Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹67,850.70Accepted-AOC | L1 | Accepted-AOC L1 Acceted | |
| 2 | L2₹83,267.51+₹15,416.81 (22.7%)Rejected-Finance | L2 | Rejected-Finance L2 Rejected |
| Sl No | Description | Qty | Unit | MARIA ASTIN L1 | M. SIRANJEEVI L2 |
|---|---|---|---|---|---|
| 1.00Renovation of school Toilet at Ariyanipatti PUMS in Ariyanipatti Panchayat | |||||
| 2.00 | Paving the floor with pre-polished concrete anti-skid step tiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three crushed stone M.Sand) 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by Executive Engineer before use on works) | 17.4 | Sqm | 1,207 ₹21,001.8 Lowest | 1,475 ₹25,665 |
| 3.00 | Dadooing walls with following best approved quality, white / colour glazed tiles of following sizes set in Cement Mortar 1:2 (One Cement and Two crushed stone M.Sand) 10mm thick and pointing the joints with white cement mixed with colouring pigments at the rate of 0.40 Kg. / sq.m. neatly in all floors, curing, etc. | 8.73 | Sqm | 1,227 ₹10,711.71 Lowest | 1,498 ₹13,077.54 |
| 4.00 | pointing with Cement Mortor 1:3 Mix to full depth of tiiles including cost and conveyance of all materials to wrok site including all labour charges etc, complete | 9 | Sqm | 266 ₹2,394 Lowest | 325 ₹2,925 |
| 5.00 | White washing two coats using shell lime including cost and conveyance and all labour charges etc | 5.4 | Sqm | 32 ₹172.8 Lowest | 40 ₹216 |
| 6.00 | Distembering two coats over one coat of Primary Coat including cleaning preparing the surface including cost and conveyance and all labour charges etc | 21.96 | Sqm | 215 ₹4,721.4 Lowest | 265 ₹5,819.4 |
| 7.00 | Exterior Emulsion over one coat of Primary Coat including Cleaning, preparing the Surface including cost and conveyance and all labour charges etc | 69.54 | Sqm | 215 ₹14,951.1 Lowest | 265 ₹18,428.1 |
| 8.00 | Painting two coats using Enamel Paint for old Iron Work including cost and conveyance and all labour charges etc | 6.03 | Sqm | 126 ₹759.78 Lowest | 155 ₹934.65 |
| 9.00 | Cost and Supply of New Steel Door including cost and conveyance and all labour charges etc | 1 | No | 2,788 ₹2,788 Lowest | 3,500 ₹3,500 |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 1 & 9 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | Nos | 10,350.11 ₹10,350.11 Lowest | 12,701.82 ₹12,701.82 |
Tender Value
₹85,000
Closing Date
20 Feb 2026, 3:00 pmClosed
BDO(B.Pt)
Panchayat union Gandavakottai
Renovation of school Toilet at Ariyanipatti PUMS in Ariyanipatti Panchayat
2026_RDTN_657805_1
A2/291/2026- phase II -10
Open Tender
Civil Works - Buildings
Works
Panchayat Union Gandarvakottai
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
3 Mar 2026
14 Feb 2026
20 Feb 2026
14 Feb 2026
20 Feb 2026
14 Feb 2026
Renovation of school Toilet at Ariyanipatti PUMS in Ariyanipatti Panchayat
Paving the floor with pre-polished concrete anti-skid step tiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three crushed stone M.Sand) 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by Executive Engineer before use on works)
Dadooing walls with following best approved quality, white / colour glazed tiles of following sizes set in Cement Mortar 1:2 (One Cement and Two crushed stone M.Sand) 10mm thick and pointing the joints with white cement mixed with colouring pigments at the rate of 0.40 Kg. / sq.m. neatly in all floors, curing, etc.
pointing with Cement Mortor 1:3 Mix to full depth of tiiles including cost and conveyance of all materials to wrok site including all labour charges etc, complete
White washing two coats using shell lime including cost and conveyance and all labour charges etc
Distembering two coats over one coat of Primary Coat including cleaning preparing the surface including cost and conveyance and all labour charges etc
Exterior Emulsion over one coat of Primary Coat including Cleaning, preparing the Surface including cost and conveyance and all labour charges etc
Painting two coats using Enamel Paint for old Iron Work including cost and conveyance and all labour charges etc
Cost and Supply of New Steel Door including cost and conveyance and all labour charges etc
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 1 & 9 of Section 2 of Instruction to Bidders (ITB) of SBD)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.76 MB
Gkt-Doc.pdf
Tender Documents • 0.17 MB
BOQ_789053.xls
BOQ • 0.50 MB
Dateextend.pdf
PDF • 0.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .