Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 2ND FLOOR SHOP NO 303 MARUTI PLAZA RONCHI BANGAR TOWNSHIP MATHURA | MATHURA | UTTAR PRADESH | 281001 | Admitted-Finance |
| 2 | Admitted-Finance B 36 NIRBHAY NAGAR COLONY GELANA ROAD SIKANDRA AGRA UTTAR PRADESH 282007 | AGRA | UTTAR PRADESH | 282007 | Admitted-Finance |
| 3 | Admitted-Finance 0 0 0 NEAR DAK BUNGLOW NH 1 A NH 1A UDHAMPUR UDHAMPUR JAMMU KASHMIR 182101 | UDHAMPUR | JAMMU AND KASHMIR | 182101 | Admitted-Finance |
Tender Value
₹8.8 L
EMD Value
₹10,000
Closing Date
24 Feb 2022, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Electricity Transmission Circle Agra Kakraitha Road, Near Amar Ujala Press, Sikandara , Agra
Patrolling and Maintenance of 132 KV Lines Under ETD-II Agra
2022_UPTCL_675256_1
ET_117_ETC_A_21_ 22
Open Tender
Electrical Works
Lump-sum
365 days
Agra
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
EE_ETD II Agra
₹10,000
28 Feb 2022
29 Jan 2022
25 Feb 2022
29 Jan 2022
24 Feb 2022
29 Jan 2022
120 days
Regular tower to tower ground patrolling of the following 132 KV lines including lopping & chpping of the trees in the 27 meter in corridor for 132 KV line, detecting defects like missing/theft members of tower, hot point puncture insulator disc, dislocation of vibration dampers/loose conductor/earth wire of following lines. Patrolling shall be done quaterly basis i.e. 4 time in a year.
132 KV Agra (4)-Foundry Nagar Line (15.2 Km)
132 KV Foundry Nagar - Taj Line (5.7 Km)
132 KV Agra (4)-Dayalbagh Line (1.1 Km)
132 KV Sikandra (2)-Bichpuri Line (19.8 Km)
132 KV Bodla - Agra South(4) Line (8.8 Km)
132 KV Agra South-Cantt Line (11.8 Km)
132 KV Sikandra-Bodla LIne. (3 Km)
Total= 15.2+5.7+1.1+19.8+8.8+11.8+3 =65.4 Kms. (65.4x4 times in year =261.6 Kms.)
Tightening of jumpers at Tention Towers (Tension Tower =117 ) total jumpers 3x117= 351 Nos.
Submission of patrolling report on prescribed computerized performa in 4 sets after each 7 lines patrolling duly binded. Total=(7 Line X 4) X4 times in year = 112 Nos.
Lopping, copping and cutting of trees branches in the 27 Meters corridor line and stacking of above cuttings at proper place far from the line ( 200x4 times in Year)
Clearing of nest from the tower insulator formed by birds.
Fabrication & fixing of tower members including carriage of steel angles from S/S store, punching hjoles for proper placement tightening of Nuts & bolts punching & chamfering at different tower location of above Transmissin lines.
Back filling of earth across the tower founddation wherever required including cost of material, labour, T&P etc. and its tranportation uip to the site.
Replacement of damaged jumpers at tesnion towers.
Replacement fo damaged/puncture insulators string at different tower locatio including carriage of material from store to work site of the above line. All the manpower & T&P shall ber provided by tenderers for completion of work.
For Suspension String
For Tension String
Emergency patrolling of 132 KV lines during tripping to detect the exact fault location & type of fault.
Jointing/Replacemnt of broken conductor
Jointing/Replacemnt of earthwire conductor
Dismentling work of damaged tower parts
Fabrication and errection of tower part like peak, crossarm, tower erection and other associative work at Transmissin lines.
P&H Engineering
SHIVAM ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .