Tender Value
₹427.1 Cr
EMD Value
₹2 Cr
Closing Date
23 Apr 2026, 3:00 pmClosed
SCR Construction Organization: Engineering, Procurement and Construction (EPC) contract for "Doubling works from Perur station to Gadwal station including Electrification & Signaling works and provision of 2x25 kV SSP at Manyamkonda in connection with doubling of Mahabubnagar- Dhone section in the state of Telangana" in Mahabubnagar and Dhone section in Hyderabad Division of South- Central Railway-Reg
EPC-03-CAO-C-SC-2026
EPC-03-CAO-C-SC-2026
Open
24 Months
Mahabubnagar, Telangana
₹0
₹2 Cr
18 Feb 2026
18 Feb 2026
9 Apr 2026
G-EPC for Proposed Doubling of Track Below/P
A2-SOR; FOUNDATION ITEMS (incl. Supply & Erection) 1376835.20 Below/P
Item Breakup - A1-SOR; OHE & PSI Items
Erection/Labour Total 55440.00 Item- 2 3(b)Erection of TTCs, portals and small parts steel S No. Item Description of Item Unit Qty Rate Amount No
Erection / Labour Total 6930.00 Item- 3 3(e)Supply and erection of Guy Rod Assembly S No. Item Description of Item Unit Qty Rate Amount No SCR-CONST-HQ-ENGG/SOUTH CENTRAL RLY
Supply/Material
Erection / Labour Total 125412.00 7(a)Erection/Stringing of Along Feeder (either All Aluminium 25 kV Feeder (single spider) or Copper Item- 4 Feeder wire) S No. Item Description of Item Unit Qty Rate Amount No
Erection / Labour Total 18006.00 Item- 5 11 (a) (i)Supply (without Insulator) and Erection of 25 kV Solid Core cut-in insulator S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection / Labour Total 33410.00 Item- 6 11 (a) (ii)Supply (without Insulator) and Erection of 25 kV Solid Core Suspension insulator S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection / Labour Total 57868.00 Item- 7 11(b)Supply (without Insulator) and Erection of 25 kV Post Insulator S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection / Labour Total 15418.00 13(g)Supply (without Insulator) and Erection of 25 kV Double Pole Isolator (1600A)without earth Item- 8 contact assembly S No. Item Description of Item Unit Qty Rate Amount No
Erection / Labour Total 32040.00 15(c)Supply & Erection of 160 sq.mm Large Copper Jumper between Aluminium Bus and Cross Item- 9 feeder S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection / Labour Total 101160.00 Item- 10 15(d)Supply & Erection of 160 sq.mm Large Copper Jumper between Cross feeder and OHE S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection / Labour Total 71226.00 Item- 11 15(e)Supply & Erection of Aluminium Jumper S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection / Labour Total 71928.00 Item- 12 17(c )Supply and Erection of Single Earth electrode at TSS/SP/SSP/AT S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection / Labour Total 72564.00 SCR-CONST-HQ-ENGG/SOUTH CENTRAL RLY Item- 13 17(d)Supply and Erection of Copper Strips (25x3 mm) for Equipment earthing S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection / Labour Total 15660.00 Item- 14 18(a)Erection of 25 kV Vaccum Interruptor (BM) S No. Item Description of Item Unit Qty Rate Amount No
Erection / Labour Total 33576.00 Item- 15 19(a)Erection of 25 kV Type-II Potential Transformer (PT) S No. Item Description of Item Unit Qty Rate Amount No
Erection / Labour Total 2680.00 Item- 16 20(a)Erection of 42 kV Lightning Arrester S No. Item Description of Item Unit Qty Rate Amount No
Erection / Labour Total 5082.00 Item- 17 25 (a)Supply and erection of cable for Control and Indication (10 or 7 core,2.5 sq.mm) S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection / Labour Total 51255.00 Item- 18 25 (b)Supply and erection of cable for Heater supply (2 core, 4sq.mm) S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection / Labour Total 19890.00 Item- 19 25 (c )Supply and erection of cable for catenary indication (2 core,2.5 sq.mm) S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection / Labour Total 13950.00 Item- 20 25 (d)Supply and erection of cable for 110v DC Power supply (2 core, 4sq.mm) S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection / Labour Total 20115.00 Item- 21 26 (a)(i)Supply and Erection of Aluminium Bus bar 36mmx28mm S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection / Labour Total 41040.00 Item- 22 26 (c)(v)Supply and Erection of Aluminium Bus bar 50mmx39mm S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection / Labour Total 50240.00 Item- 23 26 (b)(i)Supply and Erection of Aluminium Bus terminal (6480) SCR-CONST-HQ-ENGG/SOUTH CENTRAL RLY S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection / Labour Total 10096.00 Item- 24 26(b)(ii)Supply and Erection of Aluminium Bus splice (6490) S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection / Labour Total 9672.00 Item- 25 26(b)(iii)Supply and Erection of Aluminium Bus TEE connector (6500) S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection / Labour Total 13080.00 Item- 26 26 (b)(iv)Supply and Erection of Aluminium Bus bar terminal connector 36/20mm (6530) S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection / Labour Total 8832.00 Item- 27 26 (b)(v)Supply and Erection of Aluminium bus bar tap connector (6520) S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection / Labour Total 14776.00 Item- 28 26(b)(vi)Supply and erection of Aluminium Flexible Bus splice (6550) S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection / Labour Total 25112.00 Item- 29 26(b)(vii)Supply and erection of Aluminium Bus terminal connector bolted type (6830-1) S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection / Labour Total 5752.00 26 (c)(vii)Supply and Erection of Rigid type Bi-metallic Terminal connector suitable for 50 mm dia Item- 30 AL Tubular Bus Bar to Terminal Pad of 25 kV Isolator/CT (ID no 11090) S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection / Labour Total 7295.00 26(c)(viii)Supply and Erection of Expansion Type Terminal connector to suit 50 mm dia AL Tubular Item- 31 Bus Bar to Terminal Pad of 25 kV C.T/Isolator/ C.B & Interrupter (ID no 11060) S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection / Labour Total 19685.00 26(c)(ix)Supply and Erection of 25 kV System Rigid Bus Splice connector to suit 50 mm O/D AL Item- 32 Tube on Both ways. (ID no 11180) SCR-CONST-HQ-ENGG/SOUTH CENTRAL RLY S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection / Labour Total 8005.00 26 (c)(x)Supply and Erection of 25 kV System TEE connector to suit 50 mm O/D AL Tubular Bus Bar Item- 33 to 50 mm O/D AL Bus Bar (ID no 11150) S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection / Labour Total 8035.00 26 (c)(xi)Supply and Erection of Rigid Through connector to suit 50 mm dia AL Tubular Bus Bar and Item- 34 Spider AAC Conductor for 25 kV PT Type-II (ID no 11110) S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection / Labour Total 8625.00 26 (c)(xii)Supply and Erection of 25 kV System TEE connector to suit 50 mm O/D AL Tube and Item- 35 Spider AAC Conductor (ID no 11140) S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection / Labour Total 7590.00 26 (c)(xvi)Supply and Erection of 25 kV System TEE Connector to suit 36 mm O/D AL Bus Bar to 50 Item- 36 mm O/D AL Bus Bar (11240) S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection / Labour Total 13785.00 Item- 37 26 (c)(xvii)Supply and Erection of Siding clamp for 50 mm AL Busbar (11190) S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection / Labour Total 7645.00 26 (c)(xix)Supply and Erection of Rigid type Bi-metallic connector for 50 mm AL Busbar (ID no Item- 38 11070) S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection / Labour Total 7915.00 26 (c)(xx)Supply and Erection of 25 kV Expansion Bus Coupler to suit 50 mm AL Busbar (ID no Item- 39 11210) S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection / Labour Total 24080.00 Item- 40 34 (f)Excavation of Earth, filling including compaction in all kinds of soil S No. Item Description of Item Unit Qty Rate Amount No
Erection / Labour Total 17880.00 Item- 41 1(a) Preparation of Design & Drawings for Switching Station (SP/SSP) SCR-CONST-HQ-ENGG/SOUTH CENTRAL RLY S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 81656.00 Item- 42 1(b)Preparation of Design & Drawings for Traction substation S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 88273.00
Item Breakup - A2-SOR; FOUNDATION ITEMS (incl. Supply & Erection)
Erection / Labour Total 1199900.00 Item- 2 2 (c)(i)Reinforced concrete for foundation, plinth and cable trench S No. Item Description of Item Unit Qty Rate Amount No
Erection / Labour Total 152685.00 Item- 3 2 (c)(ii)Reinforced concrete for Cable trench covers. S No. Item Description of Item Unit Qty Rate Amount No
Erection / Labour Total 24250.20
Item Breakup - B1-SOR; Steel supply
Supply/Material Total 2114784.00 3[cs]Supply of Fabricated and Galvanized Small Parts Steel (SPS) other than Masts, TTCs and Item- 2 Portals. S No. Item Description of Item Unit Qty Rate Amount No
Supply / Material Total 294512.00
Item Breakup - B2-SOR; Copper supply
Supply/Material Total 107406.00 Item- 2 15 (bs)Supply of 160 sq.mm Annealed stranded copper jumper wire S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material Total 220092.65
Item Breakup - B3-SOR; Insulator supply
Supply/Material Total 165800.00 Item- 2 11(bx)Supply of Post Insulator for item no.11(b) S No. Item Description of Item Unit Qty Rate Amount No SCR-CONST-HQ-ENGG/SOUTH CENTRAL RLY
Supply/Material Total 72254.00
Item Breakup - B4-SOR; General supply
Supply/Material Total 344442.00
Item Breakup - B5-Non-SOR Schedule Items
Erection / Labour Total 220980.75 Item- 2 Modifications to existing SCADA S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection / Labour Total 446940.00
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
SOR2025ExplanationNotes.pdf
ATTACHMENT
2x25kVGPSMBNR-GWDPART-AAppddt08-01-26-11111.pdf
ATTACHMENT
All2x25TSSSPSSPRDSOdrawings.pdf
ATTACHMENT
BafflewallandprotectivescreenRDSOdrgs.pdf
ATTACHMENT
Electricalpolicyletters.pdf
ATTACHMENT
Electricalpolicyletters2.pdf
ATTACHMENT
Electricalpolicyletters3.pdf
ATTACHMENT
ElectricalTRDdrawingslinks.pdf
ATTACHMENT
ETISPCPSICLS0020.pdf
ATTACHMENT
GEworksCircular04-2022_monitoringGEWorks.pdf
ATTACHMENT
ImportantElectricalTRDguidelinesletters.pdf
ATTACHMENT
Master_list_of_drawings_TI2023.pdf
ATTACHMENT
RDSOOHEPSIReportsandemp.sch.pdf
ATTACHMENT
SCADATI_SPC_RCC_SCADA_0134-pages-11.pdf
ATTACHMENT
TICIVMS2020dt22.08.2022galvanization.pdf
ATTACHMENT
TOWERCARANDOHECUMPSIdepotdrg.pdf
ATTACHMENT
gadwalkm183-186_1.pdf
ATTACHMENT
km177-180.pdf
ATTACHMENT
km180-183.pdf
ATTACHMENT
KM-154-158REVISEDLOP.pdf
ATTACHMENT
KM-158-162LOP.pdf
ATTACHMENT
KM-162-165LOP.pdf
ATTACHMENT
km-168-171lop.pdf
ATTACHMENT
km-171-174LOP.pdf
ATTACHMENT
km-174-177SriramNagarStationLOP.pdf
ATTACHMENT
WANAPARTHISTATIONTSSFEEDERLOP.pdf
ATTACHMENT
TentativePERR-GDWLDrawings.pdf
ATTACHMENT
WANAPARTIROADPROVISIONALSIP-Model.pdf
ATTACHMENT
SRIRAMPURAMSIP-18.11.2025.pdf
ATTACHMENT
teleconsoleAssembly.pdf
ATTACHMENT
VHFTower15m.pdf
ATTACHMENT
ApprovedfloorplanforRBGOFCMTGoomtyandLCGateLodge.pdf
ATTACHMENT
EPCDocofEPCPERR-GWDdt.18.02.2026.pdf
ATTACHMENT
PrebidConferenceLink_2.pdf
ATTACHMENT
RFPdocofEPCPERR-GWDdt.18.02.2026..pdf