Tender Value
₹2.2 Cr
EMD Value
₹2.6 L
Closing Date
13 Mar 2026, 2:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
OA/3
16 conditions · 4 needing a document upload
Financial Eligibility Criteria: Advance Correction Slip No. 1) Ref: 2022/ce- i/ct/gcc-2022/policy dated- 14.07.2022) A. Para 10.2., Part I of GCC shall be read as under: The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover under: Financial Eligibility Criteria: Advance Correction Slip No. 1) Ref: 2022/ce-i/ct/gcc-2022/policy dated- 14.07.2022) A. Para 10.2., Part I of GCC shall be read as under: The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover under: The tenderers shall submit requisite information as per Annexure-XIV (as per tender document & NIT), along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
Similar nature of work : Any Civil Engineering works
16 conditions · 4 needing a document upload
A . Documents to be uploaded only in the website by the Tenderer Following Annexures duly filled and signed are to be uploaded online only prior to Closing of Tender. Original copy of all the documents to be submitted to office within 7 days whenever demanded by the Railway. Annexures are available at Upload/View Document menu in Home Page of IREPS portal for works tender. 1. The details of the works completed by the tenderer during the last Seven years to be filled in Annexure-I. 2. The details of Plants and Machinery with the tenderer to be filled in Annexure- II. 3. Details of Personnel and Organization of the Tenderer to be filled in Annexure-III. 4. Details of Works presently on hand of the Tenderer to be filled in Annexure- IV. 5. The details regarding Association of Railway Officer s with the tenderer to be filled in Annexure- V. 6. List of the Arbitration cases of the Tenderer during last Five years to be filled in Annexure-VI. 7. List of the Court cases of the Tenderer during last Five years to be filled in Annexure- VII. 8. NEFT MANDATE FORM. All Payments to the agency including the refund of the Earnest Money of the unsuccessful bidder preferably will be remitted through NEFT. The Tenderer is required to submit Bank details and A/C No. etc. in Annexure-VIII. 9.Format for Certificate to be uploaded by Tenderer Along with the tender documents Annexure-IX and IX-A (As per GCC-2022 Annexure-V and V-A). 10. GST COMPLAINT INVOICE Annexure-X 11. LETTER OF CREDIT Annexure-XI, 12. Bid Capacity Declaration Annexure-XII.13. Bid Security declaration Annexure-XIII and 14. Annual Contractual Turnover Data Declaration Annexure-XIV (As per GCC-2022 Annexure-VI-B).
B . T h e tender offer complete in a l l respect and with all documents is t o b e submitted online by e-tendering process through the website www.ireps.gov.in before the closing time/date of this tender as mentioned in the NIT (Notice Inviting Tender). Tenderer can revise the bids any number of times till the closing time/date of the tender. No manual offers shall be accepted.
Demand for the Financial Criteria, Association of Railway Officers, List of Arbitration cases, Court cases and Mandate for NEFT are to be uploaded with a scanned copy duly filled in and signed as per annexure no. IV, V, VI, VII, VIII respectively. These Annexures are available in View Document menu at Home page and is downloadable. The details of the uploaded documents should be produced whenever demanded for verification on written request at any point of time of the tender and contract within 7 days.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Providing RDSO standard height gauge in lieu of not old type height gauge at LC No.2, 2/A, 3.....=27 nos. under the section of SSE/W/NDAE under AEN/NDAE
282_2025-26
282_2025-26
Open
Works - General
8 Months
Howrah, West Bengal
₹0
₹2.6 L
13 Mar 2026
20 Feb 2026
27 Feb 2026
37 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 2,18,28,353.87 | ||
| — | 2490.00 | — | — | ||
| EARTH WORK // General // Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. // All kinds of soil | — | — | — | 3,97,777.5 | |
| — | 1660.00 | — | — | ||
| EARTH WORK // General // Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. // All kinds of soil | — | — | — | 1,89,439.2 | |
| — | 1330.00 | — | — | ||
| EARTH WORK // General // Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. | — | — | — | 2,34,612 | |
| — | 650.00 | — | — | ||
| EARTH WORK // General // Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. // All kinds of soil | — | — | — | 19,977.75 | |
| — | 90.00 | — | — | ||
| EARTH WORK // General // Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | — | — | — | 1,72,023.75 | |
| — | 450.00 | — | — | ||
| EARTH WORK // General // Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | — | — | — | 7,128 | |
| — | 110.00 | — | — | ||
| CONCRETE WORK // CEMENT CONCRETE (CAST IN SITU) // Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : // 1:1 1/2:3 (1 Cement: 1 1/2 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | — | — | — | 8,25,744.15 | |
| — | 85.00 | — | — | ||
| CONCRETE WORK // CEMENT CONCRETE (CAST IN SITU) // Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : // 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | — | — | — | 6,02,705.25 | |
| — | 996.00 | — | — | ||
| REINFORCEMENT CEMENT CONCRETE // FORM WORK // Centering and shuttering including strutting, propping etc. and removal of form for // Foundations, footings, bases of columns, etc. for mass concrete | — | — | — | 3,51,523.26 | |
| — | 332.00 | — | — | ||
| REINFORCEMENT CEMENT CONCRETE // FORM WORK // Centering and shuttering including strutting, propping etc. and removal of form for // Columns, Pillars, Piers, Abutments, Posts and Struts | — | — | — | 2,87,236.44 | |
| — | 31400.00 | — | — | ||
| REINFORCEMENT CEMENT CONCRETE // STEEL REINFORCEMENT // Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. // Thermo-Mechanically Treated bars of grade Fe-500D or more. | — | — | — | 30,47,841 | |
| — | 400.00 | — | — | ||
| REINFORCEMENT CEMENT CONCRETE // DESIGN MIX CONCRETE // Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.: // All works upto plinth level // Concrete of M25 grade with minimum cement content of 330 kg /cum | — | — | — | 34,21,710 | |
| — | 24.00 | — | — | ||
| REINFORCEMENT CEMENT CONCRETE // DESIGN MIX CONCRETE // Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.: // All works above plinth level upto floor V level // Concrete of M25 grade with minimum cement content of 330 kg /cum | — | — | — | 2,12,984.64 | |
| — | 96110.25 | — | — | ||
| STEEL WORK // General // Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | — | — | — | 1,15,64,946.38 | |
| — | 2070.00 | — | — | ||
| FINISHING // EXTERIOR FINISHING // Applying priming coat: // With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel work (second coat) | — | — | — | 67,254.3 | |
| — | 2070.00 | — | — | ||
| FINISHING // EXTERIOR FINISHING // Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : // Two or more coats on new work | — | — | — | 2,90,441.7 | |
| — | 740.00 | — | — | ||
| STEEL WORK // General // Providing and fixing mild steel round holding down bolts with nuts and washer plates complete. | — | — | — | 64,735.2 | |
| — | 490.00 | — | — | ||
| STEEL WORK // General // Providing and fixing bolts including nuts and washers complete. | — | — | — | 70,273.35 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
specialcondition-water.pdf
ATTACHMENT
GCCACS14.07.2022-compressed.pdf
ATTACHMENT
CheckList_3.pdf
ATTACHMENT
JPOSTCables_1.pdf
ATTACHMENT
Annexure-X2.pdf
ATTACHMENT
NewAnnexure-IX-merged.pdf
ATTACHMENT
Annexure-XII_.pdf
ATTACHMENT
ColouredFinal_GCC_April-22_pdf_27.04.22_1.pdf
ATTACHMENT
LetterregardingrecommendedlistofBrands_makeofmaterialsdated03.09.2025.pdf
ATTACHMENT
Updatedtenderdocument_151.pdf
ATTACHMENT
Annexure-XI_11_2.pdf
ATTACHMENT
Annexure-XIV_1.pdf
ATTACHMENT
Annexure-IIIIII_3.pdf
ATTACHMENT
Annexure-IVVVIVIIVIII_2.pdf
ATTACHMENT
Annexure-XIII_1.pdf
ATTACHMENT
2ndcorrectionslip.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .