| Sl No | Description | Qty | Unit | M VIJEYARAMAN L1 | A N KANNAN L2 |
|---|---|---|---|---|---|
| 1.01 | Dismantling the existing damaged RCC concrete | 11 | M3 | 520 ₹5,720 Lowest | 543.9 ₹5,982.9 |
| 2.01 | Supplying and erecting shuttering with necessary supports for plith beam with all cross brancings etc..,complete(Rcc coloumn footing plinth beam and lintel sides) | 83 | M2 | 460.1 ₹38,188.3 Lowest | 481.3 ₹39,947.9 |
| 3.01 | Supplying and erecting shuttering with necessary supports for plain surface such as RCC boxing side slab, and similar,RCC Slab with all cross bracings etc., complete in all floors of any height (The retrieved materials should be taken back by the contractor). The payment for centering shall be given after the concrete is laid. (Lintel & Sunshade) using steel plates10m2. Bottom Only | 41 | M2 | 1,123.6 ₹46,067.6 Lowest | 1,175.3 ₹48,187.3 |
| 4.01 | Reinforced cement concrete 1:2:4 (One Cement two sand and four aggregates) using 20mm machine broken gauge bard granite jelly for RCC worksthe rate excluding the cost of reinforcement grills,centering and shuttering etc., complete | 9.5 | M3 | 8,787.1 ₹83,477.45 Lowest | 9,191.3 ₹87,317.35 |
| 5.01 | Reinforced cement concrete 1:1 1/2 :3 (One cement One and half sand and three aggregate) using 20mm machine broken gauge bard granite jelly for RCC worksthe rate excluding the cost of reinforcement grills,centering and shuttering etc., complete | 10 | M3 | 9,565.6 ₹95,656 Lowest | 10,005.6 ₹1,00,056 |
| 6.01 | Supplying fabricating and placing in position of MS grills for reinforcement rate inc. the cost of steel for all works (the rate to include cost of binding wire also). | 700 | Kg | 109.2 ₹76,440 Lowest | 114.2 ₹79,940 |
| 7.01 | Cement concrete 1:2:4 (One Cement two sand and four aggregates) using 20mm machine broken gauge bard granite jelly for foundation including consolidation dewatering for foundation wherever necessary etc, complete | 10 | M3 | 7,129.5 ₹71,295 Lowest | 7,457.5 ₹74,575 |
| 8.01 | Add GST 18% | 1 | GST | 75,033.8 ₹75,033.8 Lowest | 78,485.4 ₹78,485.4 |
Tender Value
₹4.9 L
EMD Value
₹4,921
Closing Date
10 Nov 2025, 3:00 pmClosed
The Commissioner Madurai Corporation
Aringar Anna Maligai, Thallakulam, Madurai.
Construction 6 Nos road cross culvert various places in ward 89
2025_MAWS_619200_1
Z4 / E3 / EST 505 / 2025-26
Open Tender
Civil Works
Lump-sum
Madurai
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹4,921
9 Dec 2025
1 Nov 2025
10 Nov 2025
1 Nov 2025
10 Nov 2025
1 Nov 2025
Amount
Dismantling the existing damaged RCC concrete
Supplying and erecting shuttering with necessary supports for plith beam with all cross brancings etc..,complete(Rcc coloumn footing plinth beam and lintel sides)
Supplying and erecting shuttering with necessary supports for plain surface such as RCC boxing side slab, and similar,RCC Slab with all cross bracings etc., complete in all floors of any height (The retrieved materials should be taken back by the contractor). The payment for centering shall be given after the concrete is laid. (Lintel & Sunshade) using steel plates10m2. Bottom Only
Reinforced cement concrete 1:2:4 (One Cement two sand and four aggregates) using 20mm machine broken gauge bard granite jelly for RCC worksthe rate excluding the cost of reinforcement grills,centering and shuttering etc., complete
Reinforced cement concrete 1:1 1/2 :3 (One cement One and half sand and three aggregate) using 20mm machine broken gauge bard granite jelly for RCC worksthe rate excluding the cost of reinforcement grills,centering and shuttering etc., complete
Supplying fabricating and placing in position of MS grills for reinforcement rate inc. the cost of steel for all works (the rate to include cost of binding wire also).
Cement concrete 1:2:4 (One Cement two sand and four aggregates) using 20mm machine broken gauge bard granite jelly for foundation including consolidation dewatering for foundation wherever necessary etc, complete
Add GST 18%
A N KANNAN (BID ID -1505738)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
DOC.pdf
Tender Documents • 0.79 MB
BOQ_740195.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .