| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC | ₹4.9 L | L1 | Accepted-AOC Accept |
| 2 | L2₹5.1 LRejected-Finance | ₹5.1 L | L2 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | SELLAMANI L1 | BALAJI CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00Construction of Passenger Bus Shelter to Cross Road in Ponniyanthal Panchayat | |||||
| 1.01 | Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay soil and hard gravel soil as per standard specification SS 20 B | 14.06 | cum | 224.5 ₹3,156.47 | 224.5 ₹3,156.47 |
| 1.02 | Supplying and filling in foundation, basement, etc with filling sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 3.45 | cum | 1,488.7 ₹5,136.02 | 1,488.7 ₹5,136.02 |
| 1.03 | Cement Concrete 1:4:8 (One Cement, Four sand and Eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification | 5.56 | cum | 4,785.44 ₹26,607.05 | 4,785.44 ₹26,607.05 |
| 1.04 | Reinforced Cement Concrete 1:1:5:3 mix using 20 mm metal for all items including cost & conveyance and labour charges etc complete. | 12.94 | sqm | 8,418.41 ₹1.1 L | 8,418.41 ₹1.1 L |
| 1.05 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification | 0.39 | sqm | 88,946.3 ₹34,244.33 | 88,946.3 ₹34,244.33 |
| 1.06 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. | 102.01 | cum | 900 ₹91,809 | 1,050 ₹1.1 L |
| 1.07 | Brick work in following Cement Mortar using best quality II class table moulded chamber burnt bricks of size 9" x 4-1/2" x 3" for foundation and basement including curing, etc., complete complying with standard specification. | 7.97 | cum | 5,723.41 ₹45,615.58 | 5,723.41 ₹45,615.58 |
| 1.08 | Plastering with Cement Mortar 1:3 , 10mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. | 63.95 | cum | 285.29 ₹18,244.30 | 285.29 ₹18,244.30 |
| 1.09 | Plastering with CM 1:5 mix using 12 mm thick including cost & conveyance and labour charges etc complete. | 45.1 | sqm | 247.81 ₹11,176.23 | 247.81 ₹11,176.23 |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
11 Mar 2024, 4:00 pmClosed
BDO THIRUKOILUR
BDO THIRUKOILUR
Construction of Passenger Bus Shelter to Cross Road in Ponniyanthal Panchayat
2024_RDTN_442412_1
TNKKI/TRK/MLACDS/ 2023-24/02
Open Tender
Civil Works
90 days
THIRUKOILUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,000
Yes
25 Jan 2026
6 Mar 2024
11 Mar 2024
6 Mar 2024
11 Mar 2024
6 Mar 2024
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid