| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 LAccepted-AOC JAITPUR JAYANT SINGRAULI PIN 486890 | JAYANT | SINGRAULI | MADHYA PRADESH | 486890 | ₹4.0 L Quoted ₹3.4 L | L1 | Accepted-AOC Accepted on L1 basis |
| Sl No | Description | Qty | Unit | M/s Bright Engineering L1 |
|---|---|---|---|---|
| 1.00Repairing of EOT Crane of 24/96 Saraswati Dragline at Jayant Project. | ||||
| 1.01 | Total labour charges for repairing of EOT crane of 24/96 Saraswati dragline including repairing of EI. Th. Brake assembly as per scope of work in NIT by engaging 3 nos fitter 01 no welder 04 nos semi-skilled helper in two shifts for 10 days considering labour cost, profit and any other Cost. | 1 | Job | 45,300 ₹45,300 |
| 1.02 | Cost of hoist brake liners | 6 | Nos. | 3,700 ₹22,200 |
| 1.03 | Cost of travel brake liners | 12 | Nos. | 2,900 ₹34,800 |
| 1.04 | Cost of C.T Brake liner | 6 | Nos. | 2,950 ₹17,700 |
| 1.05 | Cost of aluminium rivet | 80 | Nos. | 12 ₹960 |
| 1.06 | Cost of brake tripping assembly | 1 | Set | 16,900 ₹16,900 |
| 1.07 | Cost of Off relay ,0.5 to 60 sec, 110V AC | 2 | Nos. | 5,700 ₹11,400 |
| 1.08 | Cost of 3 core PVC copper cable (2.5 sq. mm) | 80 | Meter | 151 ₹12,080 |
| 1.09 | Cost of 3 core PVC copper cable (4 sq. mm) | 80 | Meter | 240 ₹19,200 |
Updated dates
Tender Value
₹4.2 L
EMD Value
₹5,300
Closing Date
13 Feb 2026, 11:00 amClosed
GM(Excv), Jayant Project
GM office, Jayant project, Singrauli, M.P-486890
Repairing of EOT Crane of 24/96 Saraswati Dragline at Jayant Project.
2026_NCL_352058_1
JNT/GM(Excv)/E-tender/25-26/57
Open Tender
Excavation Department Work
12 days
Jayant Project
As per NIT
3 documents required · 3 mandatory
₹5,300
21 Mar 2026
30 Jan 2026
14 Feb 2026
30 Jan 2026
13 Feb 2026
31 Jan 2026
30 Jan 2026 - 2 Feb 2026
Repairing of EOT Crane of 24/96 Saraswati Dragline at Jayant Project.
Total labour charges for repairing of EOT crane of 24/96 Saraswati dragline including repairing of EI. Th. Brake assembly as per scope of work in NIT by engaging 3 nos fitter 01 no welder 04 nos semi-skilled helper in two shifts for 10 days considering labour cost, profit and any other Cost.
Cost of hoist brake liners
Cost of travel brake liners
Cost of C.T Brake liner
Cost of aluminium rivet
Cost of brake tripping assembly
Cost of Off relay ,0.5 to 60 sec, 110V AC
Cost of 3 core PVC copper cable (2.5 sq. mm)
Cost of 3 core PVC copper cable (4 sq. mm)
Cost of 3 core PVC copper cable (6 sq. mm)
Cost of 14 core PVC copper cable
Cost of push button operator board
Cost of cable roller trolley
Total labour charge for repairing of rail path, trolley & allied structure of EOT crane as per scope of work in NIT by engaging 01 nos supervisor, 02 nos skilled manpower, 02 nos. semi skilled and 02 nos. semi skilled for 01 shift for 12 days considering labour cost, profit and any other Cost.
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.16 MB
BOQ_364851.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid