Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 LAdmitted-Finance COLLINPUR SOUTH ANDAMAN | ₹3.5 L | L1 | Admitted-Finance |
| 2 | L2₹3.6 L+₹9,964.84 (2.89%)Admitted-Finance | ₹3.6 L+₹9,964.84 (2.89%) | L2 | Admitted-Finance |
| 3 | L3₹3.6 L+₹14,984.48 (4.34%)Admitted-Finance TUSHNABAD SOUTH ANDAMAN | ₹3.6 L+₹14,984.48 (4.34%) | L3 | Admitted-Finance |
| 4 | L4₹4.0 L+₹51,696.68 (15.0%)Admitted-Finance | ₹4.0 L+₹51,696.68 (15.0%) | L4 | Admitted-Finance |
| 5 | L5₹4.2 L+₹77,606.30 (22.5%)Admitted-Finance | ₹4.2 L+₹77,606.30 (22.5%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | T ABDUL BASHEER L5 | M/S HABIB CONSTRUCTION L4 | SONA MONA TRADERS L2 | RAKESH SAHA L1 | M/s CVR ENTERPRISES L6 | AVIS CONSTRUCTION L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 19.8 | m3 | 350 ₹6,930 | 500 ₹9,900 | 380 ₹7,524 | 250 ₹4,950 | 600 ₹11,880 | 220 ₹4,356 Lowest |
| 2.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 1.8 | m3 | 9,500 ₹17,100 | 10,000 ₹18,000 | 8,200 ₹14,760 | 8,000 ₹14,400 Lowest | 9,000 ₹16,200 | 8,500 ₹15,300 |
| 3.00 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level : 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 6.72 | m3 | 13,000 ₹87,360 | 12,000 ₹80,640 | 11,500 ₹77,280 | 10,000 ₹67,200 Lowest | 12,500 ₹84,000 | 11,000 ₹73,920 |
| 4.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. Earth work in excavation | 10.23 | m3 | 350 ₹3,580.5 | 500 ₹5,115 | 220 ₹2,250.6 | 250 ₹2,557.5 | 357 ₹3,652.11 | 200 ₹2,046 Lowest |
| 5.00 | Centring and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete. | 8.84 | m2 | 250 ₹2,210 | 100 ₹884 Lowest | 320 ₹2,828.8 | 300 ₹2,652 | 390 ₹3,447.6 | 220 ₹1,944.8 |
| 6.00 | Centring and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | 54 | m2 | 380 ₹20,520 | 100 ₹5,400 Lowest | 320 ₹17,280 | 350 ₹18,900 | 500 ₹27,000 | 220 ₹11,880 |
| 7.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Cold twisted bars | 1,111.81 | kg | 130 ₹1,44,535.56 | 120 ₹1,33,417.44 | 100 ₹1,11,181.2 Lowest | 105 ₹1,16,740.26 | 140 ₹1,55,653.68 | 120 ₹1,33,417.44 |
| 8.00 | 12 mm cement plaster of mix : 1:4 (1 cement : 4 coarse sand | 25.2 | m2 | 525 ₹13,230 | 500 ₹12,600 | 450 ₹11,340 | 300 ₹7,560 Lowest | 600 ₹15,120 | 400 ₹10,080 |
| 9.00 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement : 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 9 | m3 | 13,000 ₹1,17,000 | 13,000 ₹1,17,000 | 11,500 ₹1,03,500 | 11,000 ₹99,000 Lowest | 13,000 ₹1,17,000 | 11,500 ₹1,03,500 |
| 10.00 | Providing and fixing PVC pipe 75mm dia as weep holes | 6 | mtr | 100 ₹600 Lowest | 300 ₹1,800 | 300 ₹1,800 | 250 ₹1,500 | 300 ₹1,800 | 200 ₹1,200 |
Tender Value
₹4.7 L
EMD Value
₹9,454
Closing Date
23 Sept 2025, 6:00 pmClosed
Deputy Conservator Of Forests Wildlife Division
DCF Wildlife Division Haddo
Construction of Retaining Wall 04mtrs height at Pongibalu
2025_DCFWL_19870_2
WL/G-17/5/1446
Open Tender
Civil Works - Others
Works
180 days
Wildlife Division
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹9,454
Yes
27 Oct 2025
17 Sept 2025
25 Sept 2025
17 Sept 2025
23 Sept 2025
17 Sept 2025
Amount
Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size).
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level : 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. Earth work in excavation
Centring and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete.
Centring and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Cold twisted bars
12 mm cement plaster of mix : 1:4 (1 cement : 4 coarse sand
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement : 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Providing and fixing PVC pipe 75mm dia as weep holes
Collection and filling of stone boulder at the rear side of the wall for filter media
SONA MONA TRADERS (BID ID -58863)
AVIS CONSTRUCTION (BID ID -58824)
M/S HABIB CONSTRUCTION (BID ID -58833)
T ABDUL BASHEER (BID ID -58694)
M/s CVR ENTERPRISES (BID ID -58795)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .