| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance ANGUL ODISHA 759147 INDIA UDYAM OD 01 0000096 | ANUGUL | ODISHA | 759147 | Admitted-Finance |
| 2 | Admitted-Finance NH 3 A 145 VINDHYANAGAR SINGRAULI MADHYA PRADESH 486885 | SINGRAULI | MADHYA PRADESH | 486885 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Rejected-Technical | Rejected-Technical Firm have not submitted all requisite document as per PQC. |
Tender Value
₹98.3 L
EMD Value
₹2.0 L
Closing Date
12 Dec 2023, 6:00 pmClosed
SE, Oand MC-I, BTPS, Anpara.
Office of THE SE, O and MC-I, BTPS, Anpara.
Preventive, Routine and Overhauling / Breakdown Maintenance and General Upkeep of C.W. Pumps System of 2x500 MW, BTPS, Anpara
2023_RVUNL_862923_1
03/CAD/BTPS/2023-24
Open Tender
Repair and Maintenance Works
Fixed-rate
730 days
Anpara TPS
As per Tender
3 documents required · 3 mandatory
₹1,180
DY. CAO, CFA and BO,BTPS, Anpara
₹2.0 L
15 Feb 2024
18 Nov 2023
14 Dec 2023
18 Nov 2023
12 Dec 2023
18 Nov 2023
18 Nov 2023 - 12 Dec 2023
Amount
Preventive Routine Maintenance and general upkeep of C.W. Pumps, Lub. Water Pump, piping, Valves, NRVs, Tanks, etc. of unit 4 & 5.
Operation up-keeping routine maintenance of of EOT Crane of C.W. Pump House in general shift. From (8.30 hrs. to 17.30 hrs) including one hour lunch time.
Operation of EOT cranes besides above hrs. in emergency, during holiday and Sunday on overtime basis as per site requirement.
Rectification/Replacement of Butter-fly valve sheet (Rubber Gasket) without repair/replacement of Retaining Ring as per scope of work.
Rectification/Replacement of Butter-fly valve sheet (Rubber Gasket) with repair/replacement of Retaining Ring as per scope of work.
Servicing of Gearbox of Butterfly valves of C.W. Pumps.
Decoupling, Alignment, Coupling of Pump with its motor in addition to O/H of pump as and when required (On request of Electrical Maintenance Division)
Complete overhauling/ Breakdown maintenance (in case of failure of pump due to any reason) of C. W. Pumps by carrying out the following work as detailed in scope of work. Including following works. (a)Decoupling of motor, dismantling of coupling of the pump. (b) Dismantling of Thrust bearing and pump, after dismantling of cooling pipes. (c) Cleaning, checking & revisioning /changing of worn out parts/components. (d) Assembling of the pump. (e) Alignment of the pump with motor after clearance from motor side.(f) Coupling of motor after proper alignment. (g) Commissioning of pump set
Epoxy painting on inside/outside surface of C.W. Pumps elements with all associated pipe line/valve etc. including supply of epoxy paint as per technical specification details.
Replacement of Spherical Roller Bearing/ Maintenance work of NRR/ any type of breakdown maintenance work in which dismantling of CW Pump up to discharge elbow is required.
Replacement of expansion bellow/Butterfly valves (Ist & IInd Isolation valve) of CW Pump discharge line as per scope of work.
Routine maintenance including operation of sump pump system as per scope of work.
Cleaning of sump pump pits (21 Pits x 12 Month).
General upkeep preventive routine maintenance as per scope of work for all pumps/valves listed at Sl.No. 7.10 to 7.40 of Part-C (D.M. Water condensate Make up Pump, A.C.W. Make up Pump, Boiler Fill Pump and Service Water Booster Pump.)
Breakdown/Overhauling of sump pump with motor set.
Breakdown / Overhauling of portable sump pump of 3 HP.
Painting of sump pump set, associated pipeline, valve and its support of sump pump house.
Grass/Bush cutting, cleaning of approach way and around sump pump house.
Complete overhauling & breakdown maintenance of D.M. Water condensate Make up Pump.
Complete overhauling & breakdown maintenance of A.C.W. Make up Pump.
Complete overhauling & breakdown maintenance of Boiler Fill Pump.
Complete overhauling & breakdown maintenance of Service Water Booster Pump.
Complete overhauling & breakdown maintenance of C.W. lubricating Water Pump.
Cleaning of underground tank of service water booster pump including maintenance of check valves and strainer of both pumps
Decoupling, Alignment and coupling of pump with motor (<50 KW) in addition to its overhauling
Decoupling, Alignment and coupling of pumps with motor (>50 KW) in addition to its overhauling
Overhauling of EOT crane of CW Pump House as per scope of work
Breakdown/overhauling/servicing of sump pump with motor set & associated valves etc. Of waste oil pit near G T area & electrical workshop including painting.
Overhauling/ Replacement of Screen gate of C.W. Pumps with new/heathy ones after epoxy painting.
Fabrication/Repairing of old screen gate Size: 1.90 mtr. x 4.40 mtr.
Providing Services of diving team to work inside water at C.W. Pump House of 2x500 MW, BTPS, Anpara for removal of choking, de-silting, repair / replacement of any damaged part and other mechanical work etc. as per direction of Engineer In-charge
Overhauling of Air release vents/valves installed on C.W. Duct of Unit 4 & 5.
Plugging/Clamping of Air vent pipe to minimize water leakage
Replacement of Air Vent pipe/valve.
Changing of packing of manholes of CW ducts
To make clear access by way of uprooting of grass, cutting of bushes & trees on C W duct & disposal of garbage (ATP area)
Uprooting of grass, cutting of bushes & trees on C W pond (BTPS side)
Re-rubberisation of old and worn out cutless rubber lined bearing in bronze shell of Intermediate shaft of C.W. Pumps Material: Synthetic Nitrile Length of Bronze shell : 320 mm I.D. of Bronze shell : 184 mm ID of bearing after rubberisation: 160mm
Re-casting of old & damaged bronze shell and rubberisation of rubber lined bearing of Intermediate shaft of CW pump Material: - Bronze and synthetic Nitrile Length of Bronze shell : 320 mm O. D. of Bronze shell: 200 mm. I.D. of Bronze shell : 184 mm O.D. of flange of Bronze shell : 264 mm Thickness of flange of Bronze shell:14mm (As per drawing)
Re-rubberisation of old and worn out Hanger Roller of KONE Lift Material: -Synthetic Rubber/Teflon O.D. of Hanger Roller with rubber: -85 mm Width of Hanger Roller: -19 mm
M/s Krishna Engineering Works
M/S ASHOK KUMAR ENGINEERING
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .