| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.5 LAccepted-AOC A 51 SHALIMAR GARDEN EX 2 SAHIBABAD DISTRICT GHAZIABAD UTTAR PRADESH | SAHIBABAD | GHAZIABAD | UTTAR PRADESH | ₹17.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹20.4 L+₹2.9 L (16.6%)Rejected-AOC | ₹20.4 L+₹2.9 L (16.6%) | L2 | Rejected-AOC L2 |
| 3 | L3₹21.5 L+₹4.0 L (22.8%)Rejected-AOC | ₹21.5 L+₹4.0 L (22.8%) | L3 | Rejected-AOC L3 |
| 4 | L4₹22.8 L+₹5.3 L (30.1%)Rejected-AOC | ₹22.8 L+₹5.3 L (30.1%) | L4 | Rejected-AOC L4 |
| Sl No | Description | Qty | Unit | ARTIST BRO L1 | S R CONTRACTORS L2 | M/S G R D CONTRACTOR AND SUPLIER L4 | BALAJI TRADERS L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Dismentaling Existing Cement plaster i/c disposal of refuse with in distance 60m. | 958 | Sqm | 25 ₹23,950 Lowest | 30 ₹28,740 | 27 ₹25,866 | 25.94 ₹24,850.52 |
| 2.00 | Dismentaling Door and window chaukhat with Hold fast i/c stacking material with 60m. | 74 | Sqm | 75 ₹5,550 | 50 ₹3,700 Lowest | 75 ₹5,550 | 71.06 ₹5,258.44 |
| 3.00 | Dismentaling Brick Work In cement mortar i/c stackng of material with 60m. | 4 | Cum | 621 ₹2,484 | 350 ₹1,400 Lowest | 621 ₹2,484 | 584.3 ₹2,337.2 |
| 4.00 | Dismentaling C.C. Flooring In cement mortar i/c stackng of material with 60m | 175 | Sqm | 34 ₹5,950 | 100 ₹17,500 | 34 ₹5,950 | 32.71 ₹5,724.25 Lowest |
| 5.00 | E/W in foundation in dry ordinary soil including lift upto1.5 meter and lead up to 30 m and including all cost of material labour and T&P etc.complete. . | 25 | Cum | 120 ₹3,000 | 70 ₹1,750 Lowest | 119 ₹2,975 | 112.8 ₹2,820 |
| 6.00 | Providing and laying C.C. 1:3:6 with cement, Coarse sand and stone grit (20-40 mm size) including cost of all material, labour and T&P etc.complete. | 5 | Cum | 5,600 ₹28,000 | 4,000 ₹20,000 Lowest | 5,871 ₹29,355 | 5,520.53 ₹27,602.65 |
| 7.00 | Brick work in Class-150 in 1:4 cement and coarse sand mortar including supply of all material Labour, T&P etc. | 9 | Cum | 5,000 ₹45,000 Lowest | 5,000 ₹45,000 Lowest | 5,538 ₹49,842 | 5,207.22 ₹46,864.98 |
| 8.00 | Brick work in Class-150 in 115mm Thick Wall in 1:4 cement and coarse sand mortar including cost of all material, labour and T&P etc.complete for proper completion of work. | 4 | Cum | 5,500 ₹22,000 | 5,200 ₹20,800 Lowest | 5,538 ₹22,152 | 5,207.22 ₹20,828.88 |
| 9.00 | Dry Brick work in Class 150 including supply of all material Labour, T&P etc. | 2 | Cum | 4,000 ₹8,000 | 3,000 ₹6,000 Lowest | 4,098.6 ₹8,197.2 | 3,852.68 ₹7,705.36 |
| 10.00 | Providing and laying D.P.C. 40 mm thick with cement concrete consisting of( 1:2:4) cement , Coarse sand and 10mm grade stone grit and including cost of all material, labour and T&P etc.complete for proper completion of work. | 8 | Sqm | 324 ₹2,592 | 300 ₹2,400 Lowest | 324.75 ₹2,598 | 305.27 ₹2,442.16 |
Tender Value
Refer Docs
EMD Value
₹46,000
Closing Date
23 May 2026, 12:00 pmClosed
EE UDAC Mathura
EE UDAC Mathura
LOT03
2026_UPIDC_1148964_3
02/Ee/2026-27
Open Tender
Civil Works
Piece-work
90 days
EE UDAC Mathura
Please refer Tender documents.
2 documents required · 2 mandatory
₹354
₹46,000
Yes
12 Aug 2026
18 May 2026
23 May 2026
18 May 2026
23 May 2026
18 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentaling Existing Cement plaster i/c disposal of refuse with in distance 60m. | 958 | Sqm | - | - |
| 2 | Dismentaling Door and window chaukhat with Hold fast i/c stacking material with 60m. | 74 | Sqm | - | - |
| 3 | Dismentaling Brick Work In cement mortar i/c stackng of material with 60m. | 4 | Cum | - | - |
| 4 | Dismentaling C.C. Flooring In cement mortar i/c stackng of material with 60m | 175 | Sqm | - | - |
| 5 | E/W in foundation in dry ordinary soil including lift upto1.5 meter and lead up to 30 m and including all cost of material labour and T&P etc.complete. . | 25 | Cum | - | - |
| 6 | Providing and laying C.C. 1:3:6 with cement, Coarse sand and stone grit (20-40 mm size) including cost of all material, labour and T&P etc.complete. | 5 | Cum | - | - |
| 7 | Brick work in Class-150 in 1:4 cement and coarse sand mortar including supply of all material Labour, T&P etc. | 9 | Cum | - | - |
| 8 | Brick work in Class-150 in 115mm Thick Wall in 1:4 cement and coarse sand mortar including cost of all material, labour and T&P etc.complete for proper completion of work. | 4 | Cum | - | - |
| 9 | Dry Brick work in Class 150 including supply of all material Labour, T&P etc. | 2 | Cum | - | - |
| 10 | Providing and laying D.P.C. 40 mm thick with cement concrete consisting of( 1:2:4) cement , Coarse sand and 10mm grade stone grit and including cost of all material, labour and T&P etc.complete for proper completion of work. | 8 | Sqm | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.89 MB
BOQ_2150770.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .