Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.6 LAccepted-AOC | ₹8.6 L | L1 | Accepted-AOC Na |
| 2 | L2₹9.1 L+₹59,309.83 (6.93%)Rejected-AOC | ₹9.1 L+₹59,309.83 (6.93%) | L2 | Rejected-AOC Na |
| 3 | L3₹9.3 L+₹78,577.46 (9.18%)Rejected-AOC CHINTAMAN VASTI GAT NO 272 3 AT POST AKOLE KHURD TALUKA MADHA SOLAPUR MAHARASHTRA 413211 | SOLAPUR | MAHARASHTRA | 413211 | ₹9.3 L+₹78,577.46 (9.18%) | L3 | Rejected-AOC Na |
| 4 | L4₹9.7 L+₹1.1 L (13.2%)Rejected-AOC | ₹9.7 L+₹1.1 L (13.2%) | L4 | Rejected-AOC Na |
Tender Value
₹10.8 L
EMD Value
₹10,764
Closing Date
23 Apr 2026, 5:00 pmClosed
V S Birhade
SDAO Akola, MIDCphase II, MurtizapurRoad, Akola
At - Dhakali, Kasarkhed, Dhaba, Rustamabad, Taluka- Barshitakali , Dist. - Akola ,
2026_DOA_1295667_1
JSA2.0/FRP/Bata/T-8/600/2026
Open Tender
Agricultural or Forestry
Percentage
60 days
At - Dhakali, Kasarkhed, Dhaba, Rustamabad
Plz Reffer Tender Document
8 documents required · 8 mandatory
₹590
₹10,764
SDAO Akola
23 Jun 2026
17 Apr 2026
25 Apr 2026
17 Apr 2026
23 Apr 2026
17 Apr 2026
20 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1FARM RECHARGE PIT | |||||
| 1.01 | Item No.1:- Excavation in all kinds of soil & Soft murum including boulders up to 0.6 m diameter (0.113 cum) for canal, seating of embankment, filter drains / catch water drains etc., and placing the excavated stuff neatly in dump area or for formation of service road / embankment as directed including cost of all materials, machinery, labour, dressing bed and sides to required level and profile etc. complete with leads up to 15 m and all lifts as directed.
A1= 1.5x1.5x0.30= 0.675 cum
Basic Rate as per S & w.c. Dept C.S.R.2022-23, Item No 1 ,Page No. 23 | - | Cum | - | - |
| 1.02 | Item No.2:- Excavation in hard murum including boulders up to 0.6 m diameter (0.113 cum) for canal, seating of embankment, filter drains / catch water drains etc., and placing the excavated stuff neatly in dump area or for formation of service road / embankment including cost of all materials, machinery, labour, dressing bed and sides to required level and profile etc., complete with leads Up to 15 M and all lifts as directed.
A2=1.5x1.5x1.5= 3.375 cum
Basic Rate as per S & w.c. Dept C.S.R.2022-23, Item No 2 ,Page No. 23 | - | Cum | - | - |
| 1.03 | Item No.3 :- Providing filter drains using Rubble satisfying specified filter criteria in layers of specified thickness including cost of all materials, machinery, labour, laying to required slopes ,compacting etc., complete as per specifications and approved drawing with lead up to 1 km and all lifts as directed
A1= 1.5x1.5x1.80= 4.05 cum (Rubble/StoneStone (80) + Metal (20) | - | Cum | - | - |
| 2Provision for labour welfare insurance charges at 1% of work cost | |||||
| 3Provision for work insurance charges at 1% of work cost | |||||
| 4GST 18 % | |||||
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
T8FRPBarshitakali1076404.pdf
Tender Documents • 1.79 MB
BOQ_2226070.xls
BOQ • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .