Tender Value
Refer Docs
EMD Value
₹60,000
Closing Date
20 Apr 2021, 6:00 pmClosed
Executive Engineer
S and D Div West Jammu
Construction/Up gradation/repairs to Nallahs/Deep drains/Drains and other allied works to be executed by Sewerage and Drainage Division (West) Jammu in Ward Nos 26,34,35,36 and 37 (including cost of knitted crates) Contract No. SDJ/W/03/2021- 22
2021_HAUDD_121829_3
E-NIT No 01 of 2021-22 Dated 05-04-2021
Open Tender
Civil Works
Item Rate
365 days
Jammu
refer PQ terms and conditions
2 documents required · 2 mandatory
₹2,000
Executive Engineer S and D West Jammu
₹60,000
Executive Engineer S and D Div West Jammu
20 May 2021
6 Apr 2021
21 Apr 2021
6 Apr 2021
20 Apr 2021
10 Apr 2021
6 Apr 2021 - 9 Apr 2021
10 Apr 2021
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth 1 m from cutting edge. (All kinds of soil)
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:. (All kinds of soil)
Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m in all kinds of soil:
Removal of unhygienic materials (so classified by the site engineer) from designated sites and its disposal as per directions, all inclusive.
Demolishing cement concrete manually / by mechanical means including disposal of material (1:3:6 or richer mix)
Dismantling RCC work manually / mechanical means including stacking of steel bars and disposal of unserviceable material
Dismantling manually/ mechanically including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: Bituminous road.
Dismantling old protection work including cutting of crates and stacking of stones.
Opening out old wire crates those and re-binding after filling.
Hand-Packing stones in wire-crates,excluding cost of crates and stones.
Supply of Stones.
Dumping stone excluding cost of stones in Horizontal on level
Filling empty cement bags with sand/ earth, including cost of sewing and strings excluding cost of bags and earth / sand & placing .
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 [1cement : 4coarse : 8 graded crushed stone aggregate 40mm nominal size].
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 [ 1cement : 3coarse sand : 6graded crushed stone aggregate 20mm nominal size]
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 [1cement : 2coarse sand : 4 graded crushed stone aggregate 20mm nominal size].
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:2:4 [1cement : 2coarse sand : 4graded crushed stone aggregate 20mm nominal size]
Providing and laying in position Reinforced cement concrete of specified grade excluding the cost of centering and shuttering all works upto plinth level 1:1.5:3 mix (1cement : 1.5sand : 3 graded stone aggregate ) of 20mm nominal size crushed aggregate
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete including cost of binding wire. [Hot rolled deformed bars]
Extra for laying concrete in or under foul conducations
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.
12mm cement plaster of mix 1:4 (1cement :4course sand)
12mm cement plaster of mix 1:6 (1cement :6course sand)
15 mm cement plaster 1:6 (Cement : Sand Mix)
Centering and shuttering including strutting, propping etc. and removal of form for:
Foundation, footing, bases of columns etc. for mass concrete.
Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
Suspended floors, roofs, landing, balconies and access platform.
Edges of slabs and breaks in floors and walls upto 20cm wide.
Edges of slabs and breaks in floors and walls above 20cms wide.
Removel of Diversion bund after execution of work in wet.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
Slip Clearance
In ordinary soils disposal lead upto 50 m and lift upto 1.5 m.
In soils mixed with moorumiKankar/shingle/ boulders; disposal lead upto 50 m and lift upto 1.5 m.
Silt clearance from nallahs. Inclusive of initial lead and lift ( 50m & 1.5m respectively)
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared.
Carriage of Surplus earth / mulba for disposal 5 km by MT
Carriage of Material
Sand & Bajree 7 Km by MT
Stone agg. 40 mm & above, 7km by MT
Stone 7km by MT
Earth 7 Km. by MT
Supply of Knitted Wire Crate of size 6.00 x 1.50 x 1.50
Karam Veer Singh
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .