Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Others-documents not in format |
| 4 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Others-all documents not attached |
Tender Value
₹11 L
EMD Value
₹22,000
Closing Date
21 Jan 2022, 1:00 pmClosed
Executive Engineer
Office of Executive Engineer Sharda Sahayak khand 6 Raebareli
Repairing and installation of burnt 5 MVA, 33/3.3 KV HT Transformer , Marsons make Kolkata at Dalmau A first stage pump canal, Dalmau, Raebareli
2021_UPIDM_657139_1
Short Term E Tender Notice No. 04
Open Tender
Electrical Works
Lump-sum
30 days
Raebareli
Please refer tender document for term and conditions
2 documents required · 2 mandatory
₹766
Executive Engineer Sharda Sahayak khand 6
₹22,000
21 Jan 2022
23 Dec 2021
21 Jan 2022
24 Dec 2021
21 Jan 2022
24 Dec 2021
Amount
Repairing and installation of fire burn 5 MVA (33/3.3 KV) Transformer
Comlplete Repairing & reconditioning of burnt 5 MVA, 33/3.3 KV H.T Transformer, Marsons make Kolkata at Dalmau ‘A’ Ist stage pump canal, Dalmau, Raebareli by testing of transformer at site, draining of transformer (if any), Tanking and detanking of transformer core & coil assembly, dismantling of burnt & damaged radiators and copper coil, Replacement of all coils by new copper coils with supply of insulation material. Cleaning, washing of dust, dirt & slush etc. from all the parts including radiators and tank, Replacement of damaged CRGO, Final assembly of coils with delta star connections and baking of transformer in heating chamber, Painting inside and outside of transformer including radiator and tank with suitable primer and paint and coating of tank with zink cromate, Unloading of transformer on site and installation of transformer with connecting radiators, Properly using misc. Insulation & hardware materials replacing old transformer oil by new transformer oil & final installation and testing of transformer Including cost of installation. handling and transportation of transformer ( Excluding applicable GST)
M/S LAKSHMI ELECTRICALS
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .