Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 145 1 0 NEAR OLD LIC SHIV NAGAR VILLAGE TOWN MODIPURAM CITY MEERUT MEERUT UTTAR PRADESH 250110 INDIA | MEERUT | UTTAR PRADESH | 250110 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance 2ND FLOOR SHOP NO 303 MARUTI PLAZA RONCHI BANGAR TOWNSHIP MATHURA | MATHURA | UTTAR PRADESH | 281001 | Admitted-Finance |
Tender Value
₹2.0 L
EMD Value
₹2,000
Closing Date
18 Jan 2024, 1:00 pmClosed
SE ETC Mathura
132 KV S/S Aurangabad Mathura
Works of Erection of 01 Nos 33 KV Brindavan Agro Industries Pvt. Ltd. Bay at 220 KV S/S Chhata under ETD Mathura
2023_UPTCL_873656_1
ET-32/ETC(M)/23-24
Open Tender
Electrical Works
Lump-sum
30 days
Under ETC Mathura
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
EE ATT ETC Mathura
₹2,000
1 Feb 2024
23 Dec 2023
19 Jan 2024
23 Dec 2023
18 Jan 2024
23 Dec 2023
Amount
Erection of following equipments as per Instruction manual of various equipments and technical specifications including shifting of material/equipment from store to erection site including all other associated work to complete the job satisfactorily as per direction of supervising engineer.
33 KV VCB
33 KV Bus Isolators
33 KV line isolator
Junction Box of CT/PT
33 KV Single Phase PT
C&R Panel
Erection of Main and auxiliary structure consisting of columns, beams, peaks, masts etc. and auxiliary structure required for installation of Isolators, C.Ts. P.Ts., CVTs, L.As. and all other equipments. The job consists of shifting of all material i.e. structure parts, nuts, bolts, washers etc. from store to site of erection. erection of structure as per relevant drawing and practices using flat and spring washer with each bolt. Matching of holes, cutting matching of members if required shall also be done by the contractor without any extra cost to complete the work satisfactorily. All material to be erected shall be supplied by UPPTCL free of cost but all men, material and T&P required for satisfactorily completion of work shall be arranged by the contractor at his own cost including all other associated work to complete the job satisfactorily as per direction of supervising engineer.
ABL Structure
ALP Structure
Interconnection work between 33 kv main bus to bus isolator and bus isolator to 33 KV VCB and 33 KV VCB to 33 KV CT to PT and 33 KV CT to Line Isolator with single/double by Panther Conductor including cutting laying, fixing and proper tightening with the help of skilled labour & T&P including all other associated work to complete the job satisfactorily as per direction of supervising engineer.
Laying of flowing sizes of control cable in the cable trench from various equipment to control and relay pane, marshalling boxes etc. from switch yard as per cable schedule, its saddling at every 750mm distance with M.S. saddles of size 25X3mm. Size including carriage of cable drums from store to laying site and shifting back to store and all other associated work to complete the job satisfactorily as per direction of supervising engineer.
6X2.5 Sq. mm
4X2.5 Sq. mm
2X2.5 Sq. mm
Termination of following sizes of cable as laid above as per cable schedule including making necessary holes in glands plates or box wherever required, supply and fixing of cable glands of appropriate size, supply and providing ferrules and Nos. for each core. (The rates of termination of Control cable include the all cores of cable at one end with lug) including all other associated work to complete the job satisfactorily as per direction of supervising engineer.
6X2.5 Sq. mm (each end)
4X2.5 Sq. mm (each end)
2X2.5 Sq. mm (each end)
Supply of MS Flat-
75x10 Sq.mm
50x6 Sq.mm
Cutting straightening, bending laying 600 mm below in side ground and above ground of with 50X6 mm size of M.S. Flat for earthing of main structure, Auxiliary structure, C.T, C.B, B.I, L.I, with by 50x6 MS. Round with newly laid earth mat ‘x’ & ‘y’ axis below 600 mm ground and above by excavation of trenches its back filling, straightening, cutting, bending work also includes painting of M.S earth ship above ground level with one coat of red oxide and two coat of bus green enameled paint, and below ground each earth point raising from main earthmat ‘x’ & ‘y’ axis should be painted with bitumen black Japan paint and all other associated work as required to complete the work satisfactorily as per direction of supervising engineer. (excluding the cost of M.S Flat).
Preparation of Inter connection diagram and cable schedule as per drawing to complete above job for C&R panel and circuit breaker
Supply & laying of A, grade hot dip GI Pipe of following size inside the trench and laying of Control cable of 4x2.5 sq. mm, 2x2.5 sq. mm inside the pipe. Work includes cutting of thread, fixing of Elbow/Band, T-joint, four bay cross joint and other associated material required to complete the pilpher proofing work including all labour and T&P required as per site condition to complete the job satisfactrorily as per direction of supervising Engineer.
G.I. Pipe 2.0" size
G.I. Pipe 0.75" size
Safe Carriage of any item required for bay construction and available in any division store in substation under ETD, Mathura to 220 KV S/S Chhata
SARASWAT ELECTRICALS
GANGOTRI CONSTRUCTION
Hi-tech power transmission
M/s Tanishk Enterprises
M/s S.S. Refregeration
P&H Engineering
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .