| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.4 LAccepted-AOC | ₹28.4 L Quoted ₹28.8 L | L1 | Accepted-AOC Being L1 |
| 2 | L2₹29.4 L+₹63,925 (2.22%)Rejected-AOC NO 9A VINAYAKANILAYA KANAKA GANAPATHI STREET OM SHAKTHI LAYOUT KANAKAGIRI HORAMAVU POST BANGALORE 560 043 | BENGALURU URBAN | KARNATAKA | 560043 | ₹29.4 L+₹63,925 (2.22%) | L2 | Rejected-AOC Not Being L1 |
| 3 | L3₹29.6 L+₹81,655 (2.84%)Rejected-AOC | ₹29.6 L+₹81,655 (2.84%) | L3 | Rejected-AOC Not Being L1 |
| 4 | L4₹31.2 L+₹2.4 L (8.30%)Rejected-AOC NO 631 2 1ST FLOOR HAL ROAD VIBHUTIPURA NEAR JAMIAL MOSQUE BANGALORE 560 017 | BENGALURU URBAN | KARNATAKA | 560017 | ₹31.2 L+₹2.4 L (8.30%) | L4 | Rejected-AOC Not Being L1 |
| 5 | L5₹31.5 L+₹2.8 L (9.61%)Rejected-AOC | ₹31.5 L+₹2.8 L (9.61%) | L5 | Rejected-AOC Not Being L1 |
| Sl No | Description | Qty | Unit | P Ramesh and Co L3 | PRACHANIVA CONSTRUCTIONS L2 | m/s raghavendra kulkarni L7 | ABHISHEK CONSTRUCTIONS L8 | MAJ CONSTRUCTIONS L5 | dhanalakshmi constructions L1 | Annapoorneshwari Construction L9 | M.Z.BUILDERS L4 | M/s SL CONSTRUCTION L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Taking down cement plaster of any description including racking out joints, hacking for key scrubbing down with water etcand removal of entire debris as ordered outside MD land complete all as directed. | 280 | Square Metre | 27 ₹7,560 | 35 ₹9,800 | 45 ₹12,600 | 40 ₹11,200 | 20 ₹5,600 Lowest | 35 ₹9,800 | 140 ₹39,200 | 40 ₹11,200 | 20 ₹5,600 Lowest |
| 2.00 | Demolition of cement concrete (un-reinforced) in ground floor and paving not exceeding 15 cm thick above or below ground level and removal of entire debris as ordered outside MD land complete all as directed. | 100 | Cubic Metre | 450 ₹45,000 | 450 ₹45,000 | 350 ₹35,000 | 250 ₹25,000 | 200 ₹20,000 Lowest | 250 ₹25,000 | 1,000 ₹1,00,000 | 400 ₹40,000 | 300 ₹30,000 |
| 3.00 | Demolition of kerb stone of any description and in any position not otherwise specifically provided for complete all as directed. | 15 | Cubic Metre | 360 ₹5,400 | 500 ₹7,500 | 500 ₹7,500 | 150 ₹2,250 Lowest | 200 ₹3,000 | 300 ₹4,500 | 1,500 ₹22,500 | 400 ₹6,000 | 300 ₹4,500 |
| 4.00 | Demolition of reinforced cement concrete in any description and in any location (reinforcement cut as required to facilitate demolition) including removing of debris to a distance not exc 50 m and depositing where directed. | 6 | Cubic Metre | 450 ₹2,700 | 600 ₹3,600 | 900 ₹5,400 | 250 ₹1,500 | 200 ₹1,200 Lowest | 350 ₹2,100 | 1,883 ₹11,298 | 400 ₹2,400 | 300 ₹1,800 |
| 5.00 | Demolition of brickwork , precast concrrete block walling or stone/boulder masonry, built in cement mortar including all quoins, arches, pillars, etcand removal of entire debris as ordered outside MD land complete all as directed. | 75 | Cubic Metre | 360 ₹27,000 | 480 ₹36,000 | 350 ₹26,250 | 250 ₹18,750 | 200 ₹15,000 Lowest | 250 ₹18,750 | 1,500 ₹1,12,500 | 400 ₹30,000 | 300 ₹22,500 |
| 6.00 | Demolition of stone slabs and tiles of any description or thickness in floors, platform, aprons etc., laid, bedded and pointed in any mortar complete all as specified & as directed. | 15 | Ten Square Metre | 500 ₹7,500 | 120 ₹1,800 Lowest | 550 ₹8,250 | 350 ₹5,250 | 200 ₹3,000 | 300 ₹4,500 | 550 ₹8,250 | 600 ₹9,000 | 1,000 ₹15,000 |
| 7.00 | M & L for Hard core of broken hard stone or boulders of guage not exceeding 63 mm , deposited spread as subbase to inter locking tiles in layers n.exc 15cm thick , watered & well rammed to true surface complete all as specified and directed. | 50 | Cubic Metre | 900 ₹45,000 Lowest | 1,300 ₹65,000 | 1,400 ₹70,000 | 1,500 ₹75,000 | 2,500 ₹1,25,000 | 1,600 ₹80,000 | 3,000 ₹1,50,000 | 1,600 ₹80,000 | 1,700 ₹85,000 |
| 8.00 | M & L for PCC 1 :4 : 8 type D2 using 40 mm graded crushed stone aggregate as in foundation filling mass concrete complete all as specified and directed | 20 | Cubic Metre | 3,600 ₹72,000 | 4,800 ₹96,000 | 4,500 ₹90,000 | 2,500 ₹50,000 Lowest | 5,000 ₹1,00,000 | 2,600 ₹52,000 | 4,000 ₹80,000 | 3,500 ₹70,000 | 3,900 ₹78,000 |
| 9.00 | M & L for plain cement concrete 1:3:6 type C1 using 20 mm graded stone aggregate as in surface channel of drains benching finished the top of benching even and smooth using extra cement including necessary form work complete all as specified and directed. | 8 | Cubic Metre | 5,400 ₹43,200 | 5,300 ₹42,400 | 7,500 ₹60,000 | 5,000 ₹40,000 | 5,000 ₹40,000 | 3,200 ₹25,600 Lowest | 6,500 ₹52,000 | 4,000 ₹32,000 | 6,000 ₹48,000 |
| 10.00 | M & L for Precast Reinforced cement concrete 1 : 2 : 4 type B1 using 20 mm aggregate stone aggregate as in cover slab to Man holes set and jointed in cement mortar 1 : 4 complete all as directed (Note : Reinforcement shall be measured and paid seperately.) | 8 | Cubic Metre | 9,000 ₹72,000 | 6,400 ₹51,200 Lowest | 9,000 ₹72,000 | 8,500 ₹68,000 | 6,500 ₹52,000 | 7,000 ₹56,000 | 6,500 ₹52,000 | 6,500 ₹52,000 | 8,000 ₹64,000 |
Tender Value
₹38 L
EMD Value
₹76,000
Closing Date
31 Jul 2025, 6:00 pmClosed
GE CENTRAL BANGALORE
ASC CENTRE AND COLLEGE AGRAM POST BANGALORE 560007
REPAIRS TO DRAIN HARD STANDING PATH AND PAVER BLOCKS AT OTM MD ACCN AT ASC SOUTH 2 ATC UNDER AGE B AND R II OF GE CENTRAL BANGALORE
2025_MES_720040_1
8509E
Open Tender
Civil Works - Others
Item Rate
270 days
GE CENTRAL BANGALORE
Please refer tender documents
6 documents required · 6 mandatory
₹500
GE CENTRAL BANGALORE
₹76,000
Yes
18 Oct 2025
12 Jul 2025
2 Aug 2025
12 Jul 2025
31 Jul 2025
25 Jul 2025
12 Jul 2025 - 24 Jul 2025
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .