Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 CrAccepted-Finance | ₹3.9 Cr | L1 | Accepted-Finance QUALIFIED IN LOTTERY SYSTEM |
| 2 | L1₹3.9 CrRejected-Finance AT MAHABIRPADIA PO PS BHAWANIPATNA DIST KALAHANDI | BHAWANIPATNA | KALAHANDI | ODISHA | ₹3.9 Cr | L1 | Rejected-Finance NOT QUALIFIED IN LOTTERY SYSTEM |
| 3 | L1₹3.9 CrRejected-Finance | ₹3.9 Cr | L1 | Rejected-Finance NOT QUALIFIED IN LOTTERY SYSTEM |
| 4 | L1₹3.9 CrRejected-Finance R O BIMAL HOTA GALI WARD NO 27 PO BUDHARAJA PS AINTHAPALI DIST SAMBALPUR | ₹3.9 Cr | L1 | Rejected-Finance NOT QUALIFIED IN LOTTERY SYSTEM |
| 5 | L1₹3.9 CrRejected-Finance | ₹3.9 Cr | L1 | Rejected-Finance NOT QUALIFIED IN LOTTERY SYSTEM |
Tender Value
₹3.9 Cr
EMD Value
₹3.9 L
Closing Date
16 Jun 2026, 5:00 pmClosed
Circle Officer
RURAL WORKS CIRCLE , SAMBALPUR
Construction of H.L. bridge over Local Nallah on Lepeikani to Bebejuri road
2026_CERWI_131362_1
Bridge Tender Online RWCSBP-06/2026-27
Open Tender
Civil Works - Bridges
Percentage
365 days
Kuchinda
2 documents required · 2 mandatory
₹10,000
₹3.9 L
Yes
3 Aug 2026
6 Jun 2026
17 Jun 2026
6 Jun 2026
16 Jun 2026
6 Jun 2026
6 Jun 2026 - 12 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation of over burden soil for bridge works in all kinds of soil by mechanical means and utilising the surplus earth locally for road work where ever required, back filling the excavated earth to the extent required complete in all respect as per approved drawing and technical specifications Section 900 and Clause 301 & 304 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of the Engineer-in-Charge. | 2,571.68 | cum | 235.74 | ₹6,06,247.84 |
| 2 | Earthwork in excavation for bridge works in all kinds of soil, by mechanical means utilising the surplus earth locally for road work where ever required, back filling the excavated earth to the extent required complete in all respect as per approved drawing and technical specifications as per Section 900 and Clause 301 & 304 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of the Engineer-in-Charge. | 2,038.02 | cum | 388.8 | ₹7,92,382.18 |
| 3 | Providing Plain Cement concrete (1:3:6) mix with crushed stone aggregate of 4cm nominal size mechanically mixed ,placed in foundation & below approach slab compacted by vibrator, providing groove & beads where necessary including curing, dewatering, shoring, shuttering if necessary at the time of laying concrete with cost, conveyance royality & taxes of all material required for the work including supplying & working pumps, T&P articles finishing the exposed surface smooth as per section 2100 of MoRT&H specifications for Road & Bridge works (5th Revision) and as per direction of the Engineer-in-Charge. Foundation | 158.98 | cum | 6,259.28 | ₹9,95,100.33 |
| 4 | Providing and laying Plain cement concrete of grade M-15 in foundation , substructure of bridge works, drain & protection wall etc complete as per drawing and technical specification using High Strength approved quality Cement and coarse granite aggregate with formwork as per Section 900,1000,1500,1700, 2100 & 2200 of MORT&H specifications for Road and Bridge works of (5th Revision) as per direction of the Engineer-in-charge. Foundation | 82.26 | cum | 5,896.25 | ₹4,85,025.53 |
| 5 | Upto Bed | 456.4 | cum | 6,038.29 | ₹27,55,875.56 |
| 6 | Providing RCC of grade M-30 in the following structures as per approved drawing and technical specifications as per Section 900, 1000, 1500, 1600, 1700, 2200, 2300 & 2700 of MoRT&H specifications for Road & Bridge works (5th Revision) and as per direction of the Engineer-in-Charge. Abutment & Pier Shaft Foundation | 352.36 | cum | 9,334.57 | ₹32,89,129.09 |
| 7 | Abutment & Pier Shaft Above Bed | 313.27 | cum | 9,560.55 | ₹29,95,033.5 |
| 8 | Column / Wing Wall / Tie Beam | 4.88 | cum | 16,232.16 | ₹79,212.94 |
| 9 | Abutment & pier cap | 13.13 | cum | 9,257.29 | ₹1,21,548.22 |
| 10 | Dirt wall | 4.03 | cum | 12,593.1 | ₹50,750.19 |
stage.html
html • 0.09 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 4.65 MB
Tendernotice_1.pdf
PDF • 1.35 MB
BOQ_595019.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .