Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC SHOP NO 10 BMC SHOPPING CENTRE MITHA NAGAR GOREGAON WEST MUMBAI 400 104 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400104 | ₹1.4 Cr | L1 | Accepted-AOC QUOTED L1 |
| 2 | L2₹1.6 Cr+₹11.7 L (8.09%)Rejected-AOC PLOT NO 1134 1196 MORIVALI VILLAGE TAL AMBARNATH DIST THANE AMBERNATH 421505 | AMBERNATH | THANE | MAHARASHTRA | 421505 | ₹1.6 Cr+₹11.7 L (8.09%) | L2 | Rejected-AOC NOT ADMITTED |
| 3 | L3₹1.6 Cr+₹13.5 L (9.37%)Rejected-AOC SWAGAT CO OP HSG SOCIETY LTD 22 303 CHAITANYA SHIVAJI RAJE COMPLEX MHADA COMPLEX OPP EKA NAGAR KANDIVALI W MUMBAI 400 067 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400067 | ₹1.6 Cr+₹13.5 L (9.37%) | L3 | Rejected-AOC NOT ADMITTED |
| 4 | L4₹1.6 Cr+₹15.2 L (10.5%)Rejected-AOC 1101 A WING SACHDEV COMPLEX JANGAL MANGAL RAOD BHANDUP W MUMBAI 400078 | MUMBAI SUBURBAN | MAHARASHTRA | 400078 | ₹1.6 Cr+₹15.2 L (10.5%) | L4 | Rejected-AOC NOT ADMITTED |
| 5 | Rejected-Technical 1446 ELITE ENTERPRISES NORTH SOLAPUR NEAR SUSHIL MARATHI SCHOOL SOLAPUR MAHARASHTRA 413004 | SOLAPUR | MAHARASHTRA | 413004 | - | - | Rejected-Technical NOT ADMITTED |
Tender Value
Refer Docs
EMD Value
₹2.2 L
Closing Date
8 Feb 2022, 6:00 pmClosed
CWE (SUBS) MUMBAI
Commander Works Engineer Subs NCHC Powai Bhandup Post Office Mumbai 400 078
8816/E8
2022_MES_501272_1
8816/E8
Open Tender
Civil Works
Item Rate
330 days
MANKHURD
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,000
GE (NW) MANKHURD
₹2.2 L
Yes
4 Mar 2022
13 Jan 2022
10 Feb 2022
13 Jan 2022
8 Feb 2022
28 Jan 2022
Amount
Manning & Operation of Central AC Plants [Installation consisting of AC Plant of direct expansion type 42 TR capacity having 03 Nos compressors each of 21 TR capacity (02 Nos. working at a time and 01 No. standby) with all connected equipments and machineries round the clock through out the month in three shifts (including Sundays and Holidays) by employing one operator cum AC machenic per shift of eight hours including carrying out routine maintenance and upkeeping the Installation / AC Plants in operation condition complete in all respects as specified and directed :- Location : Store House SSK Building at WED Mankhurd: (i) 1st shift - 0600 hrs to 1400 hrs (ii) 2nd shift - 1400 hrs to 2200 hrs (iii) 3rd shift - 2200 hrs to 0600 hrs
Manning & Operation of Central AC Plants [Installation consisting of AC Plant of direct expansion type 40 TR capacity having 02 Nos compressors each of 20 TR capacity (01 No. working at a time and 01 No. standby) with all connected equipments and machineries round the clock through out the month in three shifts (including Sundays and Holidays) by employing one operator cum AC machenic per shift of eight hours including carrying out routine maintenance and upkeeping the Installation / AC Plants in operation condition complete in all respects as specified and directed :- Location : Store House No. 5 & 6 at WED Mankhurd: (i) 1st shift - 0600 hrs to 1400 hrs (ii) 2nd shift - 1400 hrs to 2200 hrs (iii) 3rd shift - 2200 hrs to 0600 hrs
Manning & Operation of Central AC Plants [Installation consisting of AC Plant with chilled water system 60 TR capacity having 03 Nos compressors each of 30 TR capacity (02 Nos. working at a time and 01 No. standby) with all connected equipments and machineries round the clock through out the month in three shifts (including Sundays and Holidays) by employing one operator cum AC machenic per shift of eight hours including carrying out routine maintenance and upkeeping the Installation / AC Plants in operation condition complete in all respects as specified and directed :- Location : Store House No. (8 & 9) & (10 & 11) at WED Mankhurd: (i) 1st shift - 0600 hrs to 1400 hrs (ii) 2nd shift - 1400 hrs to 2200 hrs (iii) 3rd shift - 2200 hrs to 0600 hrs
Manning & Operation of Central AC Plants [Installation consisting of AC Plant with chilled water system 76 TR capacity having 03 Nos compressors each of 38 TR capacity (02 Nos. working at a time and 01 No. standby) with all connected equipments and machineries round the clock through out the month in three shifts (including Sundays and Holidays) by employing one operator cum AC machenic per shift of eight hours including carrying out routine maintenance and upkeeping the Installation / AC Plants in operation condition complete in all respects as specified and directed :- Location : WED Mankhurd (DSRV) : (i) 1st shift - 0600 hrs to 1400 hrs (ii) 2nd shift - 1400 hrs to 2200 hrs (iii) 3rd shift - 2200 hrs to 0600 hrs Notes for ITEM NOS 01 TO 04: Quoted rates shall also be deemed to include the following elements:- (i) To provide uniform, tools & plants, safety means like glove etc to the employees and also alternative employee (reliever) for Manning and Operation of AC Plants/Installation so that the other employees can avail the facility of weekly leave etc. (ii) To keep the AC Plant Room & allied area in clean and tidy condition during the operation period. (iii) To carryout the routine maintenance, minor repairs, oiling, greasing and to rectify the minor defects to keep the plants / Installation in serviceable condition all as directed by the GE and Engineer-in-Charge. However, the major repairs, replacements, overhauling, gas charging, topping-up oil etc are not included in the scope of the above items. (iv) To keep necessary documentation duly signed by all the concerned. (v) To hand over the entire plant in serviceable condition at the time of completion.
Manning & Operation of Central AC Plants [Installation consisting of AC Plant with chilled water system 160 TR capacity having 03 Nos compressors each of 80 TR capacity (02 Nos working at a time and 01 No. standby) with all connected equipments and machineries round the clock through out the month in three shifts (including Sundays and Holidays) by employing one operator cum AC machenic per shift of eight hours including carrying out routine maintenance and upkeeping the Installation / AC Plants in operation condition complete in all respects as specified and directed :- Location : 160TR AC Plant TS Mahul: (i) 1st shift - 0600 hrs to 1400 hrs (ii) 2nd shift - 1400 hrs to 2200 hrs (iii) 3rd shift - 2200 hrs to 0600 hrs
Manning & Operation of Central AC Plants [Installation consisting of AC Plant with chilled water system 30 TR capacity having 03 Nos compressors each of 18 TR capacity (02 Nos. working at a time and 01 No. standby) with all connected equipments and machineries round the clock through out the month in three shifts (including Sundays and Holidays) by employing one operator cum AC machenic per shift of eight hours including carrying out routine maintenance and upkeeping the Installation / AC Plants in operation condition complete in all respects as specified and directed :- Location : Rukmani TS Mahul (i) 1st shift - 0600 hrs to 1400 hrs (ii) 2nd shift - 1400 hrs to 2200 hrs (iii) 3rd shift - 2200 hrs to 0600 hrs
Manning & Operation of Central AC Plants [Installation consisting of AC Plant with chilled water system 60 TR capacity having 03 Nos compressors each of 30 TR capacity (02 Nos working at a time and 01 No. standby) with all connected equipments and machineries round the clock through out the month in two shifts (including Sundays and Holidays) by employing one operator cum AC machenic per shift of eight hours including carrying out routine maintenance and upkeeping the Installation / AC Plants in operation condition complete in all respects as specified and directed :- Location :31 WEU THANE (i) 1st shift - 0600 hrs to 1400 hrs (ii) 2rd shift - 1400 hrs to 2200 hrs (iii) 3rd shift - 2200 hrs to 0600 hrs Notes for ITEM NOS 05 TO 07: Quoted rates shall also be deemed to include the following elements:- (i) To provide uniform, tools & plants, safety means like glove etc to the employees and also alternative employee (reliever) for Manning and Operation of AC Plants/Installation so that the other employees can avail the facility of weekly leave etc. (ii) To keep the AC Plant Room & allied area in clean and tidy condition during the operation period. (iii) To carryout the routine maintenance, minor repairs, oiling, greasing and to rectify the minor defects to keep the plants / Installation in serviceable condition all as directed by the GE and Engineer-in-Charge. However, the major repairs, replacements, overhauling, gas charging, topping-up oil etc are not included in the scope of the above items. (iv) To keep necessary documentation duly signed by all the concerned. (v) To hand over the entire plant in serviceable condition at the time of completion.
M & L for dismantling condenser connections for descaling, plugging them and providing 15 mm bore tee outlet for local circulation of mild acid solution in the condenser (separate container and small pump set to circulate mild acid solution shall be used). The PH value of solution shall be 4 and it shall be checked frequently i.e. every 1 hour during the operation. The Scalgun WS solution or equivalent solution as approved by the GE shall be used for discaling purpose. After 2 to 3 hours of cleaning, if the PH value remains less than 7, flush with fresh water added with sodium carbonate. After above process, the end covers shall be opened and condenser tubes shall be cleaned with Nylon brush, subsequently after closing the end covers, circulate mild acid solution as specified above and PH value shall be maintained as above, flushing the same with fresh water including recharging of stored refrigerant upto required pressure complete all as specified and directed for AC Plant of condensor 3 x 80 TR capacity (MTS TS Mahul). Notes: The quoted rates shall also be deemed to include the following elements :- (a) The solution shall be warmed upto 35 Degree Celsius. (b) During the entire process of cleaning, the PH value of water shall be 7. (c) Provision of solution for descaling, rubber gaskets, washers, nuts, bolts etc as directed.
-diito- all as per item No.8 hereinbefore but for Condensar of AC Plant of 2 x 40 TR Capacity (Store 5 & 6 WED).
-diito- all as per item No.8 hereinbefore but for Condensar of AC Plant of 3 x 30TR Capacity , (Store 8 & 9, WED) & (Sonobway, WED).SSK
-diito- all as per item No.8 hereinbefore but for Condensar of AC Plant of 3 x 38TR Capacity DSRV WED
-diito- all as per item No.8 hereinbefore but for Condensar of AC Plant of 3 x 13TR Capacity Rukmani Mahul
Disconnecting chiller connection for descaling, providing 2 Nos of 15mm dia tee and plugging for circulating mild acid solution in the chiller (Separate container and small pump set shall be used to circulate mild acid solution with PH value 4). The Scalgun WS/Cleansol or equivalent solution as approved by the GE shall be used for descaling purpose. After 2 to 3 hours of cleaning if the PH value remains less than 7, flush with fresh water added with sodium carbonate till PH value attains to 7 for the chiller connection of AC plants of 3 x 80 TR Capacity (MTS TS Mahul) complete all as specified and directed. Notes: The quoted rates shall also be deemed to include the following elements :- (a) The solution shall be warmed upto 35 Degree Celsius (b) During the entire process of cleaning, the PH value of water shall be 7. (c) Provision of solution for descaling, rubber gaskets, washers, nuts, bolts etc as directed.
-ditto- all as per item No.13 hereinbefore above but for the chiller connection of AC Plant of 2 x 40 TR Capacity (Store 5 & 6, WED).
-ditto- all as per item No.13 hereinbefore but for the chiller connection of AC Plant of 3 x 30 TR Capacity (Store 8 & 9, WED) (Sonoboy WED).
-ditto- all as per item No. 13 hereinbefore but for the chiller connection of AC Plant of 3 x 38 TR Capacity (DSRV WED)
-ditto- all as per item No. 13 hereinbefore but for the chiller connection of AC Plant of 2 x 38/39 TR Capacity (Rukmani Mahul)
Supply only compressor oil as per requirement, complete all as specified and directed, Make :Servo, HP, BP, Sheetal N-68, Freezol 36
Supply only refrigerant (R-22) gas as per requirement, complete all as specified and directed. Make : MAFRON/FLORON/ REFRON/ FREON Note-: The quantity of the above items shall only be operated to the extent required for topping-up as specified in the relevant other connected items of BOQ.
Supply only refrigerant (R-407C) gas as per requirement, complete all as specified and directed. Make : MAFRON/FLORON/ REFRON/ FREON Note-: The quantity of the above items shall only be operated to the extent required for topping-up as specified in the relevant other connected items of BOQ.
Supply and fixing in repair Scrooll Compressor upto 60 TR capacity from the unit after disconnecting electrical wiring & piping connecting nut & bolts etc refixing & installed of scroll compressor and connecting pipe line for existing pipe brazing & electric connecting etc and testing for smooth functioning etc, complete all as specified and directed.
Dismantling cooling coil section of AHU for descaling and provision of 2 Nos 15mm tee outlet for local circulation of mild acid solution in the coil. Separate container and small pump set shall be used to circulate mild acid solution with 4 PH value. The Scalgun WS/Cleansol or equivalent solution as approved by the GE shall be used for descaling. If the PH value remains less than 7, flush with fresh water added with sodium carbonate till PH value attains to 7. Refixing the coil section in position, carryout minor repairs including fixing arrangement etc. AHU coil fins shall be cleaned by Sealgum solution by spraying the solution with washing pump upto the required level for 160 TR Capacity of AHU Plant (Mahul).
-ditto- all as per item No. 22 hereinbefore but for 60 TR capacity (Location : WED )
-ditto- all as per item No.22 hereinbefore but for 40 TR capacity (Location : WED)
-ditto- all as per item No.22 hereinbefore but for 38 TR capacity (Location :DSRV WED)
-ditto- all as per item No.22 hereinbefore but for 36 TR capacity (Location Rukmani Mahul)
Re-winding of 100 HP capacity compressor electric motor 3 phase, 50Hz, 415 Volts of pump set complete all as specified and directed. NOTES: The quoted rates shall also be deemed to include the following elements:- (a) Disconnecting & removing the electric motor from installed position including loading, unloading and transporting to approved workshop. (b) Dismantling the existing burnt winding from the motor including winding with new super enamelled copper winding wire of existing gauge, also including provision of all insulating material such as insulation paper, sleeves, tape, varnish etc complete in all respects for class ’F’ insulation. (c) Transporting the motor back to the location, reinstalling in original position including making alignment, electric connection etc complete, commissioning and testing for 8 hours continuously to check the RPM to the satisfaction of Engineer-in-Charge. (Note : Any damage caused during handling and rewinding etc will be made good by the contractor at his own cost).
-ditto- all as per item No. 27 above but 40 HP capacity motor.
-ditto- all as per item No. 27 above but 20/25 HP capacity motor
-ditto- all as per item No.27 above but 10 HP capacity motor.
-ditto- all as per item No. 27 above but 7.5 HP capacity Motor.
-ditto- all as per item No. 27 above but 5 HP capacity Motor.
-ditto- all as per item No. 27 above but 3 HP capacity Motor.
Supply and fix in repairs automatic capacity control pilot solenoid valve suitable for the liquid line of AC Plants of various capacity complete all as specified and directed, Make :- Rotex, Avcon, SPORLAN, DANFOSS.
M & L for thermal insulation over 150mm bore chiller water piping with closed cell nitrile rubber class 'O' of 32mm thick for suitable pipe size mechanically covered with 26 g aluminium cladded, complete all as specified and directed, Make: Lloyd's / TWIGA/ FGP Ltd.
-Dittio- all as per item No. 35 above but over 80mm bore chiller water piping
-Dittio- all as per item No. 35 above but over 50mm bore chiller water piping
Dismantling of Monoblock pump of under mentiuoned capcities from connected suction/delivery pipes and electric connections etc, taking to workshop, overhauling of the same and replacing unserviceable spares/parts/components, cleaning of impeller, greasing reassembling, bringing providing paking necessary nuts & bolts etc and reconnecting, recommissioning and testing for smooth functioning. Location : WED, & TS Mahul. (Notes: Cost of all the elements (material cost as well as labour cost) for making the pumps completely functional except the following shall be deemed to be included in the quoted ratess: (a) Supply only spares included under item Nos. 43.01 to 43.12 hereinafter.
40 HP Capacity
20/25 HP Capacity
10 HP Capacity
7.5 HP Capacity
Supply only following spares /components/parts for monoblock pump set all as specified and directed :-
Gun metal bushes for 40 HP capacity
Gun metal bushes for 20/25 HP capacity
Gun metal bushes for 10 HP capacity
Gun metal bushes for 7.5 HP capacity
Gland packing set for 40 HP capacity
Gland packing set for 20/25 HP capacity
Gland packing set for 10 HP capacity
Gland packing set for 7.5HP capacity
Bearing for 7.5 HP capacity Make : SKF, TATA, NBC
Bearing for 10HP capacity Make : SKF, TATA, NBC
Water seal packing for 7.5 HP capacity
Water seal packing for 10 HP capacity
Taking down AC Plant compressor reciprocating type model SMC-4-100 of ACCEL Make by dismantling complete assembly, after pumping down refrigerant R-22,overhauling the compressor including replacement of unserviceable spares, also including machining of crank shaft bearing, polishing, replacing of gaskets packing, reassembly and recharging of pumped down Refrigerant, also charging of additional refrigerant upto the required pressure & topping up if required to maintain the required standing charged pressure of compressor oil, testing for smooth functioning etc, complete all as specified and directed. Location : Sonu Bouy WED (Note: Cost of all the elements (material cost as well as labour cost) for making the compressors completely functional except the following shall be deemed to be included in the quoted rates : (a) Supply only additonal refrigerant required for recharging of pumped down refrigerant, if required. (b) Supply only compressor oil for topping up, if required.
Supply only following spares for compressor reciprocating type model SMC- 4-65, Make : ACCEL :
Supply & fix Crank shaft duly remetalised, grinded, polished and made to size to match with the existing.
Piston rings Cat No. N-5959
Piston Cat No. V-6138
Piston Pin Cat No. F-6701
Piston Oil rings Cat No. B-1470
Connecting rod bearing Cat No. F-8363
Main bearing (Set of two) Cat No. F-6085A
Liner assembly Cat No. F-8371
Oil pump assembly Cat No. V-6166
Rocker arm Cat No. F-7152
Loader/unloader spring Cat No. F-6085
Suction valve reeds Cat No. F-6080
Discharge valve reeds Cat No. F-7399
Oil filter Cat No. V-6168
Suction Filter Cat No. V-6132
Oil pressure regulating valve Cat No. F-8368
Gasket set of make Neopene or equivalent as appoved by the GE
Compressor safety valve Cat No. V-8759
Shaft seal assembly, Cat No. V-8405
Piston sleeves bushing with collars, Cat No. V-8783 Note : The quantity of item Nos 45.01 to 45.20 shall be operated only to the extent required replacement for compressors under item No. 44.00 here-in-before. Unless othewise spcified in the BOQ, these shall be of make ACCEL & of mentioned Cat No in the BOQ and shall be suitable for the compressors under item No 44.00 all as directed and approved by the GE.
Taking down AC Plant compressor reciprocating type model SMC- 8-100 of ACCEL Make by dismantling complete assembly after pumping down refrigerant R-22,overhauling the compressor including replacement of unserviceable spares, also including machining of crank shaft bearing, polishing, replacing of gaskets packing, reassembly and recharging of pumped down Refrigerant, also charging of additional refrigerant upto the required pressure & topping up if required to maintain the required standing charged pressure of compressor oil, testing for smooth functioning etc, complete all as specified and directed. Location : TS Mahul (Note: Cost of all the elements (material cost as well as labour cost) for making the compressors completely functional except the following shall be deemed to be included in the quoted rates : (a) Supply only additonal refrigerant required for recharging of pumped down refrigerant, if required. (b) Supply only compressor oil for topping up, if required.
Supply only following spares for compressor reciprocating model SMC- 8-100, Make : ACCEL :
Crank shaft duly remetalised, grinded, polished and made to size to match with the existing, Cat No. F-7713
Piston Cat No. F-6503
Piston Oil rings Cat No.F-6523
Main sealing bearing (Set of two) Cat No. F-7276
Liner assembly Cat No. F-7167
Oil pump assembly Cat No. F-6501
Rocker arm Cat No. F-7166
Loader/unloader spring Lock Cat No. F-7277
Piston sleeves bushing with collar, Cat No. F-7165
Suction valve reeds Cat No. F-8162
Discharge valve reeds Cat No. F-6504
Oil filter Cat No. F-7796
Suction Filter Cat No. F-7167
Oil pressure regulating valve Cat No. F-6507
Connecting rod bearing Cat No. F-7164
Gasket set of make Neopene or equivalent as appoved by the GE
Compressor safety valve Cat No. F-7278
Shaft seal assembly, Cat No. F-7646 Note : The quantity of item Nos 46.01 to 46.18 shall be operated only to the extent required replacement for compressors under item No. 45.00 here-in-before. Unless othewise spcified in the BOQ, these shall be of make ACCEL & of mentioned Cat No in the BOQ and shall be suitable for the compressors under item No 45.00 all as directed and approved by the GE.
M & L for preparation of old painted steel surfaces of AC Plant including scraping, cleaning and applying two coats of synthetic enamel paint of approved shade & colour over a coat of red oxide primer including marking and writing SM & MES No/ letters, other details etc. complete all as specified and directed
Pumping down the existing refrigerant from the plant of 150/160 TR capacity, carrying out the leakage testing of plant with the pressure of Nitrogen gas and monitoring for 24hrs to assess leakages, rectification of leakage by brazing & replacement of necessary gaskets wherever required, vacumizing of the plant by vaccum pump and keep-it upto 24 hours for testing and rectification of leakages if any, finally recharging of existing refrigerant gas to the plant and topping up of refrigerant if required to maintain the standard pressure etc complete including testing of the plant for smooth functioning complete all as specified & directed.
Pumping down the existing refrigerant from the plant of upto 80/76 TR capacity, carrying out the leakage testing of plant with the pressure of Nitrogen gas and monitoring for 24hrs to assess leakages, rectification of leakage by brazing & replacement of necessary gaskets wherever required, vacumizing of the plant by vaccum pump and keep-it upto 24 hours for testing and rectification of leakages if any, finally recharging of existing refrigerant gas to the plant and topping up of refrigerant if required to maintain the standard pressure etc complete including testing of the plant for smooth functioning complete all as specified & directed.
Pumping down the existing refrigerant from the plant of 60/42 TR capacity, carrying out the leakage testing of plant with the pressure of Nitrogen gas and monitoring for 24hrs to assess leakages, rectification of leakage by brazing & replacement of necessary gaskets wherever required, vacumizing of the plant by vaccum pump and keep-it upto 24 hours for testing and rectification of leakages if any, finally recharging of existing refrigerant gas to the plant and topping up of refrigerant if required to maintain the standard pressure etc complete including testing of the plant for smooth functioning complete all as specified & directed.
Pumping down the existing refrigerant from the plant of 30/40 TR capacity, carrying out the leakage testing of plant with the pressure of Nitrogen gas and monitoring for 24hrs to assess leakages, rectification of leakage by brazing & replacement of necessary gaskets wherever required, vacumizing of the plant by vaccum pump and keep-it upto 24 hours for testing and rectification of leakages if any, finally recharging of existing refrigerant gas to the plant and topping up of refrigerant if required to maintain the standard pressure etc complete including testing of the plant for smooth functioning complete all as specified & directed. Notes : (i) Refrigerant required for topping up will be measured and paid seperately as supply only under relevant item.
S & F in replacement loader / Unloader coil 230 Volt, 50HZ for solenoid valve suitable for compressor SMC 6-65 / 8- 65 Model, Make : ACCEL
-Ditto- all as per item No. 53 above but for SMC 8-100, Make ACCEL.
Taking down existing unserviceable Shaft Seal assembly and in lieu S & F new Shaft Seal Assembly of Make ACCEL including tear gasket, nuts, bolts, washers etc. and testing for leakage of refrigerant suitable for 75/80 TR Capacity chiller unit, Make -ACCEL, complete all as specified and directed.
-ditto- all as per item No. 55 hereinabove but Shaft seal Assembly of Make -ACCEL for 30/40 TR capacity chiller unit
-ditto- all as per item No. 54 hereinabove but shaft seal Assembly of Make -ACCEL for 15/21/18 TR Capacity chillar unit of Make ACCEL.
S & F in replacement unserviceable worn out 'V' belt of model B-107 of make Fenner or equivalent in Nirlon/Dunlop as approved by the GE for Compressor/ AHU etc. complete all as specified and directed. SSK WED
S & F in replacement unserviceable worn out 'V' belt of model C-114 of make Fenner or equivalent in Nirlon/Dunlop as approved by the GE for Compressor/ AHU etc. complete all as specified and directed. TS Mahul 160 TR
S & F in replacement unserviceable worn out 'V' belt of model C-130 of make Fenner or equivalent in Nirlon/Dunlop as approved by the GE for Compressor/ AHU etc. complete all as specified and directed. Sonobouy
S & F in replacement contactor type ML- 2, 415Volt, 50Hzfor star delta starter for motor of compressor, water pump and chiller pump etc. complete all as specified and directed. Make L & T/ Marline - Garline/ SIEMENS/Schneider
S & F in replacement contactor type ML- 3, 415Volt, 50Hz for star delta starter for motor of compressor, water pump and chiller pump etc. complete all as specified and directed. Make L & T/ Marline - Garline/ SIEMENS/Schneider
S & F in replacement contactor for type ML- 6, 415Volt, 50Hz for star delta starter for motor of compressor, water pump and chiller pump etc. complete all as specified and directed. Make L & T/ Marline - Garline/ SIEMENS/Schneider
Supply only PVC fills of size 600mm x 300mm x 150mm complete all as specified and directed.
Supply only PVC fills of size 600mm x 150mm x 150mm complete all as specified and directed.
M & L for replacement of relay for 100 HP Starter installed in Panel Board of AC Plant Installation, complete all as specified and directed, Make : L & T / SIEMENS.
M & L for replacement of relay for 40 HP Starter installed in Panel Board of AC Plant Installation, complete all as specified and directed, Make L&T / Siemens.
M & L for replacement of relay for 20/25 HP Starter installed in Panel Board of AC Plant Installation, complete all as specified and directed, Make L&T / Siemens.
M & L for replacement of relay for 10 HP Starter installed in Panel Board of AC Plant Installation, complete all as specified and directed, Make L&T / Siemens.
M & L for replacement of relay for 7.5/5 HP Starter installed in Panel Board of AC Plant Installation, complete all as specified and directed, Make L&T / Siemens.
M & L for replacement of relay for 3 HP Starter installed in Panel Board of AC Plant Installation, complete all as specified and directed, Make L&T / Siemens.
M & L for replacement of Timer 800 SD installed in Panel Board of AC Plant Installation, complete all as specified and directed, Make L&T or Siemens
M & L for replacement of Indicator lamp RBY, 230 V, installed in Panel Board of AC Plant Installation, complete all as specified and directed, Make L&T / Siemens/C&S.
Dismantling the existing 30/60 TR capacity condenser from top of the existing unit, disconnecting the inlet and outlet connections of gas & water, transporting the same to the workshop, opening both flanges, boring, taking out complete existing 95 Nos damaged/choked finned copper tubes each of 1.94 metre long & of size 1/2" dia, replacing all the 95 Nos tubes with new finned copper tube of size 1/2" dia & each of 1.94 metre long, pressure testing at workshop, transporting the repaired condensor to the site,reinstalling at site on the top of existing unit, connecting the inlet & outlet connections, welding,boring etc, pressure testing with nitrogen, vaccumizing, gas charging, testing on load for smooth functioning, complete in all respects, all as specified and directed. Note: Supply only refrigerent for topping-up shall only be paid for separately to the extent required and ordered.
S & F in repairs pressure gauges HP/LP/OP of following capacities etc. complete with all accessories, as specified and directed, Make : PENN / INDOFOSS / RANCO / DANFOSS / JOHNSON
0 to 16kg./cm2
S & F in repairs for expansion valve suitable for AC plant of 80TR chillar unit, Make ACCEL, complete all as specified and directed, Make: DANFOSS / SPORLAN / RANCO.
-ditto- all as per item No. 76 above but for AC 30/40 TR chillar unit, Make : ACCEL
-ditto- all as per item No. 76 above but for AC 15/21/18 TR chillar unit, Make ACCEL
Supply and fix in replacement single phase preventer, type SPPR Type SZ 5 (7 Wire), 380V suitable for existing panel board for AC Plant, complete all as specified and directed, (Make L&T / SIEMENS).
Supply and fix in replacement MVPD, 380/415V suitable for existing panel board for various AC Plant, complete all as specified and directed, (Make L&T / SIEMENS).
Supply and fix in replacement MCCB, FP, 415 V, fixed type of undermentioned capacity complete all as specified and directed : (Make : STANDARD/HAVELLS/INDO-ASIAN)
MCCB 250 Amp, FP, 415-V, breaking capacity 35 KA
MCCB 100 Amp, FP, 415-V, breaking capacity 25 KA
MCCB 63 Amp, FP, 415-V, breaking capacity 16 KA Note for item Nos 81.01 to 81.03: The quoted rates shall also be deemed to include for taking down of existing MCCB's from Panels after disconneting of cable and provision of new MCCB's, reconnecting of cables with and including provision of proper lugs and glands.
Replacement of unserviceable MS pipe, heavy grade of following sizes (condenser water tubing from the cooling tower area) including provision of all fittings, welding and connected works as required for smooth functioning of AC Plants, complete all as specified and directed, Make : TATA/JINDAL :-
150mm bore
100mm bore
80mm bore
65mm bore
50mm bore
Supply, Fabrication, Installation, Testing and Commissioning of ducting for supply/Return made out of GI steel metal 22 gauge, Zinc coated complete with all standard accessories, flanges, G I Hardware, Self Adhesive elastomeric foam gasket, support etc as per IS-655, complete all as specified and directed.
M&L for duct insulation (19 mm thick closed coil nitrile rubber class 'O') with factory laminated aluminium foil, as specified and including provision of the followings : (a) M&L for cleaning the duct surface (to be insulated) by scrapping carefully with wire brush etc to make the surface completely free of miss-scale, dirt, dust, grease and other foreign materials, taking special care so that all duct joints are sealed against any leakage. (b) M&L applying rubber based adhesive CPRX compound. (c) M&L for sealing of all longitudinal joints and circular overlaps with and including aluminium foil tape 50mm wide, to make the insulation leakproof. (d) M&L for securing the insulation with and inculding mechanically fastened nylon / steel straps of size 50mm wide at maximum intervals of 1.2 metre.
Suply and fix in repairs Cast Iron butterfly valve Class PN-16 including flange, nuts, bolts, rubber, gaskets etc suitable for 50mm bore pipe, complete all as specified and directed.
Suply and fix in repairs Cast Iron butterfly valve Class PN-16 including flange, nuts, bolts, rubber, gaskets etc suitable for 80mm bore pipe, complete all as specified and directed.
Suply and fix in repairs Cast Iron butterfly valve Class PN-16 including flange, nuts, bolts, rubber, gaskets etc suitable for 100mm bore pipe, complete all as specified and directed.
Suply and fix in repairs Cast Iron butterfly valve Class PN-16 including flange, nuts, bolts, rubber, gaskets etc suitable for 150mm bore pipe, complete all as specified and directed.
Suply and fix in repairs Cast Iron Non-return butterfly valve Class PN-16 including flange, nuts, bolts, rubber, gaskets etc suitable for 100mm bore pipe, complete all as specified and directed.
Suply and fix in repairs Cast Iron Non-return butterfly valve Class PN-16 including flange, nuts, bolts, rubber, gaskets etc suitable for 150mm bore pipe, complete all as specified and directed.
Suply and fix in repairs Cast Iron Non-return butterfly valve Class PN-16 including flange, nuts, bolts, rubber, gaskets etc suitable for 80mm bore pipe, complete all as specified and directed. NOTE: Make for items 84 to 90 : KRILOSKER/LEADER/KARTAR /ZOLOTO/AUDCO/SANT
Repair/installation upto 75 TR chiller after removing suction / discharge pipe line of gas / water transporting the chiller to workshop, opening both and flange of chiller, cleaning the shell side of chiller and copper tubes with fresh water, pressure testing with water, keeping chiller 24 hrs of pre testing, chocked copper tubes 3/4" 120 nos removed the existing chiller after brazing / welding closing the both end flange with new gasket after changing the nuts and bolts ,pressure testing carried out after changing the tubes, transporting the chiller to site complete with new nuts & bolts in orginal position connecting suction / discharge gas line by welding & brazing, vaccumising the system, pressure testing N2 gas if no leakage found, gas charging with required R22 Insulating the chiller nitrile rubber sheet can chiller body and suction / discharge gas pipeline in orginal position testing the system for smooth functioning all as specified & directed.
Supply and Fix Water Flow Switch with Sensor after removing old unservicable water flow switch Make Hony well or eqivalant complete all as specified and directed.
Supply and fixing AHU filter dryer core after removing old U/s filter dryer core, Make: DANFOSS
Supply, Fabrication, Installation, Testing and Commissioning of Aluminium cladding on ducting for supply/Return duct.
Excavation in trenches not exceeding 1.5 Mtr wide and not exc 1.5 Mtr depth for taking out pipe/laying of pipe and getting out in any type of soil.
Returning, Filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm. deep as in hard/dense soil .
Removing excavated material not exc 50 Mtr and depositing where directed at a level not exc 1.5 Mtr above the starting point in soil including spreading in low lying area .
M&L for cutting existing road/hard standing not exc 45x60 cm in wide & depth getting out excavated material for laying water/ fire tubing returning filling & well rammaing watering finish suraface 10 cm from top including provision of PCC 1:3:6 for repairing, including removal of surplase soil all as directed
Taking up or down steel water tubing and connections including cleaning, cutting out damaged/wornout ends etc. complete all as specified and directed for the following bores.
Taking up or down MS pipes and connections including cleaning, cutting out damaged/wornout ends etc.complete all as specified and directed for the following bores.
Supply & Laying fixing, connecting and testing steel water tubing, medium grade, galvanised with screwed and socketed joints, in any length, including supply and fixing all fittings,and fixed to wall/ceiling or laid in trenches/floors and connections complete all as specified and directed for the following bores.
(i) 50 mm dia
(ii) 80 mm dia
(ii) 100 mm dia
Supply, lay / fix, connect and testing mild steel ERW Class "C" grade pipes, medium grade, in any length, including supply and fixing all MS fittings like bends, tees, tapers, reducers, flanges etc. ISI marked conforming to relevant IS and fixed to walls / ceiling or laid in trenches / floors, welding joints and applying two coats of synthetic enamel paint (of approved tint as per relevant IS) over a coat of red oxide zinc chrome primer complete all as specified and as directed by the Engineer-in-charge of the following bores:
(a) 100 mm dia (bore)
(b) 150 mm dia (bore)
(c) 200 mm dia (bore)
Material and labour for Plain cement concrete 1:4:8 type D-2 using 40 mm graded stone aggregate in foundation all as specified and as directed.
M &L for reneval of valve pit of size up to 80 cm x 80 cm x 80 cm (internal diamension), stone/brick construction including all necessary excavation and earth work in any type of soil,returning,filling in disposal of surplus soil to a distance not exceeding 50m and depositing where directed,PCC in foundation for mix(1:2:4) type D2 brick mansonary in cement mortar(1:4) rendering 12mm duck in cement mortar(1:4) internally ,finished even and fair and polishing flush externally as the work proceeds in the same mortor.Mild steel angle iron 40 x40 x6 mm frame MS sheet cover 3.15mm thick with handle and locking arrangement,painting all exposed MS work with two coats of synthetic enamel paint over a cost of red oxide primer and painting all the MS embeded in PCC with two coats of black bitumenous paint complete all as specified.
Refixing of serviceable pipe retrieved from item no. 1 including jointing/welding with required fittinge etc , complete all as specified and directed for the following bores.
Supply and fix 200mm sluice valve class PN1.6 as per IS-14846 and including taking out old unserviceable sluice valve complete all as per directed Make: Kirloskar/Kartar
Supply and fix 150mm sluice valve class PN1.6 as per IS-14846 and including taking out old unserviceable sluice valve complete all as per directed Make: Kirloskar/Kartar
Supply and fix 100mm sluice valve class PN1.6 as per IS-14846 and including taking out old unserviceable sluice valve complete all as per directed Make: Kirloskar/Kartar
Supply and fix fire hose cabinet made out of 18 gauge MS sheet but not less than 800 x 600 x 250mm with double door with 4mm thick glass and door frame made out of 16 gauge MS sheet painted with two coats of synthetic enamel paint of fire red color for external faces and brilliant white for inside faces over a coat of red oxide, including taking out old unserviceable hose box complete all as per directed. Swati/Cease Fire/Essel
Supply and fabricate MS flat clamps/ fire stand made out mild steel of size 40 x 6 mm(confirming to Fe 290 Gde-165 ), MS sheet, equal angle including drilling hole, nut, bolts, washer and made to shape of required size.
Supply and fix in replacement of unserviceable gun metal fire hydrant oblique type single outlet 63mm dia instantenous type 'A' conforming to IS: 5290, complete all as per directed Make:Swati/Cease Fire/Essel
S & F swinging type 36m long First Aid Hose Reel, conforming to IS:884 - 1969, having 19mm NB thermoplastic reinforced hose reel tubing, conforming to IS:12585 -1988, 25mm NB ball valve, stopcock, terminating with gunmetal coupling & nozzle of 6mm NB outlet with shut-off valve, conforming to IS:8090-1976 complete with MS socket for tap-off,red colour drum,brackets (including painting) for fixing on wall with anchor fastener, bolts, nuts, etc.complete as specified and directed by the engineer-in-charge. Make: Newage, AAAG, Minimax
S&F CP Hose 15 Meter length shall be non-percolating type conforming to IS 636, complete all as specified and as directed
M&L for scraping cleaning surface of fire hose cabinet of any type/size internal, and preparation of entire surface and applying two coat of Synthetic enamel paint ( Red Post Office colour outside and brilliant white colour inside) including writing, marking box Nos in stencil all as directed.
M&L for surface cleaning with wire brush, sand paper, removing dust dirt, washing with water, cleaning, drying surface and applying two coat of synthetic paint (Red Post Office) over a coat of red oxide all as directed.
(a) 200mm dia MS Pipe
(b) 150mm dia MS Pipe
(c) 100 mm dia MS Pipe
(d) 63 mm fire hydrants
Supply and fixing two way fire brigade inlet / colleting heads, ISI Marked, IS No. 904, design pressure upto 24 Kgs / Cm2 operating pressure 7 Kgs / Cm2 made in gunmetel body, with 63 mm dia gun metal, Instanteous inlet, NRV, flanged type suitable to be installed over 100mm dia fire pipe line complete in all respect and all as specified. Make : Newtech / New age /HD fire.
M&L for repair of damaged portion of MS pipe of 200mm size by cutting the pipe and welding both internally & externally and testing for leakage complete including removing material/scrap generated during the work, both internally & externally all as specified and as directed. Note:(a)Rate quoted includes deployment of skilled manpower like welder, fitter, and unskilled manpower. (b) Contractor should provide necessary arrangement for welding /cutting equipments at site and prior permission to be taken from Engr-in-charge before starting welding works. (c) Excavation and earthwork will be measured and paid separately.
All as per item No. 122 above but for MS Pipe of capacity 150mm size
All as per item No. 122 above but for MS Pipe of capacity 100mm size
shakti engineering and electrical works
cooltech engineering services
sapana enterprises
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .