S.E., E.T.C., Bareilly
Superintending Engineer Hydel Campus, Near L.I.C. Office Rampur Garden, Bareilly
Installation of 33KV 10MVAR Capacitor Bank alongwith associated Bay and other associated Works at 132KV S.A.S. Sub Station Sahaswan under E.T.D., Budaun
2019_UPTCL_402296_1
E-Tender No. 53 / W / ETC(B) / 2019 - 20
Open Tender
Electrical Works
30 days
Budaun
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
A/c No 10897666087 IFSC SBIN0000615 S.B.I. Bly
₹2,000
22 Sept 2020
11 Nov 2019
23 Nov 2019
11 Nov 2019
22 Nov 2019
11 Nov 2019
11 Nov 2019 - 22 Nov 2019
Amount
Installation of 33KV 10MVAR Capacitor Bank alongwith associated Bay and other associated Works at 132KV S.A.S. Sub Station Sahaswan, with all Cost of Men, Misc. Consumables, T&Ps etc. Required for Satisfactory Completion of the Work as per Technical Specifications and Direction of the Supervising Engineer as per Site Requirement and Details below : (1) Erection of Main & Auxiliary Lattice type Structures including their Shifting from Storage Place at the Sub Station to Erection Site.
(2) Stringing of 33KV Aux. Main Bus Bar of Span approx. 18 Meter with Single ACSR Panther Conductor for Capacitor Bank including Hoisting of Disc Insulator Tension Strings with associated Tension Fittings alongwith Shifting of the Conductor, Tension Fittings, Clamps etc. from Storage Place at the Sub Station to Erection Site. (1 Job for each Phase of the Jack Bus Bar)
(3) Erection of Following Equipments including Shifting from Storage Place at the Sub Station to Erection Site : (a) Capacitor Bank Units with associated Structure and Inter Connection of Unit Cells as per Drawing
(b) 33KV V.C.B.
(c) 33KV 3f Bus Isolator with associated P.I. & without Earth Blade
(d) 33KV 3f Line Isolator with associated P.I. & with Earth Blade
(e) 33KV 3f P.T.
(f) 33KV 1f C.T.
(g) 33KV 1f N.C.T.
(h) 33KV 1f Series Reactor
(i) 33KV C.T. Junction Box
(j) 33KV P.T. Junction Box
(k) Capacitor Bank Control & Relay Panel
(4) Interconnection & Jumpering of various Equipments with Single ACSR Panther Conductors in Capacitor Bank Bay to Connect Bus / Line Isolators, C.B., CTs., Capacitor Units, Series Reactors, NCTs etc. with the help of suitable Clamps / Connectors including, Cutting, Bending, Shaping etc. of the Conductor as per Site Requirement alongwith Shifting of Required Materials from Storage Place at the Sub Station to Erection Site.
(5) Laying of Following sizes Control Cables in Cable Trenches from Control & Relay Panels in Control Room to various Equipments, Junctions Boxes etc. in Switchyard as per Cable Schedule including its Saddling with 25×3 mm size Aluminium Saddle at every 750 mm Distance alongwith Shifting of Control Cables in Drums from Storage Place at the Sub Station to Erection Site and Shifting Back the Balance Cables & Drums to Stores at the Sub Station : (a) 2C x 2.5 mm2
(b) 4C x 2.5 mm2
(c) 6C x 2.5 mm2
(6) Inter-connection & Termination of above Laid Control Cables between C&R Panels in Control Room to various Equipments, Junctions Boxes etc. in Switchyard as per Cable Schedule including Making necessary Holes in Gland Plates or Boxes wherever Required alongwith Supply & Fixing of Cable Glands of Appropriate Sizes & Providing of Ferrules for each Core of the Cables and its Termination with Crimping type Copper Lugs including Preparation of Inter-connection Drawing and Commissioning of the Capacitor Banks in Co-ordination with T&C Wing alongwith Providing of 2 Sets of Hard Copies of as Executed Inter-connection Drawing.
(7) Cutting, Bending, Straightening & Laying 500 - 700 mm below inside the Ground & above the Ground of M.S. Flats to be Provided by the Department as per Requirement for Earthing of Main & Aux. Structures, Equipments, C&R Panels, Junction Boxes, Cable Trenches etc. including Welding, Drilling etc. aloongwith Painting of Earthing Strips with 1 Coat of Red Oxide Primer & 2 Coats (The 2nd Coat of Paint shall be Applied at the Gap of 48 hrs. when 1st Coat of Paint is Done & Checked by concerned J.E. / S.D.O.) of 1st Quality Synthetic Enamel Paint as per Details below : (a) Earthing of Main & Auxiliary Structures and Equipments in Extended Switchyard & Capacitor Bank Bay in Switchyard with 50×6 mm size M.S. Flat including Painting of Earthing Strips above Ground Level in Green Colour.
(b) Earthing of 33KV Control & Relay Panel of Capacitor Bank at 2 Points with 50×6 mm / 25×5 mm size M.S. Flat including Painting of Earthing Strips in Green Colour. (1 Job per Point)
(c) Earthing of Cable Trench with 25 × 5 mm size M.S. Flat including Painting of Earthing Strips including Painting of Earthing Strips in Black Colour.
M/s S.S. Refregeration
SHRI BALAJI ENGG. WORKS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid