Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹39,971
Closing Date
2 Nov 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Sub Div Engineer Civil
BSNL Civil Sub Division, Railway Mandi Hoshiarpur-146001
Construction of New DG Plinth adjoining to existing tilted DG plinth at BTS Tower site Thinda Chipra of SDCA Tanda under Hoshiarpur BA
2026_BSNL_295044_1
27/EE/BSNL/CD/JL/NIT/2026-27
Open Tender
Civil Works
Item Rate
30 days
Hoshiarpur
Please refer Tender documents.
10 documents required · 10 mandatory
₹177
Accounts officer (Cash), BSNL, Hoshiarpur
17 Oct 2026
17 Oct 2026
6 Nov 2026
17 Oct 2026
2 Nov 2026
17 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | |||||
| 1.01 | All kinds of soil | 4 | Cum | 10 | ₹40 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 4 | Cum | 10 | ₹40 |
| 3 | Supplying and filling in plinth with local sand under floors, including watering, ramming, consolidating and dressing complete. | 0.5 | Cum | 10 | ₹5 |
| 4Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | |||||
| 4.01 | 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 1 | Cum | 10 | ₹10 |
| 5Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : | |||||
| 5.01 | 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 0.5 | Cum | 10 | ₹5 |
| 6Centering and shuttering including strutting, propping etc. and removal of form for : | |||||
| 6.01 | Edges of slabs and breaks in floors and walls | - | - | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.10 MB
BOQ_343885.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .