Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.3 LAccepted-AOC | 1 | Accepted-AOC Lowest Amount Quoted | |
| 2 | 2₹6.3 L+₹346.02 (0.06%)Rejected-Finance | 2 | Rejected-Finance Highest Amount Quoted | |
| 3 | 3₹6.3 L+₹2,851.76 (0.45%)Rejected-Finance | 3 | Rejected-Finance Highest Amount Quoted | |
| 4 | 4₹6.3 L+₹3,130.02 (0.50%)Rejected-Finance | 4 | Rejected-Finance Highest Amount Quoted | |
| 5 | 5₹6.3 L+₹5,111.27 (0.81%)Rejected-Finance | 5 | Rejected-Finance Highest Amount Quoted |
| Sl No | Description | Qty | Unit | adhiyaninfra L1 | SIVAMANGALAMUDAIYAR L3 | VENKAT PERUMAL SUBBIAH L4 | MR.K.PETCHIMUTHU, CONTRACTOR L2 | GNANAPRAKASH L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00Construction of Mens Toilet in Existing Chief Ministers Mini Stadium Melapalayam in Tirunelveli District | ||||||||
| 2.00 | Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. | 12.68 | Cum | 250 ₹3,170 Lowest | 263 ₹3,334.84 | 263.76 ₹3,344.48 | 258.7 ₹3,280.32 | 265 ₹3,360.2 |
| 3.00 | Cement Concrete 1:4:8 (One Cement, Four sand and Eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification. | 3.38 | Cum | 5,322 ₹17,988.36 | 5,328 ₹18,008.64 | 5,328.9 ₹18,011.68 | 4,776 ₹16,142.88 Lowest | 5,330 ₹18,015.4 |
| 4.00 | Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15 cm thick well rammed, watered and consolidated
etc. complete complying with standard specification. | 9.06 | Cum | 43.5 ₹394.11 Lowest | 45 ₹407.7 | 45.85 ₹415.4 | 44.78 ₹405.71 | 50 ₹453 |
| 5.00 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid) | 59.91 | Sqm | 1,040 ₹62,306.4 | 1,094 ₹65,541.54 | 1,095 ₹65,601.45 | 930.33 ₹55,736.07 Lowest | 1,100 ₹65,901 |
| 6.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 0.78 | MT | 87,386 ₹67,811.54 Lowest | 91,858 ₹71,281.81 | 91,858.5 ₹71,282.2 | 89,550 ₹69,490.8 | 92,000 ₹71,392 |
| 7.00 | Providing and laying in position ready mixed or site batched design mix cement concrete for M25 grade cement concrete work, using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana/ Ordinary Portland/ Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads, but excluding the cost of centering, shuttering and finishing as per direction of the engineer-in-charge. | 10.53 | cum | 8,801 ₹92,674.53 | 8,443 ₹88,904.79 | 8,443.22 ₹88,907.11 | 8,159 ₹85,914.27 Lowest | 8,450 ₹88,978.5 |
| 8.00 | Brick work in Cement Mortar 1:5 ( One cement, Five sand) using country bricks for foundation and basement including curing, etc., complete complying with standard specifiction. | 14.23 | Cum | 5,893 ₹83,857.39 | 6,057 ₹86,191.11 | 6,057.1 ₹86,192.53 | 5,870.5 ₹83,537.22 Lowest | 6,060 ₹86,233.8 |
| 9.00 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work | 19.88 | Sqm | 293 ₹5,824.84 Lowest | 320 ₹6,361.6 | 320.1 ₹6,363.59 | 298.5 ₹5,934.18 | 325 ₹6,461 |
| 10.00 | Plastering with Cement Mortar 1:5 (One cement and Five sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. | 132.71 | Sqm | 268 ₹35,566.28 Lowest | 282 ₹37,424.22 | 282.18 ₹37,448.11 | 278.6 ₹36,973.01 | 285 ₹37,822.35 |
Tender Value
₹6.7 L
EMD Value
₹6,690
Closing Date
28 Sept 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block Development Officer (B.Pt.)
Panchayat Union Office, Palayamkottai
Construction of Mens Toilet in Existing Chief Ministers Mini Stadium Melapalayam in Tirunelveli District
2026_RDTN_699080_2
A3/783/2026
Open Tender
Civil Works
Item Rate
270 days
Palayamkottai Block
Pre Qualification Details
4 documents required · 4 mandatory
₹0
₹6,690
Panchayat Union Office, Palayamkottai
29 Oct 2026
28 Aug 2026
29 Sept 2026
28 Aug 2026
28 Sept 2026
4 Sept 2026
3 Sept 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Construction of Mens Toilet in Existing Chief Ministers Mini Stadium Melapalayam in Tirunelveli District | - | - | - | - |
| 0.0 | Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. | 12.68 | Cum | - | - |
| 0.0 | Cement Concrete 1:4:8 (One Cement, Four sand and Eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification. | 3.38 | Cum | - | - |
| 0.0 | Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15 cm thick well rammed, watered and consolidated
etc. complete complying with standard specification. | 9.06 | Cum | - | - |
| 0.0 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid) | 59.91 | Sqm | - | - |
| 0.0 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 0.78 | MT | - | - |
| 0.0 | Providing and laying in position ready mixed or site batched design mix cement concrete for M25 grade cement concrete work, using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana/ Ordinary Portland/ Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads, but excluding the cost of centering, shuttering and finishing as per direction of the engineer-in-charge. | 10.53 | cum | - | - |
| 0.0 | Brick work in Cement Mortar 1:5 ( One cement, Five sand) using country bricks for foundation and basement including curing, etc., complete complying with standard specifiction. | 14.23 | Cum | - | - |
| 0.0 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work | 19.88 | Sqm | - | - |
| 0.0 | Plastering with Cement Mortar 1:5 (One cement and Five sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. | 132.71 | Sqm | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.62 MB
BOQ_840453.xls
BOQ • 0.36 MB
2SingleCoverMensToiletMelapalayam.pdf
Tender Documents • 0.60 MB
28092026TenderExtension.pdf
PDF • 0.13 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .