Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.0 LAccepted-Finance | ₹12.0 L | L1 | Accepted-Finance Accepted |
| 2 | L2₹13.3 L+₹1.2 L (10.3%)Rejected-Finance | ₹13.3 L+₹1.2 L (10.3%) | L2 | Rejected-Finance REJECTED |
| 3 | L3₹13.5 L+₹1.4 L (12.0%)Rejected-Finance | ₹13.5 L+₹1.4 L (12.0%) | L3 | Rejected-Finance REJECTED |
| 4 | L4₹13.5 L+₹1.5 L (12.6%)Rejected-Finance | ₹13.5 L+₹1.5 L (12.6%) | L4 | Rejected-Finance REJECTED |
| 5 | L5₹13.5 L+₹1.5 L (12.6%)Rejected-Finance 1 1 GRAM SAIDAPUR SADAPUR DISTRICT AMBEDKARNAGAR | AMBEDKAR NAGAR | UTTAR PRADESH | 224122 | ₹13.5 L+₹1.5 L (12.6%) | L5 | Rejected-Finance REJECTED |
| Sl No | Description | Qty | Unit | M/s Laxmi Kant Sharma L4 | SHRI KRISHAN CONTRACTOR L2 | M/S SRASHTI INFRASTRUCTURE L3 | M/S TARA CONSTRUCTION L5 | RAJKUMAR SHARMA CONTRACTOR L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in foundation in dry ordinary soil (loam clay or sand) including lift up to 1.5 meter and lead up to 30 meter and including back filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal or surplus earth as directed by the Engineer-in-charge up to a distance of 30M from the foundation trenches. | 75.16 | Cum | 70 ₹5,261.2 | 50 ₹3,758 Lowest | 50 ₹3,758 Lowest | 85 ₹6,388.6 | 74 ₹5,561.84 |
| 2.00 | Providing and Laying Cement Concrete M-15 and curing complete I/C all cost of material,labour and T.& P. etc. complete. As directed by the Engineer-in-charge | 29.83 | Cum | 5,800 ₹1,73,014 | 6,500 ₹1,93,895 | 5,700 ₹1,70,031 | 5,320 ₹1,58,695.6 | 4,857.36 ₹1,44,895.05 Lowest |
| 3.00 | Providing and Laying Reinforced Concrete M-25 and curing complete I/C all cost of material,labour and T.& P. etc. complete. As directed by the Engineer-in-charge | 59.3 | Cum | 7,800 ₹4,62,540 | 6,500 ₹3,85,450 | 7,500 ₹4,44,750 | 7,063 ₹4,18,835.9 | 6,441.7 ₹3,81,992.81 Lowest |
| 4.00 | Centering & Shuttering for R.C.C. work including cost of centering and shuttering up to 3 m height .As directed by the Engineer-in-charge | 233.96 | Sqm | 574 ₹1,34,293.04 Lowest | 600 ₹1,40,376 | 700 ₹1,63,772 | 750 ₹1,75,470 | 636.4 ₹1,48,892.14 |
| 5.00 | Providing and Laying Reinforced Concrete M-20 and curing complete I/C all cost of material,labour and T.& P. etc. complete. As directed by the Engineer-in-charge | 2.92 | Cum | 7,000 ₹20,440 | 6,000 ₹17,520 | 6,500 ₹18,980 | 6,310 ₹18,425.2 | 5,744.62 ₹16,774.29 Lowest |
| 6.00 | Cutting, Bending, Binding cutting & Placing of reinforcement including binding wire also including cost of steel Fe 500.As directed by the Engineer-in-charge | 5.82 | MT | 78,000 ₹4,53,960 | 70,000 ₹4,07,400 Lowest | 81,000 ₹4,71,420 | 82,000 ₹4,77,240 | 71,221.3 ₹4,14,507.97 |
| 7.00 | Local sand filling in making of sub-grade i/c cost of all labour,material and T&P etc.as directed by Engineer- in-Charge. | 7.85 | Sqm | 1,000 ₹7,850 | 20 ₹157 Lowest | 1,200 ₹9,420 | 1,400 ₹10,990 | 1,331.26 ₹10,450.39 |
| 8.00 | Dry Stone pitching hand packed including labour and T&P also including cost of all material as directed by the Engineer-in-charge | 5.33 | Cum | 6,000 ₹31,980 | 200 ₹1,066 Lowest | 1,500 ₹7,995 | 1,200 ₹6,396 | 1,266.88 ₹6,752.47 |
| 9.00 | Finishing walls with exterior emulsion paint of required shade in two coat i/c supply of all labour,material and T&P required for proper completion of work.as directed by the Engineer-in-charge | 21.76 | Sqm | 200 ₹4,352 | 200 ₹4,352 | 105 ₹2,284.8 | 110 ₹2,393.6 | 103.6 ₹2,254.34 Lowest |
| 10.00 | Supplying & fixing PVC Pipe 75 mm dia with all cost of material,labour and T.& P. etc. complete.as directed by the Engineer-in-charge | 4 | RM. | 100 ₹400 Lowest | 200 ₹800 | 150 ₹600 | 145 ₹580 | 128.76 ₹515.04 |
Tender Value
₹16.2 L
EMD Value
₹32,500
Closing Date
7 Jul 2026, 4:00 pmClosed
Neeraj Kumar Singh
Lower Division Agra Canal Agra
RE-CONSTRUCTION OF V.R.B.(BOX CULVERT) OF F.S BRANCH AT Km. 78.333 IN DISTT. AGRA
2026_UPIDC_1164851_5
02/EE/2026-27
Open Tender
Civil Works
Item Wise
90 days
RE-CONSTRUCTION OF V.R.B.(BOX CULVERT) OF F.S BRA
Please refer Tender documents.
3 documents required · 3 mandatory
₹354
₹32,500
Yes
11 Sept 2026
30 Jun 2026
8 Jul 2026
30 Jun 2026
7 Jul 2026
30 Jun 2026
30 Jun 2026 - 7 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in foundation in dry ordinary soil (loam clay or sand) including lift up to 1.5 meter and lead up to 30 meter and including back filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal or surplus earth as directed by the Engineer-in-charge up to a distance of 30M from the foundation trenches. | 75.16 | Cum | - | - |
| 2 | Providing and Laying Cement Concrete M-15 and curing complete I/C all cost of material,labour and T.& P. etc. complete. As directed by the Engineer-in-charge | 29.83 | Cum | - | - |
| 3 | Providing and Laying Reinforced Concrete M-25 and curing complete I/C all cost of material,labour and T.& P. etc. complete. As directed by the Engineer-in-charge | 59.3 | Cum | - | - |
| 4 | Centering & Shuttering for R.C.C. work including cost of centering and shuttering up to 3 m height .As directed by the Engineer-in-charge | 233.96 | Sqm | - | - |
| 5 | Providing and Laying Reinforced Concrete M-20 and curing complete I/C all cost of material,labour and T.& P. etc. complete. As directed by the Engineer-in-charge | 2.92 | Cum | - | - |
| 6 | Cutting, Bending, Binding cutting & Placing of reinforcement including binding wire also including cost of steel Fe 500.As directed by the Engineer-in-charge | 5.82 | MT | - | - |
| 7 | Local sand filling in making of sub-grade i/c cost of all labour,material and T&P etc.as directed by Engineer- in-Charge. | 7.85 | Sqm | - | - |
| 8 | Dry Stone pitching hand packed including labour and T&P also including cost of all material as directed by the Engineer-in-charge | 5.33 | Cum | - | - |
| 9 | Finishing walls with exterior emulsion paint of required shade in two coat i/c supply of all labour,material and T&P required for proper completion of work.as directed by the Engineer-in-charge | 21.76 | Sqm | - | - |
| 10 | Supplying & fixing PVC Pipe 75 mm dia with all cost of material,labour and T.& P. etc. complete.as directed by the Engineer-in-charge | 4 | RM. | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 17.37 MB
BOQ_2184847.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .