Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 LAccepted-Finance | L1 | Accepted-Finance Accepected |
| Sl No | Description | Qty | Unit | Sri Shanthi Electrical Construction L1 |
|---|---|---|---|---|
| 1.00 | Excavation of pole pit for pole upto 8.00m length by using JCB/Manual | 9 | Per Pit | 500 ₹4,500 Lowest |
| 2.00 | Erection of RCC, REC, PSC poles upto 8.00m length | 9 | Per Pole | 550 ₹4,950 Lowest |
| 3.00 | Excavation of pole pit for pole above 8.00m length by using JCB/Manual | 5 | Per Pit | 600 ₹3,000 Lowest |
| 4.00 | Erection of RCC, REC, PSC poles above 8.00m length by using Crane / Manual | 3 | Per Pole | 650 ₹1,950 Lowest |
| 5.00 | Erection of RSJ Pole 40 Ft length by using Crane / Manual | 2 | Per Pole | 750 ₹1,500 Lowest |
| 6.00 | Fixing of 11 KV V Cross Arm/Tapping X-Arm/Guarding X-Arm | 12 | Per | 210 ₹2,520 Lowest |
| 7.00 | Fixing of 33 KV V Cross Arm/Tapping X-Arm/Guarding X-Arm | 5 | Per | 250 ₹1,250 Lowest |
| 8.00 | Fixing of 33/11 KV HT/LT TI Fittings | 10 | Per | 60 ₹600 Lowest |
| 9.00 | Fixing of LT 1 phase cross arm | 2 | Per | 80 ₹160 Lowest |
| 10.00 | Fixing of LT 3 phase cross arm | 15 | Per | 120 ₹1,800 Lowest |
Tender Value
Refer Docs
Closing Date
4 Aug 2025, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE Arcot
110KV SS Arcot campus thazhanur
Domestic Service to Thiru.M.Dhananchezhiyan S/o Muthu, Allalacheri, 2.Eos-The President Panchayat, Kalavai, 3.Eos-Tmty.S.Chitra W/o Suresh, Kaniyanoor, 4.Dcw-Thiru.K.Suresh, Kalavai, 5.Dcw-Thiru.M.Sathish W/o Manickam, Ozhalai, 6.Dcw-Thiru.M.B.Dinesh
2025_EB_582653_1
EE3/S.038
Limited
Electrical Works
Works
Arcot
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
8 Aug 2025
19 Jul 2025
5 Aug 2025
19 Jul 2025
4 Aug 2025
19 Jul 2025
Amount
Excavation of pole pit for pole upto 8.00m length by using JCB/Manual
Erection of RCC, REC, PSC poles upto 8.00m length
Excavation of pole pit for pole above 8.00m length by using JCB/Manual
Erection of RCC, REC, PSC poles above 8.00m length by using Crane / Manual
Erection of RSJ Pole 40 Ft length by using Crane / Manual
Fixing of 11 KV V Cross Arm/Tapping X-Arm/Guarding X-Arm
Fixing of 33 KV V Cross Arm/Tapping X-Arm/Guarding X-Arm
Fixing of 33/11 KV HT/LT TI Fittings
Fixing of LT 1 phase cross arm
Fixing of LT 3 phase cross arm
Fixing of 33 KV Strain Disc with Metal Parts
Fixing of 11 KV Strain Disc with Metal Parts
Fixing of 33/11 KV Pin Insulator
Excavation of Stay pit of 4.5 ' to 5 ' depth using JCB / Manual
Erection of stay set complete with fixing up stay wire Eye, Bow, Guy Shackle, Binding etc..
Paving and stringing of conductors of sizes upto 7/2.59 mm ACSR or other equivalent conductor
Paving and stringing of conductors of sizes above 7/2.59 mm ACSR or other equivalent conductor
Paving and stringing of conductors of sizes 7/4.09mm ACSR or other equivalent conductor
Fixing of LT Shackle
Fixing of LT Pin Insulator
Fixing of Alu Knob
Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) (i) For a lead upto 0.5 KM
Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) (ii) Above 0.5 KM (4 X 75 = Rs.300)
Dismantling of conductor upto 7/3.35 mm including stocking of coils to the nearest road side
Dismantling of RCC,REC,PSC Pole include closing of the pit
Dismantling of cross arm, clamps, TI Fittings, hardwares etc..,
Concreting with 1:4:8 mix using 40 mm Jelly including curing (Material + Labour) (i) Mass Concreting of poles
Earthing of poles with GI wires 4 or 6 SWG by coil earthing
Dismantling of conductor above 7/3.35 mm including stocking of coils to the nearest road side
Resagging of one run of all size of conductor (i) 7/2.59 mm ACSR
Resagging of one run of all size of conductor (iii) 7/4.09 mm ACSR
Erection of 11 KV Single Pole Structure including erection of DT complete with centre support including fixing of MCD box
Loading or Unloading of Distribution Transformer (i) Upto 100 KVA
Transporting of Distribution Transformer from stores to office /site upto 10 KM distance by engaging 1 Ton Capacity Minidor (Lorry)
Erection of DT at Structure (ii) Above 25 KVA to 100 KVA
G.S.T. @18% should be Entered by the Bidder
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .