| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 CrAccepted-AOC VILLAGE VISHUNPURVA POST GANDHI NAGAR DISTRICT BASTI UP | BASTI | BASTI | UTTAR PRADESH | ₹5.0 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹5.2 Cr+₹21.8 L (4.33%)Rejected-Finance RAMSEWAKPURAM COLONY HARIHAR PUR NILMAYA SAROJININAGAR LUCKNOW | LUCKNOW | LUCKNOW | UTTAR PRADESH | ₹5.2 Cr+₹21.8 L (4.33%) | L2 | Rejected-Finance L2 |
| 3 | L3₹5.5 Cr+₹42.7 L (8.49%)Rejected-Finance VILLAGE PATHRA POST BADGO THANA KHORABAR DISTRICT GORAKHPUR UTTAR PRADESH | GORAKHPUR | UTTAR PRADESH | ₹5.5 Cr+₹42.7 L (8.49%) | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | M/S AJIT CONSTRUCTION AND ORDER SUPPLIER L3 | M/s Akhilesh Kumar Shukla Contractor L1 | M/s Rai Construction L2 |
|---|---|---|---|---|---|---|
| 1.00 | Earth Work in cutting for making Canal section in all types of soil including lead upto 30.00 m, lift upto 1.50 m and disposal of surplus earth to spoil banks with manual compaction & dressing to profile required for proper completion of work including cost of all labour, T&P etc. | 8,889.74 | Cum | 50 ₹4,44,487 Lowest | 60 ₹5,33,384.4 | 65 ₹5,77,833.1 |
| 2.00 | Earth Work in filling for making Canal Section from earth borrowed from Private Land with lead upto 1.00 km by power transport and lift up to 1.50 m with manual compaction & dressing to profile required for proper completion of work including cost of all labour, T&P etc. | 1,39,287.59 | Cum | 120 ₹1,67,14,510.8 | 120 ₹1,67,14,510.8 | 105 ₹1,46,25,196.95 Lowest |
| 3.00 | Excavation of foundation in Mar, Rankar and kankar mixed soils including lift up to 1.5 meter and lead upto 30 meter including filling, watering, ramming, of excavated earth into the trenches or upto the space and sides of the foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer-in-charge upto a distance of 30 meter from the foundation trenches. including cost of all labour, T&P etc. | 7,425.07 | Cum | 70 ₹5,19,754.9 Lowest | 70 ₹5,19,754.9 Lowest | 100 ₹7,42,507 |
| 4.00 | Earth Work in filling for making Diversion/Approach Road/Ramp with carriage upto 1.00 km by power transport and lift up to 1.50 m manual compaction & dressing to profile required for proper completion of work including cost of all labour, T&P etc. | 2,625.35 | Cum | 110 ₹2,88,788.5 | 60 ₹1,57,521 Lowest | 70 ₹1,83,774.5 |
| 5.00 | Centering & shuttering for C.C. work in different parts of structures with all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour, T.&P. etc.Centering & shuttering per sqm. | 2,175.66 | Sqm | 250 ₹5,43,915 | 150 ₹3,26,349 Lowest | 280 ₹6,09,184.8 |
| 6.00 | Centering & shuttering for R.C.C. work in different parts of structures with all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour, T.&P. etc.Centering & shuttering . | 1,537.41 | Sqm | 450 ₹6,91,834.5 | 350 ₹5,38,093.5 Lowest | 550 ₹8,45,575.5 |
| 7.00 | Cutting Bending Binding and placing TMT steel bars for reinforcement with cost of binding wire in all structures required for proper completion of work including cost of all materials, labour, T&P etc. | 70.84 | MT | 75,000 ₹53,13,000 | 60,000 ₹42,50,400 | 50,000 ₹35,42,000 Lowest |
| 8.00 | Filling/Laying Local Sand in Bed & Side slope required for proper completion of work including cost of all material, labour, T&P etc. | 282.7 | Cum | 900 ₹2,54,430 Lowest | 950 ₹2,68,565 | 1,100 ₹3,10,970 |
| 9.00 | Providing and Laying C.C A-40 M-10-in foundation of all structures with cement (O.P.C. 43 Golease sand of FM-not less than 2.0 and hard stone ballast (20 - 40 mm size) including lead upto 60.0 m, lift upto 3,0 m, mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work, including cost of all material T. & P., labour etc. | 235.33 | Cum | 5,000 ₹11,76,650 | 4,200 ₹9,88,386 Lowest | 5,000 ₹11,76,650 |
| 10.00 | Providing and Laying C.C. A20, M-15 with cement (O.P.C., 43 Grade), coarse sand of F.M. not less than 2.0 and crushed stone grit 4.75mm to 20mm size including lead upto 60.0m, lift upto 3.0 m, mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all material T. & P., labour etc. | 857.72 | Cum | 5,500 ₹47,17,460 | 4,500 ₹38,59,740 Lowest | 5,500 ₹47,17,460 |
Tender Value
₹7.5 Cr
EMD Value
₹14.9 L
Closing Date
13 Feb 2026, 2:00 pmClosed
SE, KBLCCC, BANDA
Office of The Superintending Engineer, Ken-Betwa Link Canal Construction Circle, Banda, Address-Nawab Tank, Banda-210001
Restoration of Dys and Minors offtaking from km. 0.000 to km. 59.338 of Ken Main Canal in Ken Canal System under Ken-Betwa Link Project
2026_UPIDC_1104143_1
04/SE/2025-26
Open Tender
Civil Works - Canal
Item Rate
547 days
BANDA
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,354
₹14.9 L
Office of The Superintending Engineer
14 May 2026
6 Jan 2026
13 Feb 2026
6 Jan 2026
13 Feb 2026
6 Jan 2026
16 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Work in cutting for making Canal section in all types of soil including lead upto 30.00 m, lift upto 1.50 m and disposal of surplus earth to spoil banks with manual compaction & dressing to profile required for proper completion of work including cost of all labour, T&P etc. | 8,889.74 | Cum | - | - |
| 2 | Earth Work in filling for making Canal Section from earth borrowed from Private Land with lead upto 1.00 km by power transport and lift up to 1.50 m with manual compaction & dressing to profile required for proper completion of work including cost of all labour, T&P etc. | 1,39,287.59 | Cum | - | - |
| 3 | Excavation of foundation in Mar, Rankar and kankar mixed soils including lift up to 1.5 meter and lead upto 30 meter including filling, watering, ramming, of excavated earth into the trenches or upto the space and sides of the foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer-in-charge upto a distance of 30 meter from the foundation trenches. including cost of all labour, T&P etc. | 7,425.07 | Cum | - | - |
| 4 | Earth Work in filling for making Diversion/Approach Road/Ramp with carriage upto 1.00 km by power transport and lift up to 1.50 m manual compaction & dressing to profile required for proper completion of work including cost of all labour, T&P etc. | 2,625.35 | Cum | - | - |
| 5 | Centering & shuttering for C.C. work in different parts of structures with all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour, T.&P. etc.Centering & shuttering per sqm. | 2,175.66 | Sqm | - | - |
| 6 | Centering & shuttering for R.C.C. work in different parts of structures with all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour, T.&P. etc.Centering & shuttering . | 1,537.41 | Sqm | - | - |
| 7Cutting Bending Binding and placing TMT steel bars for reinforcement with cost of binding wire in all structures required for proper completion of work including cost of all materials, labour, T&P etc. | |||||
| 8 | Filling/Laying Local Sand in Bed & Side slope required for proper completion of work including cost of all material, labour, T&P etc. | 282.7 | Cum | - | - |
| 9 | Providing and Laying C.C A-40 M-10-in foundation of all structures with cement (O.P.C. 43 Golease sand of FM-not less than 2.0 and hard stone ballast (20 - 40 mm size) including lead upto 60.0 m, lift upto 3,0 m, mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work, including cost of all material T. & P., labour etc. | 235.33 | Cum | - | - |
| 10 | Providing and Laying C.C. A20, M-15 with cement (O.P.C., 43 Grade), coarse sand of F.M. not less than 2.0 and crushed stone grit 4.75mm to 20mm size including lead upto 60.0m, lift upto 3.0 m, mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all material T. & P., labour etc. | 857.72 | Cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
BD-NIT04-SE-25-LOT01.pdf
Tender Documents • 2.23 MB
BOQ_2036596.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .