Loading…
Loading…
| # | Company | Offered Item | Amount | Rank |
|---|---|---|---|---|
| 1 | L1₹15.1 L M/R to GPRA and A.G. Pool Colony at Summer Hill, Shimla during 2026-27. (SH: For the development & improvement of residential buildings Block-7 with the provision of paver blocks, wall tiles for outer wall (Below window sill) of the buildings, chequerred tiles, repairs of the building, water storage tanks and provision of drainage along the path towards existing manhole for proper channelization of run-off water at Block-7). | M/R to GPRA and A.G. Pool Colony at Summer Hill, Shimla during 2026-27. (SH: For the development & improvement of residential buildings Block-7 with the provision of paver blocks, wall tiles for outer wall (Below window sill) of the buildings, chequerred tiles, repairs of the building, water storage tanks and provision of drainage along the path towards existing manhole for proper channelization of run-off water at Block-7). | L1 | |
| 2 | L2₹15.3 L+₹13,525 (0.89%) M/R to GPRA and A.G. Pool Colony at Summer Hill, Shimla during 2026-27. (SH: For the development & improvement of residential buildings Block-7 with the provision of paver blocks, wall tiles for outer wall (Below window sill) of the buildings, chequerred tiles, repairs of the building, water storage tanks and provision of drainage along the path towards existing manhole for proper channelization of run-off water at Block-7). | M/R to GPRA and A.G. Pool Colony at Summer Hill, Shimla during 2026-27. (SH: For the development & improvement of residential buildings Block-7 with the provision of paver blocks, wall tiles for outer wall (Below window sill) of the buildings, chequerred tiles, repairs of the building, water storage tanks and provision of drainage along the path towards existing manhole for proper channelization of run-off water at Block-7). | L2 | |
| 3 | L3₹16.0 L+₹88,360 (5.84%) M/R to GPRA and A.G. Pool Colony at Summer Hill, Shimla during 2026-27. (SH: For the development & improvement of residential buildings Block-7 with the provision of paver blocks, wall tiles for outer wall (Below window sill) of the buildings, chequerred tiles, repairs of the building, water storage tanks and provision of drainage along the path towards existing manhole for proper channelization of run-off water at Block-7). | M/R to GPRA and A.G. Pool Colony at Summer Hill, Shimla during 2026-27. (SH: For the development & improvement of residential buildings Block-7 with the provision of paver blocks, wall tiles for outer wall (Below window sill) of the buildings, chequerred tiles, repairs of the building, water storage tanks and provision of drainage along the path towards existing manhole for proper channelization of run-off water at Block-7). | L3 |
| Sl No | Description | Qty | Unit | AMIT SHARMA SHUBASH NAGAR L3 | Kumer Singh L1 | Yash Pal Singh L2 |
|---|---|---|---|---|---|---|
| 1 | Civil Work | - | - | -11.25 ₹16,00,394 | -16.15 ₹15,12,034 Lowest | -15.4 ₹15,25,559 |
Tender Value
₹18.0 L
EMD Value
₹36,065
Closing Date
22 Sept 2026, 3:00 pmClosed
AE-C-4
EE, Shimla Division-1, CPWD Kennedy Cottage, Shimla
M/R to GPRA and A.G. Pool Colony at Summer Hill, Shimla during 2026-27. (SH: For the development & improvement of residential buildings Block-7 with the provision of paver blocks, wall tiles for outer wall (Below window sill) of the buildings, chequerred tiles, repairs of the building, water storage tanks and provision of drainage along the path towards existing manhole for proper channelization of run-off water at Block-7).
169013
114/2026-27/EE-1/AE-1/Shimla
OPEN
Maintenance
NCB
60 days
Shimla, Himachal Pradesh
10 documents required · 10 mandatory
₹36,065
Not Applicable
22 Sept 2026
15 Sept 2026
22 Sept 2026
22 Sept 2026
21 Sept 2026
stage.html
html • 0.08 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Index.pdf
document • 1.09 MB
Notice+Inviting+Tender.pdf
document • 1.62 MB
Performa+for+Quoting+the+rates.pdf
document • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .