| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.3 CrAccepted-AOC C 114 SECTOR 9 NOIDA GAUTAM BUDH NAGAR UP PIN 201301 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | ₹1.3 Cr | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹1.4 Cr+₹15.6 L (12.3%)Rejected-Finance ALIGARH | ALIGARH | UTTAR PRADESH | 202001 | ₹1.4 Cr+₹15.6 L (12.3%) | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹1.5 Cr+₹23.6 L (18.7%)Rejected-Finance 1 234 8 | ALIGARH | UTTAR PRADESH | 202001 | ₹1.5 Cr+₹23.6 L (18.7%) | L-3 | Rejected-Finance L-3 |
Tender Value
₹1.5 Cr
EMD Value
₹3.0 L
Closing Date
7 Dec 2022, 12:00 pmClosed
SE Drainage circle Aligarh
SE Drainage circle Aligarh
S/E For Reconstruction of old damaged V.R.B. at Km. 4.760 , 7.150 , 9.729 , 12.161 , 14.344 , 19.110 , 21.915 , 28.663 and Km. 35.914 of Koil Dy and Repair work of 12 No. old damaged V.R.B. Of Koil Dy
2022_UPIDC_752973_4
09/SE/2022-23
Open Tender
Civil Works
Item Wise
60 days
SE DRAINAGE CIRCLE ALIGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹3.0 L
13 Feb 2023
25 Nov 2022
7 Dec 2022
25 Nov 2022
7 Dec 2022
25 Nov 2022
Amount
(PART-A) Earthwork in making and Removing bunds, ramps,Backfilling and making channel section U/S and D/S of V..R.B
Dismentling bricks or stone masonry in lime or cement including stacking of material within 60 metre.
Dismentling R.B. or R.C.C. work including stacking of material within 60 metre.
Laying of hume pipe NP -3 type 900 mm dia in position (Labour oly) including labour and T and P etc. required for completion of the work.
Earthwork in excavation of foundation in wet ordinary soil including lift up to 1.50 mtr. And lead up to 30.00 mtr.
C.C 1:3:6 in foundation and floor including cost of material, labour and T and P etc. complete.
Ist. Class brickwork in 1:4 C.M including all cost of material labour and T and P etc complete
Centering and shuttering of of R.C.C. work including all cost of material,labour and T and P etc. complete.
Steel reonforcement including bending , Binding , Cutting , Placing of reinforcement Material , Labour and T and P etc. complete.
R.C.C 1: 1.5 :3 in slab and abutment including all material , Labour and T and P etc. complete.
C. C 1:1.5:3 in wearing coat and floor including all material , Labour and T and P etc. complete.
Struck Deep cement pointing in 1:2 C.M. including all cost of material labour and T and P etc complete
Finishing walls with exterior emulsion paint (Apex) of approved brand and manufacture and of required shade and undacorated wall surface to give even shade over @ 1.25 Ltr/10sqm including one coat of primer appled @ 0.75Ltr/10sqm coat curing and cost of all material, labor, T and P etc. required for proper completion of work.
Supply and fixing of information board including writing , material ,Labour etc completion of work
(PART-B) Earthwork in making and Removing bunds, ramps,Backfilling and making channel section U/S and D/S of V..R.B
Dismentling bricks or stone masonry in lime or cement including stacking of material within 60 metre.
Dismentling R.B. or R.C.C. work including stacking of material within 60 metre.
C.C 1:3:6 in foundation and floor including cost of material, labour and T and P etc. complete.
Ist. Class brickwork in 1:4 C.M including all cost of material labour and T and P etc complete
Centering and shuttering of of R.C.C. work including all cost of material,labour and T and P etc. complete.
Steel reonforcement including bending , Binding , Cutting , Placing of reinforcement Material , Labour and T and P etc. complete.
R.C.C 1: 1.5 :3 in slab and abutment including all material , Labour and T and P etc. complete.
C. C 1:1.5:3 in wearing coat and floor including all material , Labour and T and P etc. complete.
Struck Deep cement pointing in 1:2 C.M. including all cost of material labour and T and P etc complete
12.5 mm thick cement plaster in 1:4 cement course sand including all cost of material , labour and T and P
Providing and laying 75 mm P.V.C. Pipe for Slab and Abutment
Finishing walls with exterior emulsion paint (Apex) of approved brand and manufacture and of required shade and undacorated wall surface to give even shade over @ 1.25 Ltr/10sqm including one coat of primer appled @ 0.75Ltr/10sqm coat curing and cost of all material, labor, T and P etc. required for proper completion of work.
Supply and fixing of information board including writing , material ,Labour etc completion of work
M/S SANJAY KUMAR
M/S Harish Kumar Contractor
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .