Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 CrAdmitted-Finance H NO 37 NEELKANTH ENCLAVE NEAR VATIKA CHOWK BADSHAHPUR GURUGRAM | GURUGRAM | GURUGRAM | HARYANA | L1 | Admitted-Finance | |
| 2 | L2₹2.4 Cr+₹5.0 L (2.14%)Admitted-Finance 1804 SECTOR 2 HUDA 124001 | ROHTAK | HARYANA | 124001 | L2 | Admitted-Finance | |
| 3 | L3₹2.5 Cr+₹17.9 L (7.72%)Admitted-Finance HOUSE NO 1531 1 BASEMENT SECTOR 45 GURUGRAM 122001 | GURUGRAM | GURUGRAM | HARYANA | 122001 | L3 | Admitted-Finance | |
| 4 | L4₹2.6 Cr+₹23.0 L (9.91%)Admitted-Finance BHIMWANI LOHARA RD HARYANA | L4 | Admitted-Finance | |
| 5 | L5₹2.7 Cr+₹34.1 L (14.7%)Admitted-Finance R O VPO DIGHAL TEHSIL AND DISTT JHAJJAR | DIGHAL | JHAJJAR | HARYANA | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S SHREE BALAJI BUILDERS L7 | Jaiveer Singh Contractor L6 | Narender Singh Contractor L2 | Rambir Singh contractor L4 | M/s Brahma Construction L3 | green concrete construction L1 | Rakshit Contractor L5 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Supply, Erection,testing and commissioning of Puffin 18W White Round Bright LED Panel Light Ceiling Downlight Lamp Kit with LED Driver Surface Mount LED Ceiling Light (Pack of 1)(2 Year Warranty Make:-Philips,Bajaj,GE,Wipro,K-lite,crompton greaves | 15 | Each | 620 ₹9,300 | 100 ₹1,500 | 500 ₹30 Lowest | 640 ₹9,600 | 559 ₹8,385 | 100 ₹1,500 | 100 ₹1,500 |
| 2.00 | Providing and fixing Concertina coil 0.75mm expension of case 7m/coil with high tensile spring steel size 2.50mm dia including M.S angle nut and bolt and carriage ,loading and uploading in all respect | 165 | Metre | 65 ₹10,725 | 100 ₹16,500 | 250 ₹330 Lowest | 150 ₹24,750 | 241 ₹39,765 | 100 ₹16,500 | 100 ₹16,500 |
| 3.00 | Providing and fixing Self Priming Monoblock Pump 1 HP make Crompton set complete work given Head 6-45 meters, Discharge 57-13 LPM. complete in all respect as per satisfaction of engineer in charge.. | 1 | Each | 10,000 ₹10,000 | 100 ₹100 | 7,000 ₹2 Lowest | 7,700 ₹7,700 | 6,000 ₹6,000 | 5,000 ₹5,000 | 100 ₹100 |
| 4.00 | Provision for electric connection from D.H.B.V.N (as per Govt.. Instruction).. | 1 | Each | 4,00,000 ₹4,00,000 | 3,00,000 ₹3,00,000 | 5,09,000 ₹5 Lowest | 5,00,000 ₹5,00,000 | 4,10,674 ₹4,10,674 | 1,00,000 ₹1,00,000 | 2,90,000 ₹2,90,000 |
| 5.00 | Provision for Water Connection complete in all respects as per directions of Engineer-in-charge.... | 1 | Each | 5,000 ₹5,000 | 50,000 ₹50,000 | 25,000 ₹500 Lowest | 45,000 ₹45,000 | 20,000 ₹20,000 | 1,00,000 ₹1,00,000 | 50,000 ₹50,000 |
Tender Value
₹3.1 Cr
EMD Value
₹6.2 L
Closing Date
2 Jun 2026, 12:00 pmClosed
PARVEEN KUMAR
Municipal Corporation Gurugram
CONSTRUCTION OF BOOSTING STATION, UNDER GROUND TANK, PUMP HOUSE and PUMPING MACHINERY, ELECTRIFICATION WORKS, CIVIL WORKS IN SECTOR 40, WARD NO. 13, ZONE NO. 3, DEVISION NO. 3A, GURUGRAM, UNDER MCG AREA
2026_HRY_522480_1
2026EC835036 F4DA 4D4B BEBA C4D9C315C8AD285ULB
Open Tender
Civil Works
Works
400 days
Gurugram
2 documents required · 2 mandatory
₹15,000
₹6.2 L
Yes
7 Oct 2026
19 May 2026
2 Jun 2026
19 May 2026
2 Jun 2026
19 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply, Erection,testing and commissioning of Puffin 18W White Round Bright LED Panel Light Ceiling Downlight Lamp Kit with LED Driver Surface Mount LED Ceiling Light (Pack of 1)(2 Year Warranty Make:-Philips,Bajaj,GE,Wipro,K-lite,crompton greaves | 15 | Each | - | - |
| 2 | Providing and fixing Concertina coil 0.75mm expension of case 7m/coil with high tensile spring steel size 2.50mm dia including M.S angle nut and bolt and carriage ,loading and uploading in all respect | 165 | Metre | - | - |
| 3 | Providing and fixing Self Priming Monoblock Pump 1 HP make Crompton set complete work given Head 6-45 meters, Discharge 57-13 LPM. complete in all respect as per satisfaction of engineer in charge.. | 1 | Each | - | - |
| 4 | Provision for electric connection from D.H.B.V.N (as per Govt.. Instruction).. | 1 | Each | - | - |
| 5 | Provision for Water Connection complete in all respects as per directions of Engineer-in-charge.... | 1 | Each | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.76 MB
BOQ_601404.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .