complete and as directed by TWAD Board officers
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
Supply delivery and fixing of Electrical Spares
Supply and delivery of Electrical Spares for all electrical equipments/installations etc., complete in Operation and Maintenance period of the works. The contractor shall supply the spares to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading and fixing charges etc., complete and as directed by TWAD Board officers
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
Supply delivery and fixing of ICA Spares
Supply and delivery of ICA Spares for all ICAequipments/installations etc complete in Operation and Maintenance period of the works. The contractor shall supply the spares to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading and fixing charges etc., complete and as directed by TWAD Board officers
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
Supply, delivery and fixing of Miscellaneous Spares for all Building and pumping stations/rechlorination buiding/SCADA room
Supply and delivery of Miscellaneous Spares for all Building and pumping stations / rechlorination buiding / SCADA room etc complete in Operation and Maintenance period of the works. The contractor shall supply the spares to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading and fixing charges etc, complete and as directed by TWAD Board officers
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
Item Rate BoQ
BoQ_Ver4.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE-A3 (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only)
NUMBER #
Outsourcing of Operation and Maintenance of HWS & FMP-Package IV
Outsourcing of Operation and Maintenance of HWS & FMP- Package-IV Supplying designed quantity of water to Package-IV beneficiaries from Master Balancing Reservoir (MBR) at Moongilpatty ( Beneficiaries list in Volume 2/5) including the following I) Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines, water meters, Valves, Pumpsets, Mechanical ,Electrical and ICA Equipments, Panel Boards, Air Conditioner and appurtenances, water retaining structures including protection of all scheme components etc. II) Preventive maintenance. III) Disinfection and delivery of water as per quality standards
IV) Periodical cleaning of water retaining structures once in two months or whenever necessary v) Service Charges etc. Excluding the following i) Cost attending pipeline leaks and bursts. ii) Cost of repair and replacement works to Electro Mechanical, ICA installations. iii) Consumables for disinfection of water and iv) Electricity charges.
For the Period from 01.04.2026 to 31.03.2027 - 12 Months. ( 365 Days X 42.80 ML/Day = 15622 MLD)
Supply and delivery of Liquid Chlorine
Supply and delivery of required Liquid Chlorine (in 100 kg cylinder) as per IS specification and as amended from time to time. The contractor shall supply to the contractor's storage yard / site. The cost includes labour charges for loading, transit insurance, conveyance charges, unloading, processing and handling etc., complete and as directed by TWAD Board officers.
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
Repair and Renewal of Pumpsets
Labour charges for rewinding the following pumpsets with first class insulation wire (with minimum one year Guarantee) including removal of burnt coil, servicing the motor, replacing of bush, bearings, shaft etc., replacing of worn out parts, reconditioning of rotor etc., including removal and re erection of pumpsets, testing, commissioning, conveyance charges etc., complete and as directed by TWAD Board officers.
Open well submersible pump sets
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
Upto 3.00 HP
5.00 HP And Upto 7.50 HP
10.00 HP And Upto 12.50 HP
15.00 HP And Upto 20.00 HP
25.00 HP And Upto 35.00 HP
Labour Charges for stripping out the old windings, rewinding the stator of the above motor using of copper conductor to suit class 'F' style of insulation and using flexible fibre glass cable, inserting the windings, Completely full taping the entire overhang portion of winding on either side, preheating, varnishing with Dr. Beck's Isonel 31J mixed with thinner 31J, baking in oven, applying finishing varnish to the overhang portions. etc…complete (With pre and post work photo documents)
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
HT Motors
3.75 Tonne, CUT 400, 400 KW
3.3 Tonne, CUT 400, 300 KW
2 Tonne ,CUT 355 Type Mounting 150 KW
LT Motors
CUT F 315 Type Mounting 132 KW
CUT F 280 Type Mounting 90 KW
CUT F 260 Type Mounting 55 KW
Leak and Burst rectification works in HDPE and DI pipes
Attending leaks and bursts in HDPE pipes of various sizes including earth work excavation in all type of strata, cost of de-watering from the trenches, removal of leak/burst pipe, lowering the new pipe of respective class, jointing with SS Clamps / butt fusion welding wherever necessary and refilling the trench after attending the leaks/bursts etc., complete excluding cost of pipes within the time frame as specified in the Special conditions of Contract and as directed by TWAD Board officers.
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
63 mm HDPE Pipe
75 mm HDPE Pipe
90 mm HDPE Pipe
110 mm HDPE Pipe
125 mm HDPE Pipe
140 mm HDPE Pipe
160 mm HDPE Pipe
200 mm HDPE Pipe
225 mm HDPE Pipe
250 mm HDPE Pipe
280 mm HDPE Pipe
Attending leaks and bursts in DI pipes of various sizes including earth work excavation in all type of strata, cost of de-watering from the trenches, removal of leak/burst pipe, lowering the new pipe of respective class, jointing with rubber gaskets/Mechanical Joints/SS Clamp wherever necessary and refilling the trench after attending the leaks/bursts etc., complete excluding cost of pipes and specials within the time frame as specified in the Special conditions of Contract and as directed by TWAD Board officers.
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
100 mm DI pipe
150 mm DI pipe
200 mm DI Pipe
250 mm DI Pipe
300 mm DI Pipe
350 mm DI Pipe
400 mm DI Pipe
450 mm DI Pipe
500 mm DI Pipe
Attending leaks and bursts in MS pipes of various sizes including earth work excavation in all type of strata, cost of de-watering from the trenches, removal of leak/burst pipe, lowering the new pipe of respective class, jointing with rubber gaskets/Mechanical Joints/SS Clamp wherever necessary and refilling the trench after attending the leaks/bursts etc., complete excluding cost of pipes and specials within the time frame as specified in the Special conditions of Contract and as directed by TWAD Board officers.
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
850 mm MS pipe
750 mm MS pipe
700 mm MS pipe
600 mm MS pipe
Supply and Delivery of DI pipes and HDPE pipes
Supply and delivery of the following MS pipes as per Table -5 of IS 3589/2001 fabricated with Fe 410 grade steel and other allied codes, Spiral / Longitudinal welding including Pipes shall be internally lined with plant applied cement mortar lining 1:2, The Lining thickness as per Table -8 of IS 3589:2001and Pipes shall be externally coated double coating & double wrapping minimum 4mm thick per metre with plant applied coal Tar as per clause 6.1 of IS 10221:2008 (QAP to be approved by the Engineer suitable for the existing quality of pipe). The cost including labour charges for loading, transit insurance, conveyance charges, unloading, charges etc., complete as directed by TWAD Board officers.
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
850 x 8mm tk MS Pipe
850 x 7mm tk MS Pipe
750 x 8mm tk MS Pipe
750 x 7mm tk MS Pipe
700 x 7mm tk MS Pipe
700 x 6mm tk MS Pipe
600 x 6mm tk MS Pipe
Supply and delivery of the following Ductile iron S/S pipes conforming to IS 8329/2000 and as amended from time to time with ISI marking (QAP to be approved by the engineer suitable for the existing quality of pipe)suitable for water supply main.The contractor shall supply the pipes to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading, etc., complete and as directed by TWAD Board officers for attending leaks and bursts in the pipeline
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
500mm DI K7 pipe
450mm DI K7 pipe
400mm DI K7 pipe
350mm DI K7 pipe
300mm DI K7 pipe
250mm DI K7 pipe
200mm DI K7 pipe
150mm DI K7 pipe
100mm DI K7 pipe
400mm DI K9 pipe
350mm DI K7 pipe
300mm DI K9 pipe
250mm DI K9 pipe
200mm DI K9 pipe
150mm DI K9 pipe
100mm DI K9 pipe
Supply and delivery of the following sizes and class of HDPE pipes - PE 100 conforming to IS 4984/2016 and as amended from time to time(QAP to be approved by the engineer suitable for the existing quality of pipe) in standard lengths The contractor shall supply the pipes to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading, etc., complete and as directed by TWAD Board officers for attending leaks and bursts in the pipeline.
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
315 mm HDPE PN 6 pipe
280 mm HDPE PN 6 pipe
250 mm HDPE PN 6 pipe
200 mm HDPE PN 6 pipe
160 mm HDPE PN 6 pipe
140 mm HDPE PN 6 pipe
110 mm HDPE PN 6 pipe
90mm HDPE PN 6 pipe
75 mm HDPE PN 6 pipe
63 mm HDPE PN 6 pipe
225mm HDPE PN 8 pipe
160mm HDPE PN 8 pipe
140mm HDPE PN 8 pipe
110mm HDPE PN 8 pipe
90mm HDPE PN 8 pipe
75mm HDPE PN 8 pipe
63 mm HDPE PN 8 pipe
200 mm HDPE PN 10 pipe
160mm HDPE PN 10 pipe
110mm HDPE PN 10 pipe
90mm HDPE PN 10 pipe
75 mm HDPE PN 10 pipe
63 mm HDPE PN 10 pipe
63 mm HDPE PN 12.5 pipe
75 mm HDPE PN 12.5 pipe
Supply and delivery of MJ collar with necessary rubber insertions, bolts & nuts including loading & unloading, transporting charges etc., complete at site as per standard specification and as directed by TWAD Board officers.
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
Supply, delivery and fixing of Mechanical Spares
Supply and delivery of Mechanical Spares for all mechanical equipments/installations etc., complete in Operation and Maintenance period of the works. The contractor shall supply the spares to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading and fixing charges etc., complete and as directed by TWAD Board officers
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
Supply delivery and fixing of Electrical Spares
Supply and delivery of Electrical Spares for all electrical equipments/installations etc., complete in Operation and Maintenance period of the works. The contractor shall supply the spares to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading and fixing charges etc., complete and as directed by TWAD Board officers
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
Supply delivery and fixing of ICA Spares
Supply and delivery of ICA Spares for all ICAequipments/installations etc complete in Operation and Maintenance period of the works. The contractor shall supply the spares to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading and fixing charges etc., complete and as directed by TWAD Board officers
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
Supply, delivery and fixing of Miscellaneous Spares for all Building and pumping stations/rechlorination buiding/SCADA room
Supply and delivery of Miscellaneous Spares for all Building and pumping stations / rechlorination buiding / SCADA room etc complete in Operation and Maintenance period of the works. The contractor shall supply the spares to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading and fixing charges etc, complete and as directed by TWAD Board officers
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
Item Rate BoQ
BoQ_Ver4.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE-A4 (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only)
NUMBER #
Outsourcing of Operation and Maintenance of HWS & FMP Package - V
Outsourcing of Operation and Maintenance of HWS & FMP- Package-V Supplying designed quantity of water to Package-V beneficiaries from Master Balancing Reservoir (MBR) at Madam( Beneficiaries list in Volume 2/5) including the following I) Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines, water meters, Valves, Pumpsets, Mechanical ,Electrical and ICA Equipments, Panel Boards, Air Conditioner and appurtenances, water retaining structures including protection of all scheme components etc. II) Preventive maintenance. III) Disinfection and delivery of water as per quality standards
IV) Periodical cleaning of water retaining structures once in two months or whenever necessary V) Service charges Excluding the following i) Cost attending pipeline leaks and bursts. ii) Cost of repair and replacement works to Electro Mechanical, ICA installations. iii) Consumables for disinfection of water and iv) Electricity charges.
For the Period from 01.04.2026 to 31.03.2027 - 12 Months. ( 365 Days X 42.50 ML/Day = 3825 MLD)
Supply and delivery of Liquid Chlorine
Supply and delivery of required liquid Chlorine (in 100 kg cylinder) as per IS specification and as amended from time to time. The contractor shall supply to the contractor's storage yard / site. The cost includes labour charges for loading, transit insurance, conveyance charges, unloading, processing and handling etc., complete and as directed by TWAD Board officers. Note: Additional quantity should be pumped as per the instructions of the Engineer, if any required.
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
Repair and Renewal of Pumpsets
Labour charges for rewinding the following pumpsets with first class insulation wire(with minimum one year Guarantee) including removal of burnt coil, servicing the motor, replacing of bush, bearings, shaft etc., replacing of worn out parts, reconditioning of rotor etc., including removal and re erection of pumpsets, testing, commissioning, conveyance charges etc., complete and as directed by TWAD Board officers.
Open well submersible pump sets
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
Upto 3.00 HP
Above 3.00 HP and Upto 5.00 HP
Above 5.00 HP and Upto 7.5 HP
Above 7.5 HP and Upto 10.00 HP
Above 10.00 HP and Upto 12.50 HP
Above 12.50 HP and Upto 15.00 HP
Above 15.00 HP and Upto 20.00 HP
HSC Pump Sets
Labour Charges for dismantling the motor threading out the rotor from the stator core pack, stripping out the old winding, rewinding the stator using dual coated polymide enameled special made copper wire with F style insulation, preheatning, vaccum impregnating the winding with Domisol resin, baking in oven, applying finishing varnishes for the overhang portions including assembling and conducting no load trial run at rated voltage including the cost of winding materials required after deducting the cost of copper scrap including removal and re-erection of Pumpsets, testing, commissioning, conveyance charges etc., complete and as directed by TWAD Board officers.
HSC Pump Sets
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
Up to 20 HP
Above 20 & up to 40 HP
Above 40 & up to 50 HP
Above 50 & up to 100 HP
VT Pump Sets
Labour Charges for dismantling the motor, threading out the rotor from the stator core pack, stripping out the old windings, rewinding the stator of the above motor using of copper conductor to suit class 'F' style of insulation and using flexible fibre glass cable, inserting the windings, leading out the end connection, Completly full taping the entire overhang portion of winding on either side, preheating, varnishing with Dr. Beck's Isonel 31J mixed with thinner 31J, baking in oven, applying finishing varnish to the overhang portions including assembling and conducting no load trial run at rated voltage placing the motor on grounded bed stimulating the site condition and measuring both electrical and mechanical parameters.
Mounting the stator body in hydraulic press, removing the core pack from stator body with special heating arrangements, segrating the damaged stator core from core pack, removing the old burnt core plate varnishes by chemical treatment, cleaning, removing the surface kinks, varnishing the stampings in re-varnishing cum convery oven to cure the core plate varnish, staggering the core with special jigs and fixtures, locking andrepositioning the core pack to the stator body by hydraulic press and finally conducting the flux loop test to ascertain the restacked core healthiness, cleaning and polishing the slots including testing, commissioning, conveyance charges etc., complete and as directed by TWAD Board officers.
VT Pump Sets
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
120 HP to 150 HP (90KW)
150 HP to 175 HP (132 KW)
Leak and Burst rectification works in HDPE and DI pipes
Attending leaks and bursts in HDPE pipes of various sizes including earth work excavation in all type of strata, cost of de-watering from the trenches, removal of leak/burst pipe, lowering the new pipe of respective class, jointing with SS Clamps / butt fusion welding wherever necessary and refilling the trench after attending the leaks/bursts etc., complete excluding cost of pipes and specials within the time frame as specified in the Special conditions of Contract and as directed by TWAD Board officers.
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
63 mm HDPE Pipe
75 mm HDPE Pipe
90 mm HDPE Pipe
110 mm HDPE Pipe
125 mm HDPE Pipe
140 mm HDPE Pipe
160 mm HDPE Pipe
200 mm HDPE Pipe
225 mm HDPE Pipe
250 mm HDPE Pipe
280 mm HDPE Pipe
315 mm HDPE Pipe
Attending leaks and bursts in DI pipes of various sizes including earth work excavation in all type of strata, cost of de-watering from the trenches, removal of leak/burst pipe, lowering the new pipe of respective class, jointing with rubber gaskets/Mechanical Joints/SS Clamp wherever necessary and refilling the trench after attending the leaks/bursts etc., complete excluding cost of pipes and specials within the time frame as specified in the Special conditions of Contract and as directed by TWAD Board officers.
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
100 mm DI pipe
150 mm DI pipe
200 mm DI Pipe
250 mm DI Pipe
300 mm DI Pipe
350 mm DI Pipe
400 mm DI Pipe
450 mm DI Pipe
Attending leaks and bursts in MS pipes of various sizes including earth work excavation in all type of strata, cost of de-watering from the trenches, removal of leak/burst pipe, lowering the new pipe of respective class, jointing with rubber gaskets/Mechanical Joints/SS Clamp wherever necessary and refilling the trench after attending the leaks/bursts etc., complete excluding cost of pipes and specials within the time frame as specified in the Special conditions of Contract and as directed by TWAD Board officers.
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
1500 mm MS pipe
1200 mm MS pipe
900 mm MS pipe
700 mm MS pipe
Supply and Delivery of MS, DI, HDPE and GI Pipes
Supply and delivery of the following MS pipes as per Table -5 of IS 3589/2001 fabricated with Fe 410 grade steel and other allied codes, Spiral / Longitudinal welding including Pipes shall be internally lined with plant applied cement mortar lining 1:2, The Lining thickness as per Table -8 of IS 3589:2001and Pipes shall be externally coated double coating & double wrapping minimum 4mm thick per metre with plant applied coal Tar as per clause 6.1 of IS 10221:2008 (QAP to be approved by the Engineer suitable for the existing quality of pipe). The cost including labour charges for loading, transit insurance, conveyance charges, unloading, charges etc., complete as directed by TWAD Board officers.
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
Supply and delivery of the following Ductile iron S/S pipes conforming to IS 8329/2000 and as amended from time to time with ISI marking (QAP to be approved by the Engineer suitable for the existing quality of pipe) suitable for water supply main.The contractor shall supply the pipes to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading, etc., complete and as directed by TWAD Board officers for attending leaks and bursts in the pipeline
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
450mm DI K7 pipe
400mm DI K9 pipe
350mm DI K9 pipe
350mm DI K7 pipe
300mm DI K9 pipe
300mm DI K7 pipe
250mm DI K9 pipe
250mm DI K7 pipe
200mm DI K9 pipe
200mm DI K7 pipe
150mm DI K9 pipe
150mm DI K7 pipe
100mm DI K9 pipe
100mm DI K7 pipe
Supply and delivery of the following sizes and class of HDPE pipes - PE 100 conforming to IS 4984/2016 and as amended from time to time(QAP to be approved by the engineer suitable for the existing quality of pipe) in standard lengths. The contractor shall supply the pipes to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading, etc., complete and as directed by TWAD Board officers for attending leaks and bursts in the pipeline.
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
315 HDPE PN6
280 HDPE PN6
250 HDPE PN6
225 HDPE PN6
200 HDPE PN6
160 HDPE PN6
140 HDPE PN8
140 HDPE PN6
125 HDPE PN6
110 HDPE PN6
110 HDPE PN8
90 HDPE PN6
90 HDPE PN8
75 HDPE PN6
63 HDPE PN6
63 HDPE PN8
Supply and delivery of the following MS Supply and delivery of the following sizes of Galvanised mild steel tubes contilnuously welded electrilc resistance welded (ERW), high frequency induction welded (HFIW), hot furnaced welded (HFN) types screwed in both ends, conforming to IS 554/85 for pipes threading, socketted on one end and the other end protected with plastic thread protector, in random length of 4 to 7m GI pipes conforming to IS 1239/PART I/2004 and as amended from time to time and bearing ISI Mark at site of work including loading, freight, unloading, stacking at site and transit insurance, Painting of GI pipes with two coat of approved quality enamel paint etc. complete and as directed by the TWAD Board Officers.
For the Period from 01.01.2026 to 31.03.2027 - 12 Months.
50mm Pipe
80 mm Pipe
100mm Pipe
Supply, delivery and fixing of Mechanical Spares
Supply and delivery of Mechanical Spares for all mechanical equipments/installations etc complete in Operation and Maintenance period of the works. The contractor shall supply the spares to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading and fixing charges etc., complete and as directed by TWAD Board officers
For the Period from 01.01.2026 to 31.03.2027 - 12 Months.
Supply, delivery and fixing of Electrical Spares
Supply and delivery of Electrical Spares for all electrical equipments/installations etc complete in Operation and Maintenance period of the works. The contractor shall supply the spares to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading and fixing charges etc., complete and as directed by TWAD Board officers
For the Period from 01.01.2026 to 31.03.2027 - 12 Months.
Supply, delivery and fixing of ICA Spares
Supply and delivery of ICA Spares for all ICA equipments/ installations etc complete in Operation and Maintenance period of the works. The contractor shall supply the spares to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading and fixing charges etc., complete and as directed by TWAD Board officers
For the Period from 01.01.2026 to 31.03.2027 - 12 Months.
Supply, delivery and fixing of Pipe line appurtances spares
Supply and delivery of Pipe line appurtenances spares for all types of pipes of various sizes etc complete in Operation and Maintenance period of the works. The contractor shall supply the spares to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading and fixing charges etc., complete and as directed by TWAD Board officers
For the Period from 01.01.2026 to 31.03.2027 - 12 Months.
Supply, delivery and fixing of Miscellaneous Spares for all Building and pumping stations/rechlorination buiding/SCADA room
Supply and delivery of Miscellaneous Spares for all Building and pumping stations/ rechlorination buiding/SCADA room etc complete in Operation and Maintenance period of the works. The contractor shall supply the spares to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading and fixing charges etc., complete and as directed by TWAD Board officers
For the Period from 01.01.2026 to 31.03.2027 - 12 Months.
Road Restoration
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
Plain cement concrete 1:4:8 ( One cement, four sand and eight HBS metal) using 40 mm size stone jelly for levelling course including cost of materials mixing of concrete placing in position, consolidation, finishing, curing etc. complete and as directed by TWAD Board Officers.
Plain cement concrete 1:2:4 ( One cement, two sand and four HBS metal) using 20 mm size stone jelly for levelling course including cost of materials mixing of concrete placing in position, consolidation, finishing, curing etc. complete and as directed by TWAD Board Officers.
Item Rate BoQ
BoQ_Ver4.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE-A5 (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only)
NUMBER #
Outsourcing of Operation and Maintenance of HWS & FMP Package - V
Outsourcing of Operation and Maintenance of HWS & FMP- Package-V Supplying designed quantity of water to Package-V beneficiaries from Master Balancing Reservoir (MBR) at Madam( Beneficiaries list in Volume 2/5) including the following I) Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines, water meters, Valves, Pumpsets, Mechanical ,Electrical and ICA Equipments, Panel Boards, Air Conditioner and appurtenances, water retaining structures including protection of all scheme components etc. II) Preventive maintenance. III) Disinfection and delivery of water as per quality standards
IV) Periodical cleaning of water retaining structures once in two months or whenever necessary V) Service charges Excluding the following i) Cost attending pipeline leaks and bursts. ii) Cost of repair and replacement works to Electro Mechanical, ICA installations. iii) Consumables for disinfection of water and iv) Electricity charges.
For the Period from 01.04.2027 to 31.03.2028 - 12 Months. ( 365 Days X 42.50 ML/Day = 3825 MLD)
Supply and delivery of Liquid Chlorine
Supply and delivery of required liquid Chlorine (in 100 kg cylinder) as per IS specification and as amended from time to time. The contractor shall supply to the contractor's storage yard / site. The cost includes labour charges for loading, transit insurance, conveyance charges, unloading, processing and handling etc., complete and as directed by TWAD Board officers. Note: Additional quantity should be pumped as per the instructions of the Engineer, if any required.
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
Repair and Renewal of Pumpsets
Labour charges for rewinding the following pumpsets with first class insulation wire(with minimum one year Guarantee) including removal of burnt coil, servicing the motor, replacing of bush, bearings, shaft etc., replacing of worn out parts, reconditioning of rotor etc., including removal and re erection of pumpsets, testing, commissioning, conveyance charges etc., complete and as directed by TWAD Board officers.
Open well submersible pump sets
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
Upto 3.00 HP
Above 3.00 HP and Upto 5.00 HP
Above 5.00 HP and Upto 7.5 HP
Above 7.5 HP and Upto 10.00 HP
Above 10.00 HP and Upto 12.50 HP
Above 12.50 HP and Upto 15.00 HP
Above 15.00 HP and Upto 20.00 HP
HSC Pump Sets
Labour Charges for dismantling the motor threading out the rotor from the stator core pack, stripping out the old winding, rewinding the stator using dual coated polymide enameled special made copper wire with F style insulation, preheatning, vaccum impregnating the winding with Domisol resin, baking in oven, applying finishing varnishes for the overhang portions including assembling and conducting no load trial run at rated voltage including the cost of winding materials required after deducting the cost of copper scrap including removal and re-erection of Pumpsets, testing, commissioning, conveyance charges etc., complete and as directed by TWAD Board officers.
HSC Pump Sets
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
Up to 20 HP
Above 20 & up to 40 HP
Above 40 & up to 50 HP
Above 50 & up to 100 HP
VT Pump Sets
Labour Charges for dismantling the motor, threading out the rotor from the stator core pack, stripping out the old windings, rewinding the stator of the above motor using of copper conductor to suit class 'F' style of insulation and using flexible fibre glass cable, inserting the windings, leading out the end connection, Completly full taping the entire overhang portion of winding on either side, preheating, varnishing with Dr. Beck's Isonel 31J mixed with thinner 31J, baking in oven, applying finishing varnish to the overhang portions including assembling and conducting no load trial run at rated voltage placing the motor on grounded bed stimulating the site condition and measuring both electrical and mechanical parameters.
Mounting the stator body in hydraulic press, removing the core pack from stator body with special heating arrangements, segrating the damaged stator core from core pack, removing the old burnt core plate varnishes by chemical treatment, cleaning, removing the surface kinks, varnishing the stampings in re-varnishing cum convery oven to cure the core plate varnish, staggering the core with special jigs and fixtures, locking andrepositioning the core pack to the stator body by hydraulic press and finally conducting the flux loop test to ascertain the restacked core healthiness, cleaning and polishing the slots including testing, commissioning, conveyance charges etc., complete and as directed by TWAD Board officers.
VT Pump Sets
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
120 HP to 150 HP (90KW)
150 HP to 175 HP (132 KW)
Leak and Burst rectification works in HDPE and DI pipes
Attending leaks and bursts in HDPE pipes of various sizes including earth work excavation in all type of strata, cost of de-watering from the trenches, removal of leak/burst pipe, lowering the new pipe of respective class, jointing with SS Clamps / butt fusion welding wherever necessary and refilling the trench after attending the leaks/bursts etc., complete excluding cost of pipes and specials within the time frame as specified in the Special conditions of Contract and as directed by TWAD Board officers.
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
63 mm HDPE Pipe
75 mm HDPE Pipe
90 mm HDPE Pipe
110 mm HDPE Pipe
125 mm HDPE Pipe
140 mm HDPE Pipe
160 mm HDPE Pipe
200 mm HDPE Pipe
225 mm HDPE Pipe
250 mm HDPE Pipe
280 mm HDPE Pipe
315 mm HDPE Pipe
Attending leaks and bursts in DI pipes of various sizes including earth work excavation in all type of strata, cost of de-watering from the trenches, removal of leak/burst pipe, lowering the new pipe of respective class, jointing with rubber gaskets/Mechanical Joints/SS Clamp wherever necessary and refilling the trench after attending the leaks/bursts etc., complete excluding cost of pipes and specials within the time frame as specified in the Special conditions of Contract and as directed by TWAD Board officers.
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
100 mm DI pipe
150 mm DI pipe
200 mm DI Pipe
250 mm DI Pipe
300 mm DI Pipe
350 mm DI Pipe
400 mm DI Pipe
450 mm DI Pipe
Attending leaks and bursts in MS pipes of various sizes including earth work excavation in all type of strata, cost of de-watering from the trenches, removal of leak/burst pipe, lowering the new pipe of respective class, jointing with rubber gaskets/Mechanical Joints/SS Clamp wherever necessary and refilling the trench after attending the leaks/bursts etc., complete excluding cost of pipes and specials within the time frame as specified in the Special conditions of Contract and as directed by TWAD Board officers.
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
1500 mm MS pipe
1200 mm MS pipe
900 mm MS pipe
700 mm MS pipe
Supply and Delivery of MS, DI, HDPE and GI Pipes
Supply and delivery of the following MS pipes as per Table -5 of IS 3589/2001 fabricated with Fe 410 grade steel and other allied codes, Spiral / Longitudinal welding including Pipes shall be internally lined with plant applied cement mortar lining 1:2, The Lining thickness as per Table -8 of IS 3589:2001and Pipes shall be externally coated double coating & double wrapping minimum 4mm thick per metre with plant applied coal Tar as per clause 6.1 of IS 10221:2008 (QAP to be approved by the Engineer suitable for the existing quality of pipe). The cost including labour charges for loading, transit insurance, conveyance charges, unloading, charges etc., complete as directed by TWAD Board officers.
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
Supply and delivery of the following Ductile iron S/S pipes conforming to IS 8329/2000 and as amended from time to time with ISI marking (QAP to be approved by the Engineer suitable for the existing quality of pipe) suitable for water supply main.The contractor shall supply the pipes to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading, etc., complete and as directed by TWAD Board officers for attending leaks and bursts in the pipeline
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
450mm DI K7 pipe
400mm DI K9 pipe
350mm DI K9 pipe
350mm DI K7 pipe
300mm DI K9 pipe
300mm DI K7 pipe
250mm DI K9 pipe
250mm DI K7 pipe
200mm DI K9 pipe
200mm DI K7 pipe
150mm DI K9 pipe
150mm DI K7 pipe
100mm DI K9 pipe
100mm DI K7 pipe
Supply and delivery of the following sizes and class of HDPE pipes - PE 100 conforming to IS 4984/2016 and as amended from time to time(QAP to be approved by the engineer suitable for the existing quality of pipe) in standard lengths. The contractor shall supply the pipes to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading, etc., complete and as directed by TWAD Board officers for attending leaks and bursts in the pipeline.
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
315 HDPE PN6
280 HDPE PN6
250 HDPE PN6
225 HDPE PN6
200 HDPE PN6
160 HDPE PN6
140 HDPE PN8
140 HDPE PN6
125 HDPE PN6
110 HDPE PN6
110 HDPE PN8
90 HDPE PN6
90 HDPE PN8
75 HDPE PN6
63 HDPE PN6
63 HDPE PN8
Supply and delivery of the following MS Supply and delivery of the following sizes of Galvanised mild steel tubes contilnuously welded electrilc resistance welded (ERW), high frequency induction welded (HFIW), hot furnaced welded (HFN) types screwed in both ends, conforming to IS 554/85 for pipes threading, socketted on one end and the other end protected with plastic thread protector, in random length of 4 to 7m GI pipes conforming to IS 1239/PART I/2004 and as amended from time to time and bearing ISI Mark at site of work including loading, freight, unloading, stacking at site and transit insurance, Painting of GI pipes with two coat of approved quality enamel paint etc. complete and as directed by the TWAD Board Officers.
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
50mm Pipe
80 mm Pipe
100mm Pipe
Supply, delivery and fixing of Mechanical Spares
Supply and delivery of Mechanical Spares for all mechanical equipments/installations etc complete in Operation and Maintenance period of the works. The contractor shall supply the spares to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading and fixing charges etc., complete and as directed by TWAD Board officers
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
Supply, delivery and fixing of Electrical Spares
Supply and delivery of Electrical Spares for all electrical equipments/installations etc complete in Operation and Maintenance period of the works. The contractor shall supply the spares to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading and fixing charges etc., complete and as directed by TWAD Board officers
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
Supply, delivery and fixing of ICA Spares
Supply and delivery of ICA Spares for all ICA equipments/ installations etc complete in Operation and Maintenance period of the works. The contractor shall supply the spares to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading and fixing charges etc., complete and as directed by TWAD Board officers
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
Supply, delivery and fixing of Pipe line appurtances spares
Supply and delivery of Pipe line appurtenances spares for all types of pipes of various sizes etc complete in Operation and Maintenance period of the works. The contractor shall supply the spares to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading and fixing charges etc., complete and as directed by TWAD Board officers
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
Supply, delivery and fixing of Miscellaneous Spares for all Building and pumping stations/rechlorination buiding/SCADA room
Supply and delivery of Miscellaneous Spares for all Building and pumping stations/ rechlorination buiding/SCADA room etc complete in Operation and Maintenance period of the works. The contractor shall supply the spares to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading and fixing charges etc., complete and as directed by TWAD Board officers
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
Road Restoration
For the Period from 01.04.2027 to 31.03.2028 - 12 Months.
Plain cement concrete 1:4:8 ( One cement, four sand and eight HBS metal) using 40 mm size stone jelly for levelling course including cost of materials mixing of concrete placing in position, consolidation, finishing, curing etc. complete and as directed by TWAD Board Officers.
Plain cement concrete 1:2:4 ( One cement, two sand and four HBS metal) using 20 mm size stone jelly for levelling course including cost of materials mixing of concrete placing in position, consolidation, finishing, curing etc. complete and as directed by TWAD Board Officers.
Item Rate BoQ
BoQ_Ver4.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE-A6 (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only)
NUMBER #
Outsourcing of Operation and Maintenance of HWS & FMP Package - V
Outsourcing of Operation and Maintenance of HWS & FMP- Package-V Supplying designed quantity of water to Package-V beneficiaries from Master Balancing Reservoir (MBR) at Madam( Beneficiaries list in Volume 2/5) including the following I) Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines, water meters, Valves, Pumpsets, Mechanical ,Electrical and ICA Equipments, Panel Boards, Air Conditioner and appurtenances, water retaining structures including protection of all scheme components etc. II) Preventive maintenance. III) Disinfection and delivery of water as per quality standards
IV) Periodical cleaning of water retaining structures once in two months or whenever necessary V) Service charges Excluding the following i) Cost attending pipeline leaks and bursts. ii) Cost of repair and replacement works to Electro Mechanical, ICA installations. iii) Consumables for disinfection of water and iv) Electricity charges.
For the Period from 01.04.2028 to 31.03.2029 - 12 Months. ( 365 Days X 42.50 ML/Day = 3825 MLD)
Supply and delivery of Liquid Chlorine
Supply and delivery of required liquid Chlorine (in 100 kg cylinder) as per IS specification and as amended from time to time. The contractor shall supply to the contractor's storage yard / site. The cost includes labour charges for loading, transit insurance, conveyance charges, unloading, processing and handling etc., complete and as directed by TWAD Board officers. Note: Additional quantity should be pumped as per the instructions of the Engineer, if any required.
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
Repair and Renewal of Pumpsets
Labour charges for rewinding the following pumpsets with first class insulation wire(with minimum one year Guarantee) including removal of burnt coil, servicing the motor, replacing of bush, bearings, shaft etc., replacing of worn out parts, reconditioning of rotor etc., including removal and re erection of pumpsets, testing, commissioning, conveyance charges etc., complete and as directed by TWAD Board officers.
Open well submersible pump sets
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
Upto 3.00 HP
Above 3.00 HP and Upto 5.00 HP
Above 5.00 HP and Upto 7.5 HP
Above 7.5 HP and Upto 10.00 HP
Above 10.00 HP and Upto 12.50 HP
Above 12.50 HP and Upto 15.00 HP
Above 15.00 HP and Upto 20.00 HP
HSC Pump Sets
Labour Charges for dismantling the motor threading out the rotor from the stator core pack, stripping out the old winding, rewinding the stator using dual coated polymide enameled special made copper wire with F style insulation, preheatning, vaccum impregnating the winding with Domisol resin, baking in oven, applying finishing varnishes for the overhang portions including assembling and conducting no load trial run at rated voltage including the cost of winding materials required after deducting the cost of copper scrap including removal and re-erection of Pumpsets, testing, commissioning, conveyance charges etc., complete and as directed by TWAD Board officers.
HSC Pump Sets
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
Up to 20 HP
Above 20 & up to 40 HP
Above 40 & up to 50 HP
Above 50 & up to 100 HP
VT Pump Sets
Labour Charges for dismantling the motor, threading out the rotor from the stator core pack, stripping out the old windings, rewinding the stator of the above motor using of copper conductor to suit class 'F' style of insulation and using flexible fibre glass cable, inserting the windings, leading out the end connection, Completly full taping the entire overhang portion of winding on either side, preheating, varnishing with Dr. Beck's Isonel 31J mixed with thinner 31J, baking in oven, applying finishing varnish to the overhang portions including assembling and conducting no load trial run at rated voltage placing the motor on grounded bed stimulating the site condition and measuring both electrical and mechanical parameters.
Mounting the stator body in hydraulic press, removing the core pack from stator body with special heating arrangements, segrating the damaged stator core from core pack, removing the old burnt core plate varnishes by chemical treatment, cleaning, removing the surface kinks, varnishing the stampings in re-varnishing cum convery oven to cure the core plate varnish, staggering the core with special jigs and fixtures, locking andrepositioning the core pack to the stator body by hydraulic press and finally conducting the flux loop test to ascertain the restacked core healthiness, cleaning and polishing the slots including testing, commissioning, conveyance charges etc., complete and as directed by TWAD Board officers.
VT Pump Sets
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
120 HP to 150 HP (90KW)
150 HP to 175 HP (132 KW)
Leak and Burst rectification works in HDPE and DI pipes
Attending leaks and bursts in HDPE pipes of various sizes including earth work excavation in all type of strata, cost of de-watering from the trenches, removal of leak/burst pipe, lowering the new pipe of respective class, jointing with SS Clamps / butt fusion welding wherever necessary and refilling the trench after attending the leaks/bursts etc., complete excluding cost of pipes and specials within the time frame as specified in the Special conditions of Contract and as directed by TWAD Board officers.
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
63 mm HDPE Pipe
75 mm HDPE Pipe
90 mm HDPE Pipe
110 mm HDPE Pipe
125 mm HDPE Pipe
140 mm HDPE Pipe
160 mm HDPE Pipe
200 mm HDPE Pipe
225 mm HDPE Pipe
250 mm HDPE Pipe
280 mm HDPE Pipe
315 mm HDPE Pipe
Attending leaks and bursts in DI pipes of various sizes including earth work excavation in all type of strata, cost of de-watering from the trenches, removal of leak/burst pipe, lowering the new pipe of respective class, jointing with rubber gaskets/Mechanical Joints/SS Clamp wherever necessary and refilling the trench after attending the leaks/bursts etc., complete excluding cost of pipes and specials within the time frame as specified in the Special conditions of Contract and as directed by TWAD Board officers.
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
100 mm DI pipe
150 mm DI pipe
200 mm DI Pipe
250 mm DI Pipe
300 mm DI Pipe
350 mm DI Pipe
400 mm DI Pipe
450 mm DI Pipe
Attending leaks and bursts in MS pipes of various sizes including earth work excavation in all type of strata, cost of de-watering from the trenches, removal of leak/burst pipe, lowering the new pipe of respective class, jointing with rubber gaskets/Mechanical Joints/SS Clamp wherever necessary and refilling the trench after attending the leaks/bursts etc., complete excluding cost of pipes and specials within the time frame as specified in the Special conditions of Contract and as directed by TWAD Board officers.
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
1500 mm MS pipe
1200 mm MS pipe
900 mm MS pipe
700 mm MS pipe
Supply and Delivery of MS, DI, HDPE and GI Pipes
Supply and delivery of the following MS pipes as per Table -5 of IS 3589/2001 fabricated with Fe 410 grade steel and other allied codes, Spiral / Longitudinal welding including Pipes shall be internally lined with plant applied cement mortar lining 1:2, The Lining thickness as per Table -8 of IS 3589:2001and Pipes shall be externally coated double coating & double wrapping minimum 4mm thick per metre with plant applied coal Tar as per clause 6.1 of IS 10221:2008 (QAP to be approved by the Engineer suitable for the existing quality of pipe). The cost including labour charges for loading, transit insurance, conveyance charges, unloading, charges etc., complete as directed by TWAD Board officers.
For the Period from 01.04.2026 to 31.03.2027 - 12 Months.
Supply and delivery of the following Ductile iron S/S pipes conforming to IS 8329/2000 and as amended from time to time with ISI marking (QAP to be approved by the Engineer suitable for the existing quality of pipe) suitable for water supply main.The contractor shall supply the pipes to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading, etc., complete and as directed by TWAD Board officers for attending leaks and bursts in the pipeline
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
450mm DI K7 pipe
400mm DI K9 pipe
350mm DI K9 pipe
350mm DI K7 pipe
300mm DI K9 pipe
300mm DI K7 pipe
250mm DI K9 pipe
250mm DI K7 pipe
200mm DI K9 pipe
200mm DI K7 pipe
150mm DI K9 pipe
150mm DI K7 pipe
100mm DI K9 pipe
100mm DI K7 pipe
Supply and delivery of the following sizes and class of HDPE pipes - PE 100 conforming to IS 4984/2016 and as amended from time to time(QAP to be approved by the engineer suitable for the existing quality of pipe) in standard lengths. The contractor shall supply the pipes to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading, etc., complete and as directed by TWAD Board officers for attending leaks and bursts in the pipeline.
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
315 HDPE PN6
280 HDPE PN6
250 HDPE PN6
225 HDPE PN6
200 HDPE PN6
160 HDPE PN6
140 HDPE PN8
140 HDPE PN6
125 HDPE PN6
110 HDPE PN6
110 HDPE PN8
90 HDPE PN6
90 HDPE PN8
75 HDPE PN6
63 HDPE PN6
63 HDPE PN8
Supply and delivery of the following MS Supply and delivery of the following sizes of Galvanised mild steel tubes contilnuously welded electrilc resistance welded (ERW), high frequency induction welded (HFIW), hot furnaced welded (HFN) types screwed in both ends, conforming to IS 554/85 for pipes threading, socketted on one end and the other end protected with plastic thread protector, in random length of 4 to 7m GI pipes conforming to IS 1239/PART I/2004 and as amended from time to time and bearing ISI Mark at site of work including loading, freight, unloading, stacking at site and transit insurance, Painting of GI pipes with two coat of approved quality enamel paint etc. complete and as directed by the TWAD Board Officers.
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
50mm Pipe
80 mm Pipe
100mm Pipe
Supply, delivery and fixing of Mechanical Spares
Supply and delivery of Mechanical Spares for all mechanical equipments/installations etc complete in Operation and Maintenance period of the works. The contractor shall supply the spares to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading and fixing charges etc., complete and as directed by TWAD Board officers
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
Supply, delivery and fixing of Electrical Spares
Supply and delivery of Electrical Spares for all electrical equipments/installations etc complete in Operation and Maintenance period of the works. The contractor shall supply the spares to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading and fixing charges etc., complete and as directed by TWAD Board officers
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
Supply, delivery and fixing of ICA Spares
Supply and delivery of ICA Spares for all ICA equipments/ installations etc complete in Operation and Maintenance period of the works. The contractor shall supply the spares to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading and fixing charges etc., complete and as directed by TWAD Board officers
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
Supply, delivery and fixing of Pipe line appurtances spares
Supply and delivery of Pipe line appurtenances spares for all types of pipes of various sizes etc complete in Operation and Maintenance period of the works. The contractor shall supply the spares to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading and fixing charges etc., complete and as directed by TWAD Board officers
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
Supply, delivery and fixing of Miscellaneous Spares for all Building and pumping stations/rechlorination buiding/SCADA room
Supply and delivery of Miscellaneous Spares for all Building and pumping stations/ rechlorination buiding/SCADA room etc complete in Operation and Maintenance period of the works. The contractor shall supply the spares to the Contractor's storage yard and also storage yard to Site whenever necessary. The cost includes labour charges for loading, transit insurance, Conveyance Charges, unloading and fixing charges etc., complete and as directed by TWAD Board officers
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
Road Restoration
For the Period from 01.04.2028 to 31.03.2029 - 12 Months.
Plain cement concrete 1:4:8 ( One cement, four sand and eight HBS metal) using 40 mm size stone jelly for levelling course including cost of materials mixing of concrete placing in position, consolidation, finishing, curing etc. complete and as directed by TWAD Board Officers.
Plain cement concrete 1:2:4 ( One cement, two sand and four HBS metal) using 20 mm size stone jelly for levelling course including cost of materials mixing of concrete placing in position, consolidation, finishing, curing etc. complete and as directed by TWAD Board Officers.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.37 MB
hwsbidpivandv.pdf
Tender Documents • 1.48 MB
BOQ_762858.xls
BOQ • 0.94 MB
Download all tender documents and submit your bid