Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.1 LAccepted-AOC | ₹6.1 L | L1 | Accepted-AOC Work order issued |
| 2 | L1₹6.1 LRejected-Finance | ₹6.1 L | L1 | Rejected-Finance L1 tenderer but could not win the transparent lottery context |
| 3 | L1₹6.1 LRejected-Finance AT WR NO 8 PO BARIPADA PS BARIPADA DIST MAYURBHANJ | ₹6.1 L | L1 | Rejected-Finance L1 tenderer but could not win the transparent lottery context |
| 4 | L1₹6.1 LRejected-Finance | ₹6.1 L | L1 | Rejected-Finance L1 tenderer but could not win the transparent lottery context |
| 5 | L1₹6.1 LRejected-Finance | ₹6.1 L | L1 | Rejected-Finance L1 tenderer but could not win the transparent lottery context |
Tender Value
Refer Docs
EMD Value
₹6,110
Closing Date
7 May 2026, 5:00 pmClosed
SE Mayurbhanj (R and B) Division Baripada
O/o the SE Mayurbhanj (R and B) Division Baripada
S/R such as Repair to Residence of Sub-Collector at Baripada for the year 2026-27 (Now occupied by Kasturi Panda (I.A.S).
2026_EICCL_128600_1
Bid Id No. SE- 04/2026-27
Open Tender
Civil Works - Buildings
Percentage
30 days
Baripada
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,000
₹6,110
Yes
4 Jun 2026
29 Apr 2026
8 May 2026
29 Apr 2026
7 May 2026
29 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Removing old tarfelt from roof, cleaning the surface lowering and removing the debries within 50 mtr. lead | 96.62 | Sqm | 98.35 | ₹9,502.58 |
| 2 | Providing and laying bituminous membrane plastic felt over roof 2.00mtr thick cost of all labour (T&P) etc. | 96.62 | Sqm | 483.1 | ₹46,677.12 |
| 3 | Dismantling and removing old tile flooring including removing the base course & removing the debries within 50m lead etc. | 37.16 | Sqm | 140.5 | ₹5,220.98 |
| 4 | Providing fitting and fixing of industrial parking tile in floor cost of all labour (T&P) etc. | 37.16 | Sqm | 1,230.18 | ₹45,713.49 |
| 5 | Providing fitting and fixing of mosquito net in windows including non-sal wood blading with cost of nails etc complete | 36.79 | Sqm | 429.37 | ₹15,796.52 |
| 6 | Cement concrete (1:2:4) using 12mm size c.b.g. chips cost of all labour (T&P) etc. | 2.4 | Sqm | 8,020.1 | ₹19,248.24 |
| 7 | 12 mm thick Cement plaster (1:6) over brick walls after racking out joints watering and curing etc. | 133.78 | Sqm | 190.15 | ₹25,438.27 |
| 8 | Finishing the wall surface with two coats of plastic paint over a coats of plastic paint over a coat of primer, cost of all labour (T&P) etc. | 728.24 | Sqm | 189.08 | ₹1,37,695.62 |
| 9 | Finishing the wall surface with wall putty cost of all labour (T&P) etc. | 364.12 | Sqm | 89.6 | ₹32,625.15 |
| 10 | Finishing the outside wall surface with two coats of weather seal coat over a coat of primer cost of all labour (T&P) etc. | 1,243.41 | Sqm | 181.16 | ₹2,25,256.16 |
stage.html
html • 0.28 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_589134.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
dtcn.pdf
Tender Documents • 5.01 MB
BOQ_589134.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .