| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-AOC | ₹1.0 Cr Quoted ₹1.2 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹1.2 Cr+₹1,042.31 (<0.01%)Rejected-Finance | ₹1.2 Cr+₹1,042.31 (<0.01%) | L2 | Rejected-Finance Above Estimate Rate |
Tender Value
₹1.0 Cr
EMD Value
₹1.1 L
Closing Date
19 May 2023, 3:00 pmClosed
Project Director
Project Director, DRDA SIVAGANGAI
Strengthening of Nariyangudi Road
2023_RDTN_310294_1
MGSMT SVG DT KLL_Pack_104
Open Tender
Civil Works - Roads
Item Rate
180 days
DRDA SIVAGANGAI
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹1.1 L
12 Jul 2023
5 May 2023
19 May 2023
5 May 2023
19 May 2023
5 May 2023
Amount
STRENGTHENING OF NARIYANGUDI ROAD (R-68)
Clearing the scrub Jungle including removing from the site, disposal by burying or burning etc., complete as directed by the departmental officers
Earthwork excavation and depositing on bank with initial lead of 10 m and lift of 2.0 m in hard gravel soil including cost and conveyance of all labour charges etc., complete as per SS 20 A
Picking the Existing Worn out BT Surface including all charges etc., complete.
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per 10.00 square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.
BC 30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Provision for Hectametre stone of size 0.75mx0.23mx0.10m
Provision for Kilometre stone of size 1.65mx0.45mx0.15m
Road Marking
Provision for Cautionary 60cm Equilateral Triangular Sign Boards
Provision for Mandatory 60cm Circular Sign Boards
Maintenance of the road
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
PRETHIVI & CO
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .