| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 CrAccepted-AOC VILLAGE VISHUNPURVA POST GANDHI NAGAR DISTRICT BASTI UP | BASTI | BASTI | UTTAR PRADESH | ₹5.0 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹5.2 CrRejected-Finance RAMSEWAKPURAM COLONY HARIHAR PUR NILMAYA SAROJININAGAR LUCKNOW | LUCKNOW | LUCKNOW | UTTAR PRADESH | ₹5.2 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹5.5 CrRejected-Finance VILLAGE PATHRA POST BADGO THANA KHORABAR DISTRICT GORAKHPUR UTTAR PRADESH | GORAKHPUR | UTTAR PRADESH | ₹5.5 Cr | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | M/S AJIT CONSTRUCTION AND ORDER SUPPLIER L3 | M/s Akhilesh Kumar Shukla Contractor L1 | M/s Rai Construction L2 |
|---|---|---|---|---|---|---|
| 1.00 | Earth Work in cutting for making Canal section in all types of soil including lead upto 30.00 m, lift upto 1.50 m and disposal of surplus earth to spoil banks with manual compaction & dressing to profile required for proper completion of work including cost of all labour, T&P etc. | 8,889.74 | Cum | 50 ₹4.4 L | 60 ₹5.3 L | 65 ₹5.8 L |
| 2.00 | Earth Work in filling for making Canal Section from earth borrowed from Private Land with lead upto 1.00 km by power transport and lift up to 1.50 m with manual compaction & dressing to profile required for proper completion of work including cost of all labour, T&P etc. | 1,39,287.59 | Cum | 120 ₹1.7 Cr | 120 ₹1.7 Cr | 105 ₹1.5 Cr |
| 3.00 | Excavation of foundation in Mar, Rankar and kankar mixed soils including lift up to 1.5 meter and lead upto 30 meter including filling, watering, ramming, of excavated earth into the trenches or upto the space and sides of the foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer-in-charge upto a distance of 30 meter from the foundation trenches. including cost of all labour, T&P etc. | 7,425.07 | Cum | 70 ₹5.2 L | 70 ₹5.2 L | 100 ₹7.4 L |
| 4.00 | Earth Work in filling for making Diversion/Approach Road/Ramp with carriage upto 1.00 km by power transport and lift up to 1.50 m manual compaction & dressing to profile required for proper completion of work including cost of all labour, T&P etc. | 2,625.35 | Cum | 110 ₹2.9 L | 60 ₹1.6 L | 70 ₹1.8 L |
| 5.00 | Centering & shuttering for C.C. work in different parts of structures with all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour, T.&P. etc.Centering & shuttering per sqm. | 2,175.66 | Sqm | 250 ₹5.4 L | 150 ₹3.3 L | 280 ₹6.1 L |
| 6.00 | Centering & shuttering for R.C.C. work in different parts of structures with all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour, T.&P. etc.Centering & shuttering . | 1,537.41 | Sqm | 450 ₹6.9 L | 350 ₹5.4 L | 550 ₹8.5 L |
| 7.00 | Cutting Bending Binding and placing TMT steel bars for reinforcement with cost of binding wire in all structures required for proper completion of work including cost of all materials, labour, T&P etc. | 70.84 | MT | 75,000 ₹53.1 L | 60,000 ₹42.5 L | 50,000 ₹35.4 L |
| 8.00 | Filling/Laying Local Sand in Bed & Side slope required for proper completion of work including cost of all material, labour, T&P etc. | 282.7 | Cum | 900 ₹2.5 L | 950 ₹2.7 L | 1,100 ₹3.1 L |
| 9.00 | Providing and Laying C.C A-40 M-10-in foundation of all structures with cement (O.P.C. 43 Golease sand of FM-not less than 2.0 and hard stone ballast (20 - 40 mm size) including lead upto 60.0 m, lift upto 3,0 m, mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work, including cost of all material T. & P., labour etc. | 235.33 | Cum | 5,000 ₹11.8 L | 4,200 ₹9.9 L | 5,000 ₹11.8 L |
| 10.00 | Providing and Laying C.C. A20, M-15 with cement (O.P.C., 43 Grade), coarse sand of F.M. not less than 2.0 and crushed stone grit 4.75mm to 20mm size including lead upto 60.0m, lift upto 3.0 m, mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all material T. & P., labour etc. | 857.72 | Cum | 5,500 ₹47.2 L | 4,500 ₹38.6 L | 5,500 ₹47.2 L |
Tender Value
₹7.5 Cr
EMD Value
₹14.9 L
Closing Date
13 Feb 2026, 2:00 pmClosed
SE, KBLCCC, BANDA
Office of The Superintending Engineer, Ken-Betwa Link Canal Construction Circle, Banda, Address-Nawab Tank, Banda-210001
Restoration of Dys and Minors offtaking from km. 0.000 to km. 59.338 of Ken Main Canal in Ken Canal System under Ken-Betwa Link Project
2026_UPIDC_1104143_1
04/SE/2025-26
Open Tender
Civil Works - Canal
547 days
BANDA
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,354
₹14.9 L
Office of The Superintending Engineer
14 May 2026
6 Jan 2026
13 Feb 2026
6 Jan 2026
13 Feb 2026
6 Jan 2026
16 Jan 2026
Earth Work in cutting for making Canal section in all types of soil including lead upto 30.00 m, lift upto 1.50 m and disposal of surplus earth to spoil banks with manual compaction & dressing to profile required for proper completion of work including cost of all labour, T&P etc.
Earth Work in filling for making Canal Section from earth borrowed from Private Land with lead upto 1.00 km by power transport and lift up to 1.50 m with manual compaction & dressing to profile required for proper completion of work including cost of all labour, T&P etc.
Excavation of foundation in Mar, Rankar and kankar mixed soils including lift up to 1.5 meter and lead upto 30 meter including filling, watering, ramming, of excavated earth into the trenches or upto the space and sides of the foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer-in-charge upto a distance of 30 meter from the foundation trenches. including cost of all labour, T&P etc.
Earth Work in filling for making Diversion/Approach Road/Ramp with carriage upto 1.00 km by power transport and lift up to 1.50 m manual compaction & dressing to profile required for proper completion of work including cost of all labour, T&P etc.
Centering & shuttering for C.C. work in different parts of structures with all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour, T.&P. etc.Centering & shuttering per sqm.
Centering & shuttering for R.C.C. work in different parts of structures with all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour, T.&P. etc.Centering & shuttering .
Cutting Bending Binding and placing TMT steel bars for reinforcement with cost of binding wire in all structures required for proper completion of work including cost of all materials, labour, T&P etc.
Filling/Laying Local Sand in Bed & Side slope required for proper completion of work including cost of all material, labour, T&P etc.
Providing and Laying C.C A-40 M-10-in foundation of all structures with cement (O.P.C. 43 Golease sand of FM-not less than 2.0 and hard stone ballast (20 - 40 mm size) including lead upto 60.0 m, lift upto 3,0 m, mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work, including cost of all material T. & P., labour etc.
Providing and Laying C.C. A20, M-15 with cement (O.P.C., 43 Grade), coarse sand of F.M. not less than 2.0 and crushed stone grit 4.75mm to 20mm size including lead upto 60.0m, lift upto 3.0 m, mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all material T. & P., labour etc.
Providing and Laying C.C. A20, M-20 with cement (O.P.C., 43 Grade), coarse sand of F.M. not less than 2.0 and crushed stone grit 4.75mm to 20mm size including lead upto 60.0m, lift upto 3.0 m, mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all material T. & P., labour etc.
Providing and Laying R.C.C. A20, M-20 with cement (O.P.C., 43 Grade), coarse sand of F.M. not less than 2.0 and crushed stone grit 4.75mm to 20mm size including lead upto 60.0m, lift upto 3.0 m, mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all material T. & P., labour etc.
Laying C.C. A20, M-25 with cement (O.P.C., 43 Grade), coarse sand of F.M. not less than 2.0 and crushed stone grit 4.75mm to 20mm size including lead upto 60.0m, lift upto 3.0 m, mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all material T. & P., labour etc. [As per Mix Design]
Laying R.C.C. A20, M-25 with cement (O.P.C., 43 Grade), coarse sand of F.M. not less than 2.0 and crushed stone grit 4.75mm to 20mm size including lead upto 60.0m, lift upto 3.0 m, mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all material T. & P., labour etc. [As per Mix Design]
Laying C.C. A20, M -30 with cement (O.P.C., 43 Grade), coarse sand of F.M. not less than 2.0 and crushed stone grit 4.75mm to 20mm size including lead upto 60.0m, lift upto 3.0 m, mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all material T. & P., labour etc. per Cum
Dewatering by pump hiring of pump & POL/KWH Including all cost of material labour etc .
S/F Drainage spout pipe 100 mm dia In RCC slab required for proper completion of work including cost of all materials, labour, T.& P. etc
Providing and laying 1200mm dia Non Pressure NP-3 class (Medium duty) R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement :2 fine sand) including testing of joints etc. complete .
Providing and laying NP-3 class R.C.C. Hume pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement :2 fine sand) including testing of joints etc. complete per RM.
110 mm dia pipe
160 mm dia pipe
Brick on edge soling on approach road, diversion and ramp with preparation of subgrade and filling joints with local earth required for proper completion of work including cost of all material, labour and T.& P. etc.
Brick work in 1:4 cement mortar with 1st Class Brick, coarse sand of F.M. not less than 2.0 required for proper completion of work including cost of all materials, labour, T&P etc.
Laying Cement plaster 12.50 mm thick in 1:6 Cement Sand mortar required for proper completion of work including cost of all materials, labour, T&P etc.
Providing & Laying R.C.R. 1 : 4 Cement Sand Mortar required for proper completion of work including cost of all materials, labour, T&P etc.
Struck Raised Pointing on stone masonry in C.M. 1 : 2 required for proper completion of work including cost of all material T&P, labour etc.
Struck Deep Pointing on Brick masonry in C.M. 1 : 2 required for proper completion of work including cost of all materials, labour, T&P etc.
Laying stone grit 10-20 mm gauge as a filter material required for proper completion of work including cost of all materials, labour, T&P etc.
Supply & laying of stone grit 20-40 mm gauge as a filter material i/e all cost of material labour and T & P etc.
Laying Boulder Apron for Bed protection with old stone boulder taken from demolished structure required for proper completion of work including cost of all materials, labour, T&P etc.
Preparation of Subgrade required for proper completion of work including cost of all materials, labour, T&P etc.
Filling/Laying Coarse sand as a filter material below lining required for proper completion of work including cost of all materials, labour, T&P etc.
Laying Cement plaster 1:6 Cement Sand mortar required for proper completion of work including cost of all materials, labour, T&P etc.
Supplying/Laying two coat Bitumen painting on sleeper top with cost of Bitumen, fuel for heating required for proper completion of work including cost of all materials, labour, T&P etc.
Supply & laying of 200 micron L.D.P.E film over plaster work required for proper completion of work including cost of all materials, labour, T&P etc.
Providing & Laying 75 mm thick C.C. lining in A20, M-20 with 4.75 mm to 20 mm hard stone grit and coarse sand of F.M. not less than 2.0 on Bed and Side Slope required for proper completion of work including cost of all materials, labour, T&P etc..
Making construction joint in lining & filling sealing compound in joint required for proper completion of work including cost of all materials, labour, T&P etc.
Dismantling reinforce cement concrete including disposal of unserviceable material and stacking the serviceable material.
Dismantling of bricks or stone masonry in lime or cement mortar. including disposal of unserviceable material and stacking the serviceable material.
Cutting heavy under growth and bushes upto 7.5cm dia i/c removal of roots with collection and removal i/c all cost of labour, T&P etc. complete work.
Cutting heavy under growth trees from 7.5cm to 20cm dia i/c removal of roots with collection and removal i/c all cost of labour, T&P etc. complete work.
Dismantling plain cement concrete including disposal of unserviceable material and stacking the serviceable material.
Earth Work in Dismantling of Diversion/Approach Road/Ramp (Head Discharge below 6.00 Cumec) required for proper completion of work including cost of all labour and T&P etc.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
BD-NIT04-SE-25-LOT01.pdf
Tender Documents • 2.23 MB
BOQ_2036596.xls
BOQ • 0.34 MB