Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹16 L
EMD Value
₹16,000
Closing Date
21 Jun 2024, 3:00 pmClosed
SE EDC-II GORA BAZAR RAEBARELI
SE EDC-II GORA BAZAR RAEBARELI
OVERHAULING AND CENTRIFUSING OF POWER T/F INSTALLATION OF TPMO INSTALLATION OF T/F AND PROVIDING T/F TROLLY ETC
2024_MVVNL_923788_1
TENDER NO 228/EDCR-II/2023-24
Open Tender
Electrical Works
Item Wise
30 days
EE EDD SALON
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
ICICI BANK A/C NO 081205500344/IFSCODE ICIC0000812
₹16,000
Yes
22 Jun 2024
1 May 2024
22 Jun 2024
3 May 2024
21 Jun 2024
3 May 2024
Amount
CORTAGE OF STOR ITEMS FROM ESC TRIPULA RAEBARELI TO DUMP SITE AND DUMP SITE TO WORK SITE ALONGWITH LOADING UNLOADING AND PROPER STACKING:-
63 KVA T/F
250 KVA T/F
8.5 Mtr long PCC Pole.
LT Cable PVC (1X400 sqmm)
ACSR Weasel Conductior
Stay Set Complete (16X1800) mm. Stay Rod
Earthing Complete
S.S. Base Angle
11 KV Composit Pin Insulators With Pins
11 KV Composit Disc Insulators 45 KN T&C with Fitting
"T" OFF Channel (125X65X2240 MM)
Top Channel (125X65X2240 MM)
Dropper Channel (100X50X2028 MM)
11 KV TPMO SET COMPLETE
ERRECTION & LABOUR CHARGES:-
The work for drian out of transformer oil from 4X5 MVA Transformers In empty Oil Tank at site including Loading-Unloading and cartage of oil tank to and fro.
The wrork for dismenteling of HV & LV side bushing, oil pipeline radiator, conservator tank, vent pipe etc. of 4X5 MVA Transformers.
The work for providing and fixing of gas kit as per exIsting size made of Rubberxed cark sheet kotik/tell braze brand grade 007 and replacement old & damage Gais kit as per following part of 4X5 MVA Transformers:-
The work for removal of damage packing of LV side bushing/ metal parts and replacement with new gas kit/Metal parts its fixing after proper cleaning of 4X5 MVA Transformers.
The work for removal of damage packing of HV side bushing/ metal parts and replacement with new gas kit/Metal parts its fixing after proper cleaning of 4X5 MVA Transformers.
The work for removal of damage packing of neutral buhing and replacement with new gas kit/Metal parts its fixing after proper cleaning of 4X5 MVA Transformers.
The work for removal of damage packing of radiators and radiator valve inside and outside all pipeline etc. replacement by new gas kit and there after proper cleaning of 4X5 MVA Transformers.
The work for removal of damage packing of radiator, air releasing plucg, replacement of new gas kit and there after proper cleaning of 4X5 MVA Transformers.
The work for errection with safe carrige and lifting of radiators conservator tank with vent pipe of 4X5 MVA Transformers, its fixing after proper cleaning.
The work of centrifusing of Transformers oil of 4X5 MVA Transformers on site on load for achieving rated BDV volue installed at above 33/11 kV substations.
The work for replacement of damage breather with silica jel of 4X5 MVA Transformers.
Grouting of PCC Pole with grouting materials including digging of Pole to pit side as per RESPO Norms.
Digging of Pits, fixing nozzling & grouting of Stay Rod inclucing fitting of all accessories with grouting materials as per RESSPO Norms
Laying , stringing & sagging of LT Cable PVC (1X400 sqmm) Including all associated work and making clearance of Road with joint/jumpers and binding on insulator as per RESSPO Norms.
Laying , stringing & sagging of ACSR Weasel Conductor, Including all associated work and making clearance of Road with joint/jumpers and binding on insulator as per RESSPO Norms.
Digging of Pits of PCC Pole 8.5 Mtr Long then making/grouting of double pole structure by pcc pole with grouting materals and fitting of all required accesories for mounting of T/F on D/pole as per resspo norms. As per Estimate.
Work for Mounting of 63 KVA/250 KVA T/F on D/pole Structrue along with fitting of all accesories as per resspo norms. As per Estimate.
Earthing of 63 KVA/250KVA T/F body and Neutral of T/F Complete work as per resspo norms.
Earthing of Pole as per RESPO norms.
Work for Installation/fixing of SS Base Angle
Work for Installation/fixing of Disc Fitting 45 KN (T&C) with Disc Insulator
Work for Installation/fixing of Holding Clamp for PCC Poles. Material Provided By the Contractor.
Work for Installation/fixing of 11 KV Composit Pin Insulators
Work for Installation/fixing of "T" OFF Channel.
Work for Installation/fixing of TPMO SET COMPLETE
Work for Installation/fixing of Dropper Channel.
Work for Installation/fixing of Top Channel.
Making/Fixing of LT PVC Cable (1X400 sqmm).
All lug 400 sqmm, Material Provided By the Contractor.
Work for Installation/fixing of Tail Less Unit 500A, Material Provided by Contractor
Work for Installation/fixing of Copper "Z" piece, Material Provided by Contractor
Work for Installation/fixing of Clmap with nut and bolts FOR Cross Arm/TPMO, Material Provided by Contractor
Work for Installation of TPMO Set and Tightening of Clmap with nut and bolts. As per RESPO Norms.
The work for making moving Trolly for Loading of 250 kva T/F on Trolly with all accessories. (Moving Trolly provided by Cntractor)
The work for uploading of 250 KV T/ F on Moving T/F Trolly, then Complete Fitting with all accessories. (Required Accessories provided by Contractor)
M/S Jai Maa Durge Gramin Vikas Sewa Samiti
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .