Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.2 LAdmitted-Finance 02 SILI JAGEER PIPLIYA BAHERI BAREILLY UTTAR PRADESH 243202 | BAREILLY | UTTAR PRADESH | 243202 | L1 | Admitted-Finance | |
| 2 | L2₹34.8 L+₹7.6 L (28.0%)Admitted-Finance SUBHASH NAGAR BALLIA | BALLIA | BALLIA | UTTAR PRADESH | L2 | Admitted-Finance | |
| 3 | L3₹35.6 L+₹8.3 L (30.7%)Admitted-Finance 134 1 PURVI BAGH DELHI ROAD MEERUT | MEERUT | MEERUT | UTTAR PRADESH | L3 | Admitted-Finance | |
| 4 | L4₹39.0 L+₹11.8 L (43.2%)Admitted-Finance 0 0 0 NEAR DAK BUNGLOW NH 1 A NH 1A UDHAMPUR UDHAMPUR JAMMU KASHMIR 182101 | UDHAMPUR | JAMMU AND KASHMIR | 182101 | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | LASHANI ENTERPRISES L1 | ASHUTOSH ENTERPRISES L2 | SHIVAM ENTERPRISES L4 | Jagad Electrical & Fabricators L3 |
|---|---|---|---|---|---|---|---|
| 1.01HEIGHT RAISING & SHIFTING OF 132KV MORADABAD- GULABBARI LINE/132KV MORADABAD-RAMPUR CKT-II LINE (Between Tower Loc No. 292 to Tower Loc No. 290) ON BEHALF OF UP STATE BRIDGE CO. LTD. CORRIDOR UNDER ELECTRICITY TRANSMISSION DIVISION-II, MORADABAD. | |||||||
| 1.02SUPPLY PORITION | |||||||
| 1.03TOWER | |||||||
| 1.04 | Hot dip galvanised , Hexagon ,round hexagon head transmission tower bolt,nuts washer for above tower structure as per BOM (11.660x2+3.620x2+231.640x2+129.560x2 = 752.96 Kg.) | 0.75 | MT | 1,15,000 ₹86,590.4 Lowest | 1,21,330 ₹91,356.64 | 1,65,000 ₹1,24,238.4 | 1,30,000 ₹97,884.8 |
| 1.05TOWER & CONDUCTOR ACCESSORIES . | |||||||
| 1.06FOR ACCC HTLS (COPENHEGEN) CONDUCTOR. | |||||||
| 1.07 | Pipe Type Earthing material for Tower | 4 | Nos. | 2,200 ₹8,800 Lowest | 3,400 ₹13,600 | 4,000 ₹16,000 | 3,600 ₹14,400 |
| 1.08 | Double Suspension Fitting suitable for ACCC HTLS (COPENHEGEN) Conductor. | 3 | Nos. | 8,650 ₹25,950 Lowest | 11,420 ₹34,260 | 12,000 ₹36,000 | 11,420 ₹34,260 |
| 1.09 | Double tension fitting suitable for ACCC HTLS (COPENHEGEN) Conductor. | 18 | Nos. | 43,500 ₹7,83,000 | 42,250 ₹7,60,500 Lowest | 50,000 ₹9,00,000 | 42,250 ₹7,60,500 Lowest |
| 1.10 | Vibration Damper suitable for ACCC HTLS (COPENHEGEN) Conductor. | 24 | Nos. | 3,240 ₹77,760 | 1,770 ₹42,480 Lowest | 2,000 ₹48,000 | 1,770 ₹42,480 Lowest |
Tender Value
₹27.4 L
EMD Value
₹29,500
Closing Date
10 Sept 2025, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE, ETC-I Moradabad
220 KV Sub-Station Campus, Delhi Road, Moradabad
THE WORK FOR HEIGHT RAISING and SHIFTING OF 132KV MORADABAD GULABBARI LINE 132KV MORADABAD RAMPUR CKT-II UNDER ELECTRICITY TRANSMISSION DIVISION-II MORADABAD
2025_UPTCL_1061299_2
E-T-11/ETCM/2025-2026
Open Tender
Electrical Works
Fixed-rate
60 days
Moradabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
SE, ETC-I Moradabad
₹29,500
12 Sept 2025
4 Sept 2025
10 Sept 2025
4 Sept 2025
10 Sept 2025
4 Sept 2025
Amount
HEIGHT RAISING & SHIFTING OF 132KV MORADABAD- GULABBARI LINE/132KV MORADABAD-RAMPUR CKT-II LINE (Between Tower Loc No. 292 to Tower Loc No. 290) ON BEHALF OF UP STATE BRIDGE CO. LTD. CORRIDOR UNDER ELECTRICITY TRANSMISSION DIVISION-II, MORADABAD.
SUPPLY PORITION
TOWER
Hot dip galvanised , Hexagon ,round hexagon head transmission tower bolt,nuts washer for above tower structure as per BOM (11.660x2+3.620x2+231.640x2+129.560x2 = 752.96 Kg.)
TOWER & CONDUCTOR ACCESSORIES .
FOR ACCC HTLS (COPENHEGEN) CONDUCTOR.
Pipe Type Earthing material for Tower
Double Suspension Fitting suitable for ACCC HTLS (COPENHEGEN) Conductor.
Double tension fitting suitable for ACCC HTLS (COPENHEGEN) Conductor.
Vibration Damper suitable for ACCC HTLS (COPENHEGEN) Conductor.
Performed Armour Rod suitable for ACCC HTLS (COPENHEGEN) Conductor.
Polymer Insulator string 70 KN for 132 KV
Polymer Insulator string 120 KN for 132 KV
Circuit Plate (Set of two)
Phase Plate set of Red,Blue and Yellow for tension tower
Danger Plate
Number Plate
Mid span Joint suitable for ACCC HTLS (COPENHEGEN) Conductor.
Repair sleeve suitable for ACCC HTLS (COPENHEGEN) Conductor.
Anti Climbing Device
Jumper Cone suitable for ACCC HTLS (COPENHEGEN) Conductor.
FOR ACSR PANTHER CONDUCTOR.
Double Suspension Fitting suitable for ACSR PANTHER Conductor.
Double tension fitting suitable for ACSR PANTHER Conductor.
Vibration Damper suitable for ACSR PANTHER Conductor.
Polymer Insulator string 120 KN for 132 KV
Polymer Insulator string 70 KN for 132 KV
Phase Plate set of Red,Blue and Yellow for tension tower
Mid span Joint suitable for ACSR PANTHER Conductor.
Repair sleeve suitable for ACSR PANTHER Conductor.
Performed Armour rod for ACSR PANTHER
Jumper Cone suitable for ACSR Panther Conductor.
FOR Earthwire 7/3.25mm G.S /OPGW
48 fiber OPGW fiber optic cable.
Supply of hardware set for 48 fiber OPGW
Junction Box (48 Fiber )
ERECTION.
WORK PORTION
Check Survey & Final Peg Marking (Route Length)
Cost of excavation of 132 KV NBDB +9 mtr.Type Tower foundation pits including all earth work back filling, watering and leveling. NBDB +9 = 02 No.@ 194.90 CUM =389.80 CUM
Setting of Stubs including all foundation work but excluding cost of concreting and excavation (Rate per location) for 132 KV NBDB +9 Type Tower. NBDB +9 = 02 Nos.
Cost of concreting M:20 for all types of foundation including cost of cement, coarse sand, stone grid, dewatering shorting and shuttering, formaing curing etc. But excluding cost of reinforcement bars. NBDB +9 = 02 Nos.@ 19.12 CUM (FS)
Cost of concreting M:10 for all types of foundation including cost of cement, coarse sand, stone grid, dewatering, shorting and shuttering, forming, curing etc. NBDB +9 = 02 Nos.@ 2.78 CUM (FS)
Installation of steel re-inforcement bars in RCC foundation including cost of cutting, welding, binding and placing them in foundation pit. NBDB +9 = 02 Nos.@ 1.121 MT
Erection of Super Structure of 132 KV NBDB +9 Type Tower (TRANSRAIL LIGHTING LTD Design) and their extension including all works above ground level and fitting of danger, number and phase plate bird gurad.
Laying, stringing, tensioning, clamping, jointing etc. of all 03 phases of ACCC HTLS (COPENHEGEN) Conductor. (for HTLS Replacement) including hoisting of insulators, fitting of all necessary hardware & accessories i.e fittings, Performed Armour rods, vibration dampers etc. along with all related works upto re-energization of line.
Laying, stringing, tensioning clamping, jointing etc. of all 03 phases of ACSR PANTHER conductor including hoisting of insulators, fitting of all necessary hardware & accessories i.e fittings, Performed Armour rods, vibration dampers etc. along with all related works upto re-energization of line.
Laying, Stringing, Tensioning, Clamping, Jointing, including fitting of all necessary hardware and accessories of OPGW & OFAC termination at S/S end to end connectivity and testing etc. on 132 KV Line.
Splicing & Installtion of Joint Box (48 Fibre)
Pipe Type Earthing of newly Towers.
Tack welding of all the bolts up to the height of one section or 5 Mtrs. From ground level whichever is higher with three tacks of 10 mm/12 mm2 eletrodes and applicable of 2 inc rich point on the effected surface including cost of materials(8/-per bolt)
Providing barricade for avoiding any accident during the period of excavation to back filling of soil
Carriage of materials from sub-station/storage place to site of work as per site requirement with all cost of men, T&P, vehicle etc required for work.
DISMANTLING WORK
Dismantling of all 3 phases of existing ACCC HTLS Conductor, all hardware fittings & conductor accessories e.g. Performed armour rod, vibration dampers, insulator strings etc. of existing line and re-rolling of dismantled conductor on empty drums for re-use, safely transportation of all removed material to UPPTCL stores.
Dismantling of all 3 phases of existing ACSR Wolf Conductor ,all hardware fitting& conductor accessories e.g. Performed Armour rod, vibration damper,insulator string etc.of exsiting line and re-rolling of dismantled conductor on empty drum for re-use,safely transportation of all removed material to UPPTCL stores.
Destringing of 48 fiber OPGW cable along with hardware fittings, joint box and etc proper Re-rolling on empty drum of OPGW & safely transportation of all removed materials to UPPTCL stores etc
Dismantling of existing 132 KV D/C Towers after cutting/opening of nuts, bolts section by section after cutting of tack welding bolts etc, as per direction of Supervision Engineer with all cost of men, T&P required for work. (Along with Stacking)
Dismantaling of earlier foudation which includes Excavation, Breaking of foundation up to 2 Mtr. depth and removing of concrete, Cutting, removing of stub and steel reinforcement, Backfilling, levelling and making field suitablefor agriculture.
Carriage of dismantaled materials from site of work to sub-station/storage place as per site requirement with all cost of men, T&P, vehicle etc required for work.{(approx weight = 3 MT (Tower Weight = 3 MT, Conductor Weight = 3 MT & other Acessories.)}
ASHUTOSH ENTERPRISES (BID ID -5522772)
Jagad Electrical & Fabricators (BID ID -5525156)
SHIVAM ENTERPRISES (BID ID -5525507)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .